07.10.2009, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: System Integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Supported by GSI, BMBF (06FY9099I), EU (FP7-WP26) A Prototype Readout System for the MVD of the CBM Experiment Christoph Schrader for the CBM-MVD Collaboration.
„Prototyping the CBM Micro Vertex Detector” Group report Michal Koziel Goethe-Univiersität, Frankfurt for the CBM-MVD collaboration 1.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Third International Conference on Frontier Science Villa Mondragone – Monteporzio Catone Physics and Astrophysics in Space June 14, 2004 Mercedes Paniccia.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Status of the Prototype of the CBM Micro Vertex Detector M. Deveaux, Goethe University Frankfurt for the CBM-MVD collaboration.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
The CBM-MVD prototype: Realization & beam test Michal Koziel Goethe-Universität, Frankfurt 1 Detector Workshop March 25th-26th 2013 at.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Wojciech Dulinski Mimosa-18 (High Resolution Tracker) IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France Mini.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
TRBnet for the CBM MVD-Prototype Borislav Milanović In cooperation with: J. Michel, M. Deveaux, S. Seddiki, M. Traxler, S. Youcef, C. Schrader, I. Fröhlich,
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
1 Read out & data analysis of the MVD demonstrator S. Amar-Youcef, M. Deveaux, I. Fröhlich, J. Michel, C. Müntz, C. Schrader, S. Seddiki, T. Tischler,
Institute for Nuclear Physics, University of Frankfurt 1 A concept for the MVD-DAQ C.Schrader, S. Amar-Youcef, N. Bialas, M. Deveaux, I.Fröhlich, J. Michel,
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Y. Ikegami, T. Kohriki, S. Terada Y. Unno (KEK), K. Hara (Univ. of Tsukuba) G. Barbier, F. Cadoux, A. Clark, D. Ferrere, S. Gonzalez-Sevilla, D. La Marra,
Recent developments on Monolithic Active Pixel Sensors (MAPS) for charged particle tracking. Outline The MAPS sensor (reminder) MIMOSA-22, a fast MAPS-sensor.
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Test of the MAPS add-on board S. Amar-Youcef, M. Deveaux, D. Doering, C. Müntz, S. Seddiki, P. Scharrer, Ch. Schrader, J. Stroth, T. Tischler.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Integration of the MVD Demonstrator S. Amar-Youcef, A. Büdenbender, M. Deveaux, D. Doering, J. Heuser, I. Fröhlich, J. Michel, C. Müntz, C. Schrader, S.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Elena Rocco Nikhef, The Netherlands On behalf of the ALICE Utrecht-Nikhef group Jamboree – Utrecht December 2012.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Multiple Scattering and Sensor Thickness Preserving track extrapolation accuracy to bulk of particles at low momentum requires ultra-thin sensors and mechanical.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Detector building Notes of our discussion
FCAL R&D towards a prototype of very compact calorimeter
Micro Vertex Detector of PANDA Strip Detector
Performance of an Automated Water Based Cooling System for CBM MuCh
LumiCal mechanical design, integration with LDC and laser alignment
Silicon Lab Bonn Physikalisches Institut Universität Bonn
SIT AND FTD DESIGN FOR ILD
Test Beam Measurements october – november, 2016
Presentation transcript:

, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: System Integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering, J. Heuser, I. Fröhlich, J. Michel, C. Müntz, C.Schrader, S. Seddiki, J. Stroth, C. Trageser and B. Wiedemann

, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: Mechanics & Integration Outline:  MVD Demonstrator  Design  Material overview  Mechanical support  Bonding and DemoAux-Board  Demonstrator in the Lab  Demonstrator for the Beam test  Summary and Outlook Demonstrator Prototype Final MVD

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: Design 2x MIMOSA-20 Sensors ZIF connector Flex-rigid R/O Demo-Aux board Liquid cooled Cu heat sink TPG/RVC/TPG sandwich Flexprint Cable

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: Material overview MIMOSA x 640 pixels - 30 µm pixel pitch µm thickness - ~ 2 ms time resolution - ~ 2 cm² active surface - 2 serial analogue outputs - Differential output lines FlexPrint Cable - 36 µm copper in 3 layers - minimized set of lines for 2 MIMOSA-20 - individiual readout for two sensors with one cable - 60 pads for chip bonding % X 0

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: Mechanical support – setting up Structure of the support: TPG (Thermal Pyrolytic Graphite) ultra high heat conduction ( 1500 W/mK in two dimensions = 4x value of copper ) RVC (Reticulated Vitreous Carbon foam) ultra light and stiff material Thickness [μm] 1xSplicing tape glue 35 ± 5 2xTPG (C)‏ 500 ± 10 2xLiquid glue 100 ± 20 1xRVC (C foam)‏ 3000 ± 100 Sum 4235 ± 102 2x Currently 0.6 % X 0 plus sensors TPG RVC Glue Currently : schematic view: Glue: 2-component Araldite 2011 Huntsman

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: Mechanical support – setting up Glueing TPG to RVC, TPG-RVC to TPG. Accurate knowledge of the thickness and surface is needed. Several thickness measurements were accomplished. Measurements were used to select good samples for the support needed.

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: Mechanical support – setting up Comparisons between TPG-RVC-TPG plate surface before and after cutting out the “stripe” were done. Cutting does not trigger relevant effects on the surface in terms of damage or bending. Cutted “stripes” ready for bending and cooling tests as well as for integration into experimental setup. before cutting after cutting Area without chips fittet radius mm

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: Mechanical support – bending schematic view: No load ??? g / kg Load range 10 – 100 gramms Bending tests with the support (Sandwich) and 1mm TPG (for comparison) were arranged to gain knowledge on the maximum load which can be handled by the support without lasting damages. In addition a value for the Young Modulus was calculated based on measured data. TPG gauge

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: Mechanical support – bending manufacture specification for TPG Fit pol0 => 550Fit pol0 => 61233

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: Mechanical support – vibration With the measured effective Youngs Modulus it is possible to calculate the vibration modes of the Sandwich. The knowledge of the vibration modes of the support is important to be sure that vibration modes due to the vacuum pumps will have no effect on our Support ( microphony). The first five modes are Mode k Frequency [kHz] To be compared with vacuum pumps and liquid cooling

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: Bonding and DemoAux-Board Chips were bonded to the FPC and connected to the DemoAux-Board for testing the whole readout chain. Data transfer to PC for storage and analysis Bonding support MIMOSA20 sensors FPC

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: in the Lab Demonstrator in Lab ( in PVC-Box ) for first series of test mesurements. Allows  readout of maximal 2 MIMOSA20 senors through FPC and DemoAux-Board  readout with a Fe55 source  readout with a running cooling system  search for the best calibration of the MIMOSA20 sensors  tests related to the heat conductivity of the whole Demonstrator  temperature monitoring DemoAux FPC sensors Sandwich cooling schematic view:

, T. Tischler, CBM Collaboration Meeting, Split sensors glue TPG copper RVC Cooling system - 40 °C - 20 °C glue MVD Demonstrator: in the Lab Cooling transport through the Demonstrator - 10,3 °Cwith running sensors - 12,6 °Cwithout running sensors Measured temperatures within the PVC-Box show no big differences on the TPG with and without running sensors. Nevertheless temperature transport between cooling system and the copper support as well as between the TPG and the copper support has to be improved further. All measurements in the PVC-Box were taken under normal pressure.

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: for the beam test Beam CERN, 120 GeV Pions, together IPHC Strasbourg from November the 5 th till the 13 th. Using their beam telescope TAPI, which is equipped with 2 Scintillators, one left, one right, for trigger 4 MIMOSA18 planes, two left, two right, for reference measurements variable keep in volume ( 75 to 105 mm ) in the middle for the DUT. Intention for the beam test is testing the full Demonstrator including mechanics, electronics and analysis with a moveable structure in plane orthogonal to the beam axis, which is electrically isolated and operates under normal pressure.

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: for the beam test Two mechanical setups are constructed, one with single sided readout for two MIMOSA20 sensors one with double sided readout for four MIMOSA20 sensors Assembled are two Aluminium frames for holding and cooling the Demonstrator. In addtion two cases are build to minimize condensation and to open the possibility of N 2 -flow. Autodesk Inventor 10 Double sided Single sided

, T. Tischler, CBM Collaboration Meeting, Split MVD Demonstrator: for the beam test From the CAD-model to a real support structure for the beam test:

, T. Tischler, CBM Collaboration Meeting, Split Summary and Outlook Summary: Global design of the MVD Demonstrator adapted for the test in the Lab. Mechanical support was build and tested focused on material characterisation and quality checks. Tests in the Lab under controlled environment show promising results e.g. in respect to noise. Global design was changed due to given constrains for the beam test. For the upcoming beam test an one sided and a double sided version were constructed and build. Outlook: This phase: building the MVD Demonstrator will be concluded with a hopefully successful beam test. ( Demonstrator++ versions under debate with improved support (CVD), different sensors, optimized FPC )