Ash Roorbach CMER Riparian Ecologist CMER Monthly Meeting, July 27, 2010.

Slides:



Advertisements
Similar presentations
What are Ecosystem Services? Goods and life supporting services provided by natural ecosystem. Goods timber fisheries pharmaceuticals Services pollination.
Advertisements

Griffith Park Fire Draft Recovery Plan May 30, 2007 Mayor Antonio R. Villaraigosa Councilman Tom LaBonge, CD 4 General Manager Jon Kirk Mukri City of Los.
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
Spruce Beetle Epidemic & Aspen Decline Management Response EIS Adaptive Implementation Process.
BoRit Superfund Site Timeline
Sponsored by the Cooperative Monitoring, Evaluation, and Research Committee (CMER) of the Timber, Fish, and Wildlife (TFW) Agreement Forested Wetlands.
Lecture 7 Forestry 3218 Forest Mensuration II Lecture 7 Forest Inventories Avery and Burkhart Chapter 9.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Development of a Comprehensive Wildlife Conservation Strategy for Georgia Georgia Department of Natural Resources Wildlife Resources Division.
USAID Africa Bureau EIA Procedures for Sub-Projects
Sponsored by the Cooperative Monitoring, Evaluation, and Research Committee (CMER) of the Timber, Fish, and Wildlife (TFW) Agreement Forested Wetlands.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Casmalia Wetland Mitigation Group Project Emily Bosanquet  Todd Cooper Ann Hayden  Vicky Krikelas  Michelle Torrent Faculty Advisors: Professor Trish.
ESRM 450 Wildlife Ecology and Conservation FOREST PATTERN Managing Stands, Landscapes, and Habitat.
The Water Withdrawal Assessment Process Context within regional water policy discussions Context within regional water policy discussions –Aquatic ecosystems.
National Forest Certification October 7, Why Consider NFS Certification? Force for change – To-date certification has had positive impacts on state,
What is a database? An organized collection of data. This can be in an electronic, paper, or other format. Types of databases Operational -constantly changing.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
CMER Research Update George McFadden CMER Study Implementation Coordinator.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
© All rights reserved. Front Range Roundtable Project Outline: Wildlife Working Team 1 Rick & Lynne to edit by may meeting Team Scope Roundtable.
Hardwood Conversion Studies What do we know from studies, monitoring, and Forest Practices Applications? Miller and McConnell.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Interim Headwater Drainage Feature Guideline: Protecting HDFs through Urbanization Laura C.R. Del Giudice, B.Sc., M.F.C., Senior Planning Ecologist.
The WLP must be consistent with these objectives 1.maintaining or enhancing an economically valuable supply of commercial timber from the woodlot licence.
Select High Quality Natural Communities MLCCS Slope & Aspect Restoration Prioritization and Prediction Model (RePP) SUMMARY: In 2008, Ecological Strategies.
Public Dialogue on National Forest System Certification October 16, 2008 Washington, D.C. Robert J. Hrubes, Ph.D.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
Wildlife Program Amendments CBFWA Members Meeting – Sept
Lower Snake River Comp Plan M & E Program SPY’s thoughts based on 3 weeks.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
Breeding Bird Response to Riparian Buffer Width 10 years post-harvest Scott Pearson Washington Department of Fish & Wildlife Jack Giovanini, Jay Jones,
Sustaining Michigan’s Wetlands: Mitigation, Conservation Easements, and No Net Loss Andrew T. Kozich MTU School of Forest Resources & Environmental Science.
ODFW Habitat Mitigation Policy and Energy Facility Siting.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
Development of Fish and Wildlife Program Amendments.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
Ecological Sites on Rangeland
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project No Jason McLellan Confederated Tribes of the Colville Reservation January.
PRIME WETLAND STUDY OF FITZWILLIAM – INITIAL FINDINGS Dr. Rick Van de Poll Ecosystem Management Consultants Sandwich NH.
Impact Analysis. Impact Analysis (204) ODOT attempts to avoid, and minimize impacts to the natural environment throughout the PDP process Despite these.
Steve Todd WetSAG co-chair Suquamish Tribe Ash Roorbach CMER Riparian Ecologist August 5, 2010.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
Regional Peer Learning Workshop: Accelerated Landscape Restoration Siuslaw Stewardship Model and Collaborative Engagement.
OPEN SPACE/ CONSERVATION
Environmental Critical Areas Regulations
FIRES IN RIPARIAN AREAS AND WETLANDS
Washington County Parks and Open Spaces
Of wetland mitigation sites constructed in the U.P.
Wildlife Program Amendments CBFWA Members Meeting – Sept
Joint Army-EPA Mitigation Rule
What is a Shoreline Master Plan?
Environmental Regulations:
UK Technical Advisory Group
Agricultural Order 4.0 Discussion
Presentation transcript:

Ash Roorbach CMER Riparian Ecologist CMER Monthly Meeting, July 27, 2010

Determine whether the current Washington State forest practice goal of no net loss of wetland function is being achieved by using a mitigation sequence during road construction and maintenance activities. Mitigation Sequence: 1. Avoid 2. Minimize 3. Restore 4. Reduce 5. Replace

Wetland Area ≠ Wetland Function “…Wetland areas serve several significant functions in addition to timber production: Providing fish and wildlife habitat, protecting water quality, moderating and preserving water quantity. Wetlands may also contain unique or rare ecological systems.” (WAC Policy)

1. How are forest road construction and maintenance activities affecting wetland functions? 2. How are forest road construction and maintenance activities affecting wetland areas and structures?

Wetland Mitigation Program Preliminary questions: 1. What kinds or types of wetlands? 2. What size wetlands? 3. What kind of road interactions? 4. How is the road or maintenance activity affecting wetland area and structure? 5. Is the road or maintenance activity potentially affecting wetland functions?

1. “Characterization of Forest Roads and Wetland Interactions Study” (RWI Study) Describe and quantify how roads interact with wetlands.  Statewide survey  Extrapolate potential risks to wetland functions 2. Function Study (Effectiveness Study) – Focus on quantifying changes to wetland functions from forest road construction and maintenance.  Use results from the RWI Study  Not yet scoped or designed

Cannot find similar study in literature Design Options: 1. Paired treatment – reference Too much natural variability between wetlands 2. Before – after Limited time frame 3. Retrospective No baseline data to compare ‘treatment’ effects against

Retrospective study design  Characterize and ‘rate’ qualifying wetlands (i.e. within 200’ feet of road)  Describe associated road attributes and characteristics  Quantify physical relationship between road(s) and wetland(s) (distance, slope, vegetation, drainage, etc.)

Indicators Road in wetland Dead standing vegetation Drift lines in wetland Impoundment Sediment observed in wetland Compacted and rutted soil in and around wetland Invasive species present in and around wetland Slash/debris left in wetland Other? Best professional judgment (when necessary)  Is the presence of the indicator a result of road construction or maintenance?  Does the indicator represent a potential change to function x?

Pilot Study (DNR Olympic Region)  Data collection methods  Analytical procedures  Site selection methods (including map accuracy)  Sample size  Costs  Useable data Policy action to date: Approved $150,000 fy 2011 Budgeted $157,000 fy 2012

1. CMER review and discussion of pilot study results. 2. Plan and implement statewide ‘Roads and Wetlands Interaction’ study. 3. Scope and design Function Study to directly investigate road effects on wetland functions.  Prioritized wetland functions  Before/after design? Controlled treatment?

 Pilot Study Plan reviewed by WetSAG  Pilot Study Plan in CMER review (seen 2 drafts) Discussion at May 2010 CMER meeting: 1. Finish addressing CMER comments on 2nd draft of Pilot Study Plan. 2. Bring Pilot Study Plan to CMER for (provisional) approval. 3. Develop/refine data collection methods (and analytical procedures) at sites. 4. Revise/update Pilot Study Plan based on methods development work. 5. Final CMER review/approval. Send Pilot Study Plan to ISPR. 6. Implement Pilot Study at sites in the DNR Olympic Region.

CMER recommendation: 1. Start search for Wetland Specialist and ID other experts. 2. Field trip (and methods test) with Tom Hruby and CMER members. 3. Hire Wetland Specialist to review Pilot Study Plan and lead methods development work at 8 sites and refinement of study plan. 4. Consult with Tom Hruby (lead DOE wetland scientist). 5. Develop analytical methods 6. Refine/update Pilot Study Plan. CMER review. 7. Send Pilot Study Plan to open-review ISPR. Final CMER approval. 8. Implement Pilot Study Plan.

Study plan Finish now or set aside? Wetland specialist Hire before or after ISPR?