By: Carroll Wongchote & Jonathan Russo 2/18/2011 ITEC 451.

Slides:



Advertisements
Similar presentations
INDONESIA INTERNET EXCHANGE an update Presented by APJII-ID Teddy A. Purwadi - Executive Council Faizal Adiputra - Secretary of.
Advertisements

2014 IMPROVEMENTS St. Thecla Computer System Upgrade.
ITT NETWORK SOLUTIONS. Quick Network Facts Constant 100 Mbps operation for users Infrastructure ready for 1000 Mbps operation to the user Cisco routing.
Company Equipment Upgrade Proposal. The Current Situation  It has been five years since Alt-F4 Inc. has upgraded any of it’s equipment.  200 Computers.
CreateProduct A web-based solution for maintenance of products, structures, memo and images in Visma Business or Visma Global. Perfect for retrieval of.
Team 1.  Throughout the presentation keep in mind that these are the factors that we used to make our decisions in the following order. ◦ Security ◦
WAN Connectivity The VMO Wide Area Network will extend between all stores, offices, and Lyon, France We have designed a highly redundant network with.
1. 2 Welcome to HP-CAST-NTIG at NSC 1–2 April 2008.
Wireless LAN Security Shala VanGerpen December 8 th, 2005.
WICHITA AND OHIO LOCATION Network Design. Star Bus Topology.
Project Cysera Hardware Configuration Drafted by Zoebir Bong.
Properties Change theme Properties Change theme Windows (standard) Windows start.
IPTV Internet Protocol Television Chris Hall. Two Major Providers Of IPTV.
Windows Server 2003 Servers 7/14/15 Workloads. Servers Workloads 7/14/15 Secure Downtime Costs Windows Server 2003.
ITEC 451 Project 2 Charisse, Chris, Eileen. Build Small Office Network Three Servers Firewall Device Switch & Router 10 VPN Network Budget – $10,000 –
March 27, IndiaCMS Meeting, Delhi1 T2_IN_TIFR of all-of-us, for all-of-us, by some-of-us Tier-2 Status Report.
CPE5021 Advanced Network Security ---Network Security and Performance--- Lecture 9 CPE5021 Advanced Network Security ---Network Security and Performance---
E-Infrastructure for Science in Georgia Prof. Ramaz Kvatadze Georgian Research and Educational Networking Association – GRENA
Zak Lowman Shaquille Wilkins. $10,000 Budget Server  Hardware HP ProLiant ML 100 G6  Intel Xeon X3430 Processor (4 core, 2.40 GHz)  2GB DDR3 RAM 
1 KFUPM Enterprise Network Sadiq M. Sait
Use/User:LabServerField Engineer Electrical Engineer Software Engineer Mechanical Engineer Requirements: Small form factor.
Objective  CEO of a small company  Create a small office network  $10,000 and $20,000 Budget  Three servers (workstations)  Firewall device  Switch.
Ben Actis.  NECCDC  Layout  Prep  Actual game day.
Year 10 – Chapter 4 – Computer Networks Lesson 2: Setting up a Network Starter Task – Can you think of reasons to set up a network? Why Use Networks? 1.
Garrison Vaughan, Kyle Nester, Anthony Taliercio.
Network Setup Assignment Chris Moore, Kwan Tonpoobaln, Jon Light.
VANDER LAW FIRM “COMMITTED TO LEGAL EXCELLENCE AND CLIENT SATISFACTION”
COS 338 Day 24. DAY 22 Agenda Spring 2006 Book List Assignment 7 Corrected 2 B’s, 2 C’s, 1 D and 1 non-submit.
Billy Coss Alex Newton SMALL BUSINESS NETWORKING EQUIPMENT.
By: Jonathan Russo and Carroll Wongchote Date: 02/03/2011 ITEC 451.
Internet (THEnet ISP Gateway) Home PC Home Laptop Wireless AP/RouterVPN Concentrator Firewall Hub (running WireShark for Monitoring) Work Server Work PCs.
Program Outline Maximize discounts, 50% - 60% Final discount based on configuration and scope. Expires October 24 th 03’. Competitive equipment trade-in.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 5 Switches.
Summer 2012 A Brief Review of Technology Upgrades at Mead Hall Technology Committee Meeting.
Our Small Company Jamel Callands, Austin Chaet and Carson Gallimore.
Lincoln Nebraska & France Tai’s Part. Lincoln Nebraska Expansion 175 Computers 175 VOIP Phones T3 Point-to-Point to Data Center OC3 to the Internet 2.
ACME PLC Ishwar Gill Introduction For this coursework I was ask to build a network for ACME PLC. It had to be 3 floors. Ground floor, First floor.
MOBILE NET INC. Ideas for Today and Tomorrow. INTRODUCTION Survey Le Presamtos, Inc. Network Infrastructure Document Current Hardware & Software Upgrade.
IT Strategy NATIONAL INSTITUTE OF STATISTICS Dan Marcu – 2005 Dan Marcu – 2005.
By Brett Bailey General Contractor 5/26/13 BCMHS.
Cisco PIX Firewall Family
Nittany Nation Kevin Brummert & Johnna Weston. Penn State Clothing Store Located in Altoona, PA near the Penn State Altoona Campus Target students, fans.
Carroll Wongchote and Jonathan Russo ITEC 452 9/16/2011.
M M M M 5. Not Listed
NETWORKING COMPONENTS By Jessica Tolson LTEC 4550.
Industry Standard Servers Infrastructure Refresh Why?
Ismayilov Ali Institute of Physics of ANAS Creating a distributed computing grid of Azerbaijan for collaborative research NEC'2011.
Vlan 2501vlan 2502vlan 2503vlan 2504 r1 nosmo switch1 switch2 switch3.

HP Proliant Server  Intel Xeon E3-1220v3 (3.1GHz / 4-core / 8MB / 80W).  HP 4GB Dual Rank x8 PC E (DDR3-1600) Unbuffered Memory Kit.  HP Ethernet.
Image from
City of Hyattsville City Council IT Briefing October 19, 2015 dataprise.com | #ITinRealLife.
Network And Browser Support By 1Akal 1Akal – Technology Services for Home & Business.
By: Billy Geiger Jordan Howell Project 2. Contents 3 Servers Operating System Firewall Device Switch Server Rack UPS(Uninterruptible Power Supply)
Warehouse Scaled Computers
WELCOME.
Dell business plan FOR FREIXENET BY : TRIFON YORDANOV ORIOL TORTOSA
COS 338 Day 24.
40% More Performance per Server 40% Lower HW costs and maintenance
Year 11 – Chapter 4 – Computer Networks
Cisco Systems Case Study
Valid Until End of October 2017
PRICES ARE VALID UNTIL END OF FEBRUARY
مشروع رفع كفاءه شبكه معلومات جامعه الفيوم
Green Internet Reducing Energy Consumption by Global System Operation Scheduling Top of the line CISCO CRS-1 20 J/Gb (watt per Gb/s) 1)Decoding 2)Buffering.
Code names of the processors on Intel's roadmap
(Submitted by José Mauro de Rezende)
Footer.

Best Deals & Offers- FiOS Plans Call to +1(844) (USA)FiOS Plans.
Presentation transcript:

By: Carroll Wongchote & Jonathan Russo 2/18/2011 ITEC 451

 Verizon FiOS  150 Mbps / 35 Mbps  2 year contract for $199.99/month  Total Internet Costs: $ ($4799)

 Cisco Catalyst 2960  Total cost: 1, Image from Amazon.com

 SonicWALL NSA 24  Cost: $896.25

 SonicWALL Global VPN License  Need: licenses  Own: 50 licenses  Costs: $0.00

 HP ProLiant ML150 G6 Intel Xeon E5506  Cost: $1,649  Total Cost: $4,947 Image from Newegg.com

 Total Internet costs: $  Switch: $1,  Firewall: $  VPN Licenses: $0.00  Servers: $4,  Total Costs: $8,  Money Left Over: $1, – (taxes)

 Verizon FiOS  150 Mbps / 35 Mbps  2 year contract for $199.99/month  Total Internet Costs: $4799

 Cisco ESW P-K9  Total cost: $2, Image from tigerdirect.com

 SonicWALL CDP 210  Cost: $2,650

 SonicWALL Global VPN License 50  Costs: $505

 XEON Quad Core  Cost: $2,  Total Cost: $7, Image from tigerdirect.com

 Total Internet costs: $4,  Switch: $2,  Firewall: $2,  VPN Licenses: $  Servers: $ 7,   Total Costs: $17,705  Money Left Over: $2,295.00