ILC Damping Ring Kickers Presenter: Josef Frisch Dec 7, 2004.

Slides:



Advertisements
Similar presentations
Some Timing Aspects for ILC Heiko Ehrlichmann DESY GDE, Frascati, December 2005.
Advertisements

Americas Region Inductive Adder Modulators for ILC DR Kickers Craig Burkhart SLAC For SLAC-LLNL Team Ed Cook, C. Brooksby LLNL R. Cassel, T. Beukers, C.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
RF particle acceleration Kyrre N. Sjøbæk * FYS 4550 / FYS 9550 – Experimental high energy physics University of Oslo, 26/9/2013 *k.n.sjobak(at)fys.uio.no.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
A fast RF kicker for the MEIC electron cooler Andrew Kimber Amy Sy 31 st March 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Feedback On Nano-second Timescales: An IP Feedback System for the Future Linear Collider Requirement for a fast IP beam-based feedback system Simulation.
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Travelling Wave Tube For Broadband amplifier helix TWTs (proposed by Pierce and others in 1946 ) are widely used For High average power purposes the.
CLIC meeting, Prospects for developing new tubes I. Syratchev, CERN.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Advanced Light Source A New Operational Mode at the ALS Pseudo Single Bunch Greg Portmann, Slawomir Kwiatkowski, David Robin, Walter Barry, Greg Stover,
ILC Program discussion M. Ross Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β, 7e-4 stability,
CLIC Workshop, February, CERN. I. Syratchev Roadmap for CLIC high-efficiency klystron development I. Syratchev, CERN.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Measurements and potential improvements of the amplifier for the 10 MHz cavities G.Favia, V.Desquiens, M.Morvillo.
Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, Dec 207.
ILC Interaction Point Intra-Train Feedback Kicker November 1, 2005 Steve Smith.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
Tao Tang, Craig Burkhart
Power Supply Design Howie Pfeffer Mu2e Extinction Technical Design Review 2 November 2015.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
ALCW at SLAC, January 7, 2004J. Rogers, Novel Schemes for Damping Rings1 Novel Schemes for Damping Rings J. Rogers Cornell University Improving dynamic.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Prospects for developing new tubes
DR Kicker R&D: Goals and Work Scope
LCLS_II High Rep Rate Operation and Femtosecond Timing
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
CLIC Damping ring beam transfer systems
Design Fabrication and Processing Group H. Padamsee
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
George Gollin Department of Physics
Fast Kicker R&D in the Americas Region
George Gollin University of Illinois at Urbana-Champaign and
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
Damping Ring Kicker Tests at AØ
Klystron Power Supplies for ILC
Strip-line Kicker R&D at KEK-ATF
Intra-Pulse Beam-Beam Scans at the NLC IP
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Status of CTC activities for the Damping rings
Explanation of the Basic Principles and Goals
Kicker and RF systems for Damping Rings
Gap Transient Suppression using Increased Bunch Density
eSPS Impedance Considerations Aaron Farricker Acknowledgements: T
Presentation transcript:

ILC Damping Ring Kickers Presenter: Josef Frisch Dec 7, 2004

Basic kicker types Conventional pulser (Remainder of this presentation). –High voltage pulse driving (probably) strip line kicker –Simple, minimal impedance problems (screen electrodes) –May require exotic pulser. RF kicker –Pulsed RF source driving low Q deflection structure. –Makes use of available high power, broadband RF sources –Possible impedance issues Resonant deflection system –Uses multiple resonant cavities driven with a set of frequencies to select bunches –Multiple designs – too varied to discuss here –Quasi-CW RF eliminates ringing, provides good stability –Impedance, RF kicks within bunches, etc need to be understood.

Approximate requirements for pulsed kicker Deflection angle 0.6 mrad (0.01 T-M) for TESLA ring design If we allow 10 Meter total kicker length –Need 50 Amp kicker drive Length of each kicker << bunch spacing (assuming speed of light kicker). –For 3 nanosecond, need ~20 Kickers Stripline kicker impedance probably ~100 Ohms (assuming speed of light kicker) Pulsers: 5Kv, 50Amp, 20 units, 2nanosecond rise and fall time. –Just for scale: Actual specifications depend on detailed ring design Un-kicked bunches must not be disturbed by more than 7x10 -4 of kicked bunch.

Basic Extraction Scheme

Comments on Basic Scheme Shortest ring for given current –No unused bunches, or gaps (except ion clearing). Tight requirements on kicker stability and fall time –Need to not disturb neighboring bunches by more than 7x10 -4 of kicked bunch Falling edge of a pulse typically more difficult to control than rising edge. –Ringing from impedance mismatches, stray inductance etc.

Buffer pulse scheme

Comments on buffer pulse scheme “Buffer” pulses are not needed for luminosity –Can probably kick by of main kick –Allows longer settling time to 7x Need to replace buffer pulses –May be tricky with positrons if bunches are generated by main electron beam: Might need to waste a machine cycle. Slightly longer ring for same average current.

Kicker Gap Scheme

Comments on Kicker Gap Scheme Gap allows extraction kicker with fast rise, but unrestricted settling for next pulse, settle to 7x10 -4 after gap Injection kicker (larger pulse) only needs 1% interference with preceding bunch, and 1% after gap. Scheme does not work if positrons generated by luminosity generating electron beam –Works if you have a pre-damping ring. Scheme requires that ring empty, then re-fill in 2 milliseconds – might cause ring stability problems.

Kicker Gap Extraction & Injection Injection and extraction with fast rise slow fall if DR size is not determined by kicker rise time

Comments on Kicker Gap Scheme Average ring current constant Allows use of slow fall time kicker Requires 2X ring length for same bunch spacing. Beam current harmonic content changes –DR physics question

Kicker Driver Requirements 20 Units ~5KV, 50Amps –Depends on damping ring design, kicker length, etc –250KW peak power –2.5KW, average power, 1 millisecond –25 Watt long term average Few nanosecond rise and fall, with settling to <7x10 -4 for preceding and following pulses.

Snap / Step Diodes <50 picoseconds to 20V. sub-nanosecond to 300V, 6 Amps. (1800W peak). High power devices from Institute of Electrophysics –600 picosecond to 1000 Amps (?? Voltage) –5 nanosecond to 400KV. –Repetition rates to few KHz. Power dissipation probably limits rep rate.

Step recovery diode pulses Very fast high voltage pulses Repetition rate limited to ~KHz (for these devices). Institute of Electrophysics

Avalanche Transistors –<200 picoseconds to 200V, ~50 Amps (10KW) –Arrays (tapered transmission lines) demonstrated to 40KV, 800A, 200ps. (Kentech) –Recovery time too long except in liquid nitrogen (50nsec reported) –Average power limited to ~1W / device. –Combining may lead to ringing. Low Repetition Rate 40 KV in 200ps rise time (Kentech)

MOSFETs Individual devices to ~1Kv, ~50Amps, ~3ns rise and fall times. Variety of combining schemes to high power, medium fast rise. –DARHT-2 kicker: 20KV, 10ns rise / fall, 1.6MHz burst ( 4 pulses) –Belkhe / TESLA: 7.5Kv, 72A, 5.3ns, 1MHz (200 pulses). (fall time slower) –Belkhe – datasheet 3Kv, 80A, 2ns, 1 MHz (MAX) burst. (10 pulses). –Kentech: 10Kv, 2ns – could operate at high rate. Relatively low impedance – (~10 Ohms), stray inductance ringing can be a problem –Gate drive is very low impedance <<1 Ohm. Probably OK for ~10 nsec rise / fall times. (maybe faster) May be used as driver for additional stage / compressor

MOSFET Pulses 4MHz pulses, but with 18ns risetime

More MOSFET pulses (Kentech) 5 channels Lower voltage 2.5MHz pulser

MOSFET pulser comments Very likely to use MOSFET technology in pulser – maybe with shock line for compression. Some designs (Belkhe) are very fast but have limited repetition rate. Problem is not thermal – but design in proprietary.

Shock Lines - Ferromagnetic Nonlinear transmission line: Wave velocity increases with pulse voltage “Sharpens” front end of pulse Ferromagnetic (most common): (used for SLAC Kicker (Cassel) 95KV, 380 Picoseconds rise (Seddon et al, 1987), Ferroxcube B2 ferrite

Shock Lines – Ferromagnetic (SLAC)

Ferromagnetic Shock Lines, Falling edge

Shock Lines - others Ferroelectric –20KV, 400 Picosecond (Oxford – Web report) Diode loaded line –Monolithic (Allen, 1994 thesis), 4V at <700 Femtoseconds! (expect <170 fsec in future) Vacuum Magnetron line: –At high voltages, magnetic field insulates line –Probably only applicable at higher power than we require.

Shock Lines - comments Most work in shock lines has been to obtain very fast, very high power pulses – well beyond our requirements Typically operated at low repetition rates. Need to eliminate (typical) slow tail from release of energy stored in non-linear material. For ILC high repetition rate may lead to heating problems (need low loss nonlinear material). Ferromagnetic and ferroelectric materials tend to also have magnetostrictive / piezoelectric effect –For millisecond pulse burst could lead to stability problems. Many non-linear materials have strong temperature sensitivity – may lead to stability problems.

Hard Tube Switches Pulser based on Eimac Y-690 tube used for Pockels Cell drive at SLAC (M. Browne, D. Brown). –6KV, 30 Amps, <1.5ns rise time. –Driven by avalanche transistors – not appropriate for high repetition rate –Would need to parallel 2 tubes for ILC kicker (easy) Nonlinearity of tubes helps with settling time. Average power “not unreasonable” but would need to check. (grid dissipation)

Hard Tube Pulser Note, tail on pulse believed to be due to output Transformer (not needed for ILC kicker)

Custom Tube Pulser

Custom tube Comments Single beam switched between multiple (~20) Anodes. Tube parameters comparable to other big power tubes (klystrons). Something of this sort would very likely work, but would require a large development effort. Only consider if conventional pulsers will not work.

Kicker Magnet Probably need speed of light kicker Kicker fill time + pulse rise time -> effective rise time –Need short (< 1 Meter) kickers. Need to avoid reflections / ringing –Must be designed as a RF component –Full E+M simulation / optimization Possibly shield beamline with thin screen (to block beam wakefields (~10GHz), but transmit kicker fields (~300 MHz). Want optimized design to minimize kicker power

Stability / Settling time issues Multiplicity of kickers helps with random noise Reproducible and small settling time problems can be fixed with additional kicker driven by AWG and power amplifier. Probably want feed forward from beam position / angle out of ring to kicker in main beam line –Assumes turn-around after damping ring

Correction Scheme

Correction Scheme - variant

Correction scheme / layout issues. The 7x10 -4 stability specification is Heroic! –Difficult to measure without a beam line (ATF?) The kicker driver will likely have pulse – pulse feedback to flatten the waveforms Would like a beamline arrangement which allows feed-forward from output beam

Ongoing Work ATF Damping Ring in Japan: Proposal to build a single pulse extraction system –Good test bed for kickers, and stabilization –Provide ILC – like test beam (~200 bunches) –Requires higher Kicker drive power than ILC Working on kicker / optics design to reduce DHART FET pulser -> shock line –Test high repetition rate shock lines DESY working on paralleling Belkhe pulsers to increase repetition rate. SLAC to obtain Belkhe pulser for testing shock lines.

Overall Comments Can probably build a kicker to meet any likely damping ring requirements, for a small fraction of the damping ring cost –Optimize the ring design, see what is needed. Best guess: MOSFETs driving Ferromagnetic shock line. –Hard tubes an option. Custom tube can probably solve the problem, but expensive to develop – leave as a backup plan. Want technology demonstration prototypes soon, to allow selection of technology, and system development. Kicker parameters (voltage, current, etc) depend on details of ring design.