1 Presented by Patrick Coronado ( Information provided by NASA/GSFC: Angie Kelly, Bill Guit, and Eric Moyer) Earth Observing System (EOS) Mission Status.

Slides:



Advertisements
Similar presentations
Kathy Fontaine CEOS WGISS 24, DLR Oberpfaffenhofen Munich October NASA Agency Report.
Advertisements

CSPP/IMAPP Users' Group Meeting May 21-23, 2013
Summary of Terra and Aqua MODIS Long-term Performance Jack Xiong 1, Brian Wenny 2, Sri Madhaven 2, Amit Angal 3, William Barnes 4, and Vincent Salomonson.
NOAA Satellite and Information Service POES NOAA Satellite and Information Service POES OVERVIEW Cindy Hampton Office of Satellite and Product Operations.
ASTER Operation Scenario and Status Y. Yamaguchi (Nagoya Univ., Japan) M. Fujita, T. Tachikawa, M. Kato, H. Tsu ( ERSDAC, Japan), M.J. Abrams, L. Maldonado.
POLICY Space Export Controls Update Since Delivering the 1248 Report to Congress - April 2012 −Congress added language into the FY13 National Defense Authorization.
Terra: Aging Spacecraft and Considerations of Maintaining Mean LocalTime vs. Maintaining Altitude and Allowing MLT to Drift K. Thome, T. Heyd, D. Mantziaras,
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
ESDIS Project Status 12/1/2005 Dan Marinelli, Science Systems Development Office.
OMI's Contributions to the Success of the NASA Aura Mission & U.S. Contribution to the Success of OMI Aura Project Science Office Anne Douglass, Joanna.
Spacecraft in normal Mission Mode, all systems nominal
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
Remote Sensing of Mesoscale Vortices in Hurricane Eyewalls Presented by: Chris Castellano Brian Cerruti Stephen Garbarino.
Terra at 10 The EOS Flagship Eric Moyer NASA/Goddard Space Flight Center Greenbelt, Md Photos provided by Al Lampe May 11, 2010 Goddard Space Flight.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
Status GRACE Mission Operations 1 GSTM – Potsdam - 15 October 2007 Status GRACE Mission Operations Joseph G. Beerer, JPL Operations Mission Manager Franz-Heinrich.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
Advanced Spaceborne Thermal Emission and Reflection Radiometer
NASA, CGMS-40, November 2012 Coordination Group for Meteorological Satellites - CGMS Status report on the current and future satellite systems by NASA.
High Altitude Scientific Ballooning (Near Space Engineering)
Presentation April 26, 2007 at the NASA GSFC Earth Day celebrations Our Home Planet as Viewed from the Aqua Satellite Claire L. Parkinson/Aqua Project.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
Hubble: Back in Business and Better Than Ever Dr. Frank Summers Space Telescope Science Institute September 9, 2009.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
ESMO 1 Constellation Operations Lessons Learned For Future Exploration Angelita C. Kelly / NASA Goddard Space Flight Center Warren F. Case / SGT, Inc.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
NASA, CGMS-41, July 2013 Coordination Group for Meteorological Satellites - CGMS Status report on the current and future satellite systems by NASA Presented.
Gene Legg Office of Satellite Data Processing and Distribution Asia Pacific Satellite Data Exchange and Utilization Meeting Honolulu, HI, September 20-22,
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
EOS Aura Science Team Meeting
AURA MOWG EMOS & IST Re-Engineering 2 October 2007 Pat Johnson.
Space Station Will it be accessible for You and Me?
Terra Launched December 18, 1999
Aura Science Team Meeting Mission Operations Working Group HIRDLS – Jim Craft, Chris Hepplewhite Oct 1 - 5, 2007 JPL, Pasadena, Ca.
STARDUST 20 Nov 2003CERR - Charles Love1 of 7 STARDUST Project CRITICAL EVENTS READINESS REVIEW COMET P/WILD 2 ENCOUNTER ISA Status Charles Love JPL:
1 Weekly Summary Weekly Summary Formation Flight AEM4332 Spring Semester March 7,2007 Masao SHIMADA.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
Science of the Aqua Mission By: Michael Banta ESS 5 th class Ms. Jakubowyc December 7, 2006.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
By: Kate Naumann And Colleen Simpkins. Aqua is a major international Earth Science satellite mission centered at NASA. It was launched on May 4, 2002.
Spaceweather Working Group Spaceweather Working Group Earth Science Mission Operations Eric Moyer ESMO Deputy Project Manager - Technical
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
Space Environment September 30,2003 H. Kirkici Istanbul Technical University Lecture-3 Summary Vacuumsolar UV degradation contamination Neutral:Mechanical.
Mars Climate Orbiter. FOR IMMEDIATE RELEASE September 23, 1999 NASA'S MARS CLIMATE ORBITER BELIEVED TO BE LOST NASA's Mars Climate Orbiter is believed.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
Orbital Analysis for Inter-Calibration Dave Mac Donnell Brooke Anderson Bruce Wielicki Don Garber NASA Langley Research Center Solar Workshop January 30,
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
NASA's Aura satellite launched July, 15, 2004 from Vandenberg Air Force Base, Calif Orbit: Polar: 705 km, sun-synchronous, 98' inclination, ascending.
Amy Blas Hawaii Space Flight Laboratory University of Hawaii.
1 J. Ranson NASA’s Earth Observing System Terra Mission Update Jon Ranson, Terra Project Scientist Si-Chee Tsay, Terra Deputy Project Scientist NASA’s.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
JASON-1 MISSION STATUS S. Coutin-Faye CNES, Altimetry and Precise Positioning Office.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Reading assignments for chapter 6 Pages – – – –
MsWG (Apr 22, 2015) Recent L1B LUT delivery since April 8, 2015
Technical Resource Allocations
NASA Aqua.
USGS Agency Report to GSICS March 20, 2017
CINEMA Orbit/Attitude? (looking down from top toward earth)
AIRS (Atmospheric Infrared Sounder) Instrument Characteristics
James Webb Space Telescope
Data Preparation for ASTER
SDO Flight Dynamics Subsystem
Satellite Sensors – Historical Perspectives
CubeSat vs. Science Instrument Complexity
USGS Agency Report to GSICS March 4, 2019
Afternoon Constellation
Presentation transcript:

1 Presented by Patrick Coronado ( Information provided by NASA/GSFC: Angie Kelly, Bill Guit, and Eric Moyer) Earth Observing System (EOS) Mission Status NOAA Direct Broadcast Conference April 6, 2011 Aqua Aura Terra

2 Terra: Launch Date: December 18,1999 (Atlas IIAS, VAFB) Orbit: 705 km, sun-synchronous polar, 98.2 o  Inclination, 10:30 AM MLT descending node Instrument Payload: ASTER (SWIR, TIR & VNIR) (Japan); CERES (Fore & Aft) (USA – NASA LaRC); MISR (USA –NASA JPL); MODIS (USA – NASA GSFC); MOPITT (Canada) Aqua: Launch Date: May 4, 2002 (Delta, VAFB) Orbit: 705 km, sun-synchronous polar, 98.2 o  Inclination, 1:30 PM MLT ascending node Instrument Payload: AMSR-E (Japan); AMSU (USA –NASA JPL); AIRS (USA –NASA JPL); CERES(USA – NASA LaRC); HSB (Brazil); MODIS (USA – NASA GSFC) Aura: Launch Date: July 15, 2004 (Delta, VAFB) Orbit: 705 km, sun-synchronous polar, 98.2 o  Inclination, 1:45 PM MLT ascending node Instrument Payload: HIRDLS (UK/NASA/UCAR); MLS ((USA –NASA JPL); OMI (KNMI, Netherlands); TES (USA –NASA JPL) EOS Project Management: Earth Science Mission Operations (ESMO), NASA GSFC Mission Operations: NASA GSFC Instrument Operations and Science Data processing: Performed at respective Instrument Locations Science Data Processing: Level zero: EOS Data Operations System (EDOS); Level 1+: Various Data Centers and Investigator-led Processing Facilities in the US and International Partner Facilities EOