BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates,

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Arizona Corporation Commission Workshop
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Public Service Company of New Mexico
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
2006 BTA 8/5/ SSC-1 ACC BTA Requirements SRP’s Ten Year Plan Presentation Chuck Russell Salt River Project June 6, 2006 Phoenix, Arizona Arizona.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Topics to Cover Interconnection Process Overview
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Electrical Resistance and Ohm’s Law Electric circuits are used to convert electrical energy into some other form of energy we need.
SOUTHERN CALIFORNIA EDISON SM Local Capacity Requirements (LCR) RFO for New Resources and Other SCE Solicitations Stu Hemphill September 26, 2013.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
California Energy Commission Drought Impacts on Electricity Generation Joint Workshop on California’s Drought Response Sylvia Bender, Deputy Director Energy.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Large Generator Interconnection Procedures Reform 2 nd Stakeholder Meeting May 5, 2009.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
Yellowhead Area Transmission System Development
APS Ten-Year Plans th BTA Presentation
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
CSC DETERMINATION PROCESS
Impact of Hurricane Ike on
SOLAR PROGRAMS Presented By Benjamin H. Jordan, P.E. 4/2016.
Excelsior Energy’s Mesaba Energy Project
Excelsior Energy’s Mesaba Energy Project
Zahrani & Selaata IPP Projects
SunZia Project Description
NERC LTRA Workshop August 16, 2007
Excelsior Energy’s Mesaba Energy Project
Strategic Plan and Economic Upgrade Process
Nogales DC Tie Capacity
Presentation transcript:

BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates, PLC

Santa Cruz Ten-Year Transmission Plan January 31, 2008 filing included: ◦ Projects in others’ ten-year plans:  Hassayampa – Pinal West 500 kV (SRP plan)  Pinal West – Pinal Central 500 kV (SRP plan)  Western Parker-Davis (“P-D”) Project 115 kV Upgrades to 230 kV (Western plan) ◦ Projects in SPPR Group’s Three Terminal Plan (TTP):  Santa Rosa/Test Track – ED5 (new substation) 230 kV (TTP)  ED5 – Pinal Central 230 kV (TTP)  ED5 – Marana 230 kV (TTP) 10/26/2015K.R. Saline & Assoicates, PLC

Santa Cruz Ten-Year Transmission Plan (cont.) January 31, 2008 filing also included potential SPPR generation site transmission interconnection facilities: ◦ The “Randolph” site  Pinal Central – Randolph 230 kV Ckt. 1 (SPPR)  Pinal Central – Randolph 230 kV Ckt. 2 (SPPR) ◦ Other potential sites in close proximity to SPPR TTP  Minimal transmission requirements to interconnect with TTP 10/26/2015K.R. Saline & Assoicates, PLC

The Three Terminal Plan (TTP) - Need The Three Terminal Plan is needed to deliver power from SPPR Project No. 1 ( an approx. 620 MW 2-on-1 combined cycle gas-fired generating plant) to a diverse group of Participants who are widely spread across Pinal County and other locations in Arizona. SPPR Project No. 1 is not expected to fully satisfy the members’ incremental load requirements by the time it becomes commercially available in /26/2015K.R. Saline & Assoicates, PLC

The Three Terminal Plan - Studies To date, extensive resource planning studies have been conducted, including several purchased power solicitations. A comprehensive siting study has been completed including site-specific evaluations of transmission feasibility. For three short-listed sites (areas), detailed power flow analysis have been preformed. ◦ For two of the potential sites preliminary short circuit and stability analyses (for two sites only) have been preformed. Results of all studies remain confidential, pending final site selection. SPPR Group members who are also participants in the SEV Project have requested that SRP perform a “cluster study” of new generation in the general proximity of Pinal Central and their transmission plans (including the TTP). 10/26/2015K.R. Saline & Assoicates, PLC

The Three Terminal Plan - Map

The Three Terminal Plan - Description Santa Rosa/Test Track – ED5 (new substation) 230 kV (TTP)  From Santa Rosa to Thornton Road, a second circuit will be added on the SEV 500 kV line at 230 kV.  From Thornton Road to ED5, a portion of Western’s Casa Grande to Empire to Saguaro 115 kV line will be converted to a double circuit 230 kV line. Western’s circuit will continue to operate at 115 kV. ED5 – Pinal Central 230 kV (TTP)  Western’s ED5 to ED4 to ED2 115 kV line will be converted to a double circuit 230 kV line. Western’s circuit will continue to operate at 115 kV. ED5 – Marana 230 kV (TTP) ◦ The remaining portion of Western’s 115 kV line from Empire to Saguaro and its 115 kV line from Saguaro to Marana Tap will be converted to a double circuit 230 kV line. Western’s circuit will continue to operate at 115 kV. 10/26/2015K.R. Saline & Assoicates, PLC

Santa Cruz Ten-Year Plan To date stakeholder input has been limited to the SPPR members and SEV participants. ◦ Presentations have been made to the CATS HV and SATS study groups. Santa Cruz has yet to initiate any construction activities related to the TTP transmission facilities or the interconnection facilities. 10/26/2015K.R. Saline & Assoicates, PLC