E.C. Aschenauer RSC-Meeting, January 21st 2011 1 T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e.

Slides:



Advertisements
Similar presentations
EMC Status Report: November 2003 Roger Barlow Events since last report (25 th Sept.) –The ROD Current status –Electronics –Neutron Generator –Light Pulser.
Advertisements

Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
E.C. Aschenauer 2013/03/132 polarisation for Blue and Yellow t o -calibration underway minimal impact on polarization, makes A N more stable  should.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
AGS CNI Update: Non-linear Corrections to Energy Loss in Si Dead Layer Outline Standard dead layer fitting technique Non-linear corrections Compare results.
E.C. Aschenauer Phil Pile Meeting 2012/03/202 polarisation at injection Blue and Yellow Caveat: only first round of cleaning up noise in polarimeters.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
G D Calibration of the LIGO Interferometer Using the Recoil of Photons Justice Bruursema Mentor: Daniel Sigg.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Yousef Makdisi PSTP2011 September 12-18, 2011 Proton Polarimetry at the Relativistic Heavy Ion Collider and Future Upgrades Yousef I. Makdisi Brookhaven.
FLASH Toroid Review Progress since last meeting in April Next steps Summary Johnny Ng FLASH Coll. Mtg. 7/25/03.
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
1. introduction 2. goal of luminosity monitor 3. Structure of BESII Luminosity detector 4. Calculation of the luminosity 5. MC of luminosity detector 6.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
7/30/99Douglas E. Fields for the E950 Collaboration 1 A CNI Polarimeter for RHIC Spin Results from IUCF CE75 & AGS E950 M. Bai, G. Bunce*, H. Huang, Y.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
Beam diagnostics in the beamlines
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.
Relative Polarization Measurements of Proton Beams Using Thin Carbon Targets at RHIC Grant Webb Brookhaven National Laboratory Sept 14, 2015PSTP20151 for.
Polarization Measurement of 100GeV Proton Beams at RHIC with CNI pC Polarimeter Itaru Nakagawa (RIKEN/RBRC) On behalf of CNI Polarimeter Group I.G.Alekseev.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
Si-detector macroscopic damage parameters during irradiation from measurements of dark current evolution of with fluence Craig Buttar, University of Sheffield.
CS TC 22 CT Basics CT Principle Preprocessing. 2 CT Basics CT principle preprocessing CS TC 22 Blockdiagram image processor.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Trip-t testing progress report
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1B.Morozov CNI Meeting 31 July Possible Upgrades for CNI Carbon Polarimeter G. Atoian, R. Gill, B. Morozov.
Gain stability and the LYSO beam radiation monitor measurements
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
A Possible Path Forward Current Polarimeter Upgrades Efforts A Possible Path Forward Current Polarimeter Upgrades Efforts Based on a proposal by Boris.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
H-Jet polarimeter status report Yousef Makdisi RSC 07/28/06.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
Photo-detection EDIT EDIT 2011Single photon counting measurements with an HPD – T. GysSlide 1 Single photon counting measurements with a hybrid photon.
E.C. Aschenauer STAR Spin PWG 2012/03/222  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
versus Proton spin vector Double-spin helicity asymmetry: N ++ / L ++  N +  / L +  N ++ / L ++ + N +  / L +  1 P1P2P1P2P1P2P1P2 A LL  Single-spin.
Update on the CNI polarimeter results for Run02 1.Bunch-by-bunch polarization study 2.Profiles of 0-pol bunches Osamu Jinnouchi.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
Calibration Workshop 8 Sept Calorimeter Calibration: Calibration procedure and Database Definition Ursula Bassler, Mrinmoy Bhattacharjee, Leslie.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
RHIC Polarimetery A.Bazilevsky for RHIC Polarimetry group RHIC Spin Collaboration Metting April 10 (Friday), 2009.
Haixin Huang AGS Cold Snake: Status and Plans.
E.C. Aschenauer RSC - Meeting 2012/03/232  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
Rainer Stamen, Norman Gee
Calorimeter Status Electronics Installation and Commissioning
Why we need an improved LASER calibration system
HyCal Energy Calibration using dedicated Compton runs
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
T2K Run8 MUMON Summary.
VELA TDC: Bunch Length and Longitudinal Phasespace Measurements Update
Run5 Analysis of RHIC-pC Polarimeter
Presentation transcript:

E.C. Aschenauer RSC-Meeting, January 21st T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e f o u n d o n w i k i l e a k s

RHIC pC Setup Run11 E.C. Aschenauer RSC-Meeting, January 21st

Polarimeter Status  Work during access on Wednesday:  fixed problem with readout of yellow-1-downstream polarimeter  investigated problem with current monitoring of Y2U  spares of modules involved located  can hopefully fix the problem at the next access day E.C. Aschenauer RSC-Meeting, January 21st Hardware status okay  Change in operational procedure:  turn off Si bias voltage during beam studies, tune-up, APEX  keep radiation damage at a minimum 111 bunch injection studies

First Data from B1 & B2 Polarimeters E.C. Aschenauer RSC-Meeting, January 21st Blue-1 Upstream Blue-2 Downstream Raw Data: bananas clearly visible calibration ADC -> energy alpha calibrations need to correct for Si – dead layer

 -Calibration E.C. Aschenauer RSC-Meeting, January 21st Blue-1 Upstream Blue-2 Downstream factor 2 in position comes from the fact that downstream polarimeters don’t use shapers, which also amplify Remember  ’s penetrate factor 10 deeper into Si than carbons Plan for upcoming shutdown: install 2 nd source Gd with different  - energy install different foils to attenuate  – energy (tests in lab planned)

Blue-1 Upstream Blue-2 Downstream Blue-1 Upstream Blue-2 Downstream RSC-Meeting, January 21st Data after Corrections E.C. Aschenauer t0t0 Energy-Scale Current Puzzle: difference between t0 and energy scale correction factor energy-scale correction based on Si dead layer

Data after all Corrections E.C. Aschenauer RSC-Meeting, January 21st Blue-1 Upstream Blue-2 Downstream After all corrections both polarimeters look very similar A r e y o u r e a d y ? ? ? ? F a s t e n y o u r s e a t b e l t s t h e s e c r e t w i l l b e r e v e a l e d

Polarization at Injection for Blue Ring E.C. Aschenauer RSC-Meeting, January 21st : blue1 upstream P = 51 +/- 3 % (stat only) : blue2 downstream P = 49 +/- 3 % (stat only)

To Do  Update parameters in online polarization calculation to get reasonable numbers  Investigate the difference in energy-scale constant between B1 and B2  see we get the same result for Y1 and Y2 (just collected the data last night)  measure linearity of energy response of different systems  vary pulser amplitude  latest during the next access day  Need good data for Y1 and Y2 polarimeters to determine parameters for online, most likely the ones from last night will do.  Analyze the polarization at flat top for B2  Next access-day  fix bias voltage readout  bring hopefully one detector back to live in Y2U by changing pre-amp box E.C. Aschenauer RSC-Meeting, January 21st