Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.

Slides:



Advertisements
Similar presentations
J. Branlard ALCPG11 – March 2011 – Eugene OR, USA Results from 9mA studies on achieving flat gradients with beam loading P K |Q L studies at FLASH.
Advertisements

Lorentz force detuning measurements on the CEA cavity
Ray Larsen Chris Adolphsen Chris Nantista ARD Division SLAC National Accelerator Lab ILC GDE Meeting Beijing March
Homework of HLRF 1 Shigeki Fukuda KEK 2012/4/23 HLRF Homework1 in KILC12 (Fukuda) 1.
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Christopher Nantista ILC 2 nd Baseline Assessment Workshop (BAW-2) SLAC January 18, …… …… …… … ….
SLAC ILC High Level RF Ray Larsen LLRF Workshop, FNAL, January 17, 2005 Rev. 1.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
Chris Adolphsen 10/03/09 MLI and HLRF Summary. Vladimir Kashikhin.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Klystron Cluster RF Distribution Scheme Chris Adolphsen Chris Nantista SLAC.
1 FNAL SCRF meeting 31/10/2015 Comments from LLRF Shin Michizono (KEK) Brian Chase (FNAL) Stefan Simrock (DESY) LLRF performance under large dead time.
Vladimir Kashikhin. FLASH Cavity Gradient Stability Comparison of beam-off measurements of pulse-to-pulse cavity gradient jitter during the flattop.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Chair’s report (John) Editor status reports (editors) Special section on XFEL (Nick) AOB (all) 1 TEB Meeting 15 June 2012 Global Design Effort John Carwardine.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
KSC Operation Control of Cavity Gradients Failure Analysis Near and Long Term R&D Effect on Beam Emittance Chris Adolphsen SLAC 9/7/2010 Going Native in.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
1 Simulation for power overhead and cavity field estimation Shin Michizono (KEK) Performance (rf power and max. cavity MV/m 24 cav. operation.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Plan for SCRF BTR January , 2012 Akira Yamamoto, Marc Ross, and Nick Walker (PMs) Jim Kerby, and Tetsuo Shidara (SCRF-APMs) Presented and discussed.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
John Carwardine (Argonne) First Baseline Allocation Workshop at KEK September 2010 Experience from FLASH ‘9mA’ experiments Gradient and RF Power Overhead.
1 S1Global Experiment Writeup Outlining WIP A N.Toge +
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
1 LLRF requirements/issues for DRFS Shin MICHIZONO (KEK) BAW1 (Sep.8, 2010)
Summary of Relative RF Distribution Costs with Gradient Considerations (Work in Progress) Chris Adolphsen SLAC.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
RF control and beam acceleration under XFEL conditions Studies of XFEL-type Beam Acceleration at FLASH Julien Branlard, Valeri Ayvazyan, Wojciech Cichalewski,
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
John Carwardine TDR Writing: FLASH 9mA Experiment.
3.1 Main linac layout and parameters 3 SCRF Main Linacs50Yamomoto 31 Main linac layout and parameters5Adolphsen 31.1 Main Linac layout for flat site 31.2.
Longitudinal dynamic analysis for the 3-8 GeV pulsed LINAC G. Cancelo, B. Chase, Nikolay Solyak, Yury Eidelman, Sergei Nagaitsev, Julien Branlard.
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
dependence on QL can not longer be seen
LLRF systems status update
Second SPL Collaboration Meeting, Vancouver May 2009
Outlook of future studies to reach maximum gradient and current
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
LLRF Functionality Stefan Simrock How to edit the title slide
LLRF Comments on the RF cluster and Distributed RF schemes
ILC Cryogenics -- Technical Design Report Planning
ILC - Global Design Effort
ERL Director’s Review Main Linac
Presentation transcript:

Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012

Carwardine: 9mA meeting, 22 May 2012 LLRF system layout per the RDR

LLRF for TDR: KCS vs DKS DKS –Essentially the RDR layout revised for Low Power config –RDR: RF Unit had one klystron feeding 3 CMs (26 cavities) –TDR: still uses groups of 3 CMs, but for Low Power config, each klystron feeds 1½ groups of 3 CMs (39 cavities) –Vector Sum control of 39 cavities, remote adjustment of Pk, QL, and phase for each cavity, mechanical tuners, piezo tuners, KCS –Each group of 3 CMs is fed from a coaxial tap-off from a single 300MW rf feed –Low Power config removes klystrons from each cluster but doesn’t change the Local PDS –Length of KCS section in ML: 26 groups of 3 CMs = 1.25km –Vector Sum control of 26 groups of 3 CMs (676 cavities) –Long loop delays due to transit times Carwardine: 9mA meeting, 22 May 2012

