Bing Kong Tong Building at the completion of Phase 1 Grants provided by CCHE and SHRA.

Slides:



Advertisements
Similar presentations
The Unit Owners Association of the Madison, A Condominium Building Revitalization (Work Completed & Upcoming Work)
Advertisements

Readyville Mill Restoring the Readyville Mill. March 2006 Forgotten and Neglected for 40 years.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Giving Your Models a Stucco Exterior Kevin Looff March 7, 2009.
Early Homes – Native Americans – 17 th Century Mrs. Wagner Fashion & Interior Design.
The Lorena Stove Saving the World One Person at a Time.
Assignment 3 Unit 21Kyle Barrass Presentation of a Construction Project.
Changes to the 2011 Landscape Projects Grand Haven.
Theatre Terminology Apron
 First and possibly the more difficult of the two to deal with is the situations concerning existing illegal carports.  Secondly, we must address what.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
THIS IS WITH Carlin Bright Purpose Types of Foundations WallsMiscellaneousPast Units
The Lorena Stove Saving the World One Person at a Time.
Sylvan Theater Column Restoration Project
Carl the construction worker has a problem. Carl needs to build a house for a family moving into the neighborhood. Carl’s boss gave him lots of tools.
WHITE HOUSE WHITE HOUSE is the official name of the executive mansion of the President of the United States. It is on the south side of Pennsylvania.
The Ariel Assembly Instruction By Laser Dollhouse Designs.
How to update your kitchen for under $1,000. This is the before picture Here were some of the issues: –Kitchen has 30+ year old cabinets. The white dishwasher.
Lesson Siding Agricultural Structures Interest Approach What types of buildings siding have you seen on the farm? What are some of their advantages?
Chapter 8: House Construction
Objective 6.01 Nineteenth Century Housing
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Shearer’s Bridge. Bridge Construction  Shearer's Bridge was originally built in 1847 over Chiques Creek at a cost of about $600. The bridge was.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
UNDER OFFER - An opportunity to purchase some easily accessible grazing land which is well fenced and provides excellent equestrian or amenity potential.
Building A Parade Float 101. Theme: “Ranger Heroes: Legends of Northwestern”
Introduction of the Building Sector in DPR Korea 9 th March, 2008.
Saltbox Homes. Cultural Background Found in New England “Saltbox Shape” originated in 17 th century, used commonly through early 19 th century Still seen.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Learning Activity 2: Design Exercise: WORKSHOP GENT LIFELONG LIVING, HOUSING AND SUSTAINABILITY GROUP 11: KATARINA SIMONCICOVA IPEK KOSOVA MAŁGORZATA SZTUKA.
20 th Century Housing Mrs. Wagner Fashion & Interior Design.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
The Roman Arch. AQUEDUCT TRIUMPHAL ARCH VILLA TEMPLE.
Ryan starting on the South end.. We’ll use the garage as a workshop.
UNIT 31 Structural Wall Sheathing. Sheathing Inner layer of the outside wall Not part of the wall framing Structural part of the home Insulated sheathing.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Drawing an Invention Plan
Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Construction on the Bing Kong Tong Building For CCHE Quarterly Report 1/1/2014 – 3/31/2014.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
1 Item W9a (Ruffalo) Coastal Commission March 7-9, 2012 Hearing.
WINDOWS DOORS FACADE STAIRS. The samples of our products.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Set Construction Essential Question:
Grafton Public Schools. Extraordinary Expenses Additional Classrooms Additional/ Replacement Furniture Added Security Devices Replace Rotted Grease Trap.
Illustrated Summary of Design Guidelines City of Ames, Iowa.
Drafting 2 (Arch) Quiz Review #5
ARCH 5325 Conservation Policies Documentation and Designation of Properties (Chapter 5)
_________-The part of the stage floor extending beyond the proscenium arch into the house Theatre Terminology Apron.
WEDNESDAY, JUNE 24, 2015 Cobourg Heritage Awards Proposed Recipients.
MONICA FRANCO. REI FLOOR PLAN Since the space was very huge, it was impossible for me to actually plan the interior space of it. Therefore I decided to.
Old world craftsmanship... timeless beauty.
Major Steps In Building a SFR
Objective 6.01 Nineteenth Century Housing
Boxford Primary School
Stained Glass Window Restoration Project
Louisiana Architectural Styles
Building Structural Systems
Saving the World One Person at a Time
THE RIPPLE EFFECT PROGRAM
1 Semester Project Design A Multi Story Office Building
Character Cards Use sheets of card or paper to create ―collector cards about the main characters in your story. On the back (the side with lines), write.
WESLEYAN P-32-2 MAINTAIN JUT OUT AND PAINT TO MATCH SIDING
ERASMUS+ The house i chose is located at the heart of the city, at Ogl and Kontaratou street. Before its demolition it used to be one of the few neoclassic.
Humanities Matching Final
OBEDIENCE SIN SIN Plinko-Type Board GOD’S WILL
Humanities Matching Final
This is my personal job for an Erasmus + project.
Saving the World One Person at a Time
Presentation transcript:

Bing Kong Tong Building at the completion of Phase 1 Grants provided by CCHE and SHRA

The Final Weeks of Phase 1-Stabilization Construction After removing all the old siding, shiplap and tin, new plywood was added for shear and new tin sheeting with the brick pattern was applied over it.

The façade was restored by replacing the 2 nd story balcony and extending the supports down through the sidewalk as they had been in the past.

Window frames were reconstructed in the original pattern and will be painted to match the original colors. The building has been reroofed and the front parapet wall rebuilt to replace badly dry rotted wood.

The building has been painted white, its original color. New wooden arches frame each of the front doorways.

The Bing Kong Tong Building Grand reopening in 1932 after burning to the ground in 1926 Completion Phase 1 reconstruction in 2014 after 50 years of neglect