A. Yamomoto Carwardine: 9mA meeting, 22 May 2012

TDR Local Power Distribution System for ‘Low Power’ configuration (Showing half of an RF-Unit for KCS) Motorized variable hybrids Motorized phase shifters (one per cavity) Motorized double U-bend power tap-offs RF in 5MW load KCS (RF source: one CTO per 3 cryomodules) (Still uses 3 CM group as in RDR) ½ RF-unit for KCS (shown above) comprises: Cryomodules: 1 + ½ = 1 ½ Cavities: = 13 Motorized double U-bends (2 per CM): 3 Motorized variable hybrids: = 10 Motorized phase shifters: = 13 Motorized input couplers: = 13 Total knobs for each ½ RF Unit for KCS = 39 DKS (RF source: 2 klystrons per 3 groups of 3 cryomodules) (RDR configuration but with every third klystrons removed) ½ RF-unit for DKS comprises: Cryomodules: 1+ ½ + ½ ½ = 4 ½ Cavities: = 39 Motorized double U-bends (2 per CM): 9 Motorized variable hybrids: = 30 Motorized phase shifters: = 39 Motorized input couplers: = 39 Total knobs for each ½ RF Unit for DKS = 117 S. Fukuda / C. Nantista Carwardine: 9mA meeting, 22 May 2012

New TDR Baseline Local Power Distribution System Variable hybrids Variable phase shifters Variable double U-bend power tap-offs RF power S. Fukuda / C. Nantista Carwardine: 9mA meeting, 22 May 2012

KCS – global view Carwardine: 9mA meeting, 22 May 2012 Cluster LLRF controller

Carwardine: 9mA meeting, 22 May 2012 Difference between KCS and DKS is the power delivery method Local processing equipment KCS LLRF concept – local at RF unit (local equipment, functionality is identical to RDR-like

Technical Design Report outline Part II: The ILC Baseline Reference Page counts Author 1 Introduction and overview5 2 General parameters and layout15 3 SCRF Linac Technology39 Main linac top-level parameters and general layout 2Adolphsen Cavity performance and production specifications 10Yamamoto Cavity integration (couplers, tuners etc.) 10Hayano Cryomodule design including quadrupole and cryogenic systems 10Perini RF power source 3Fukuda Low-level RF control concept 2Carwardine/Michizono Cavity and cryomodule testing 2Hayano 4 Main linac layout for a flat topography7 Layout 2Adolphsen Klystron cluster scheme RF power distribution system 4Nantista? LLRF control for Klystron Cluster Scheme 1Carwardine/Michizono 5 Main linac layout for a mountain topography7 Layout 2Adolphsen? Distributed Klystron scheme power distribution system 4Fukuda LLRF control for Distributed Klystron Scheme (‘RDR-like’) 1Carwardine/Michizono Carwardine: 9mA meeting, 22 May 2012

Scope of LLRF sections In Main Linac Technology (2 pages) –LLRF system hardware functional description (1 page + diagram) –LLRF system applications / functionality (1 page + diagram) In ML for flat topography (1 page) –LLRF system layout diagram –Achieved LLRF performance In ML for mountain topography (1 page) –LLRF system layout diagram –LLRF performance limitations due to large VS and long transport delays –Global control at cluster level vs fast local processing at the CM Only 4 pages allocated in total, so will need to be able to cite other papers, documents, etc for details –What do we have that can be referenced? Carwardine: 9mA meeting, 22 May 2012

List of functions / applications (from Julien Branlard) Global (klystron-level applications) –MIMO: second order dynamical regulator –LFF: modifies FF to minimize repetitive controller error –BLC: modifies FF to compensate beam loading –BBF: modifies setpoints to minimize beam energy error Local (cryomodule-level applications) –Gradient limiter: truncate RF/acts on SP to lower cav. Grad. –Quench detect: RF off at next pulse –Auto Loaded-Q: set and monitor cav. QL –Auto Pk/Ql control to flatten gradients –Auto piezo setup: Lorentz force detuning compensation –Energy optimizer: distribute energy losses to other stations Operations: startup, shutdown, exception management,… Carwardine: 9mA meeting, 22 May 2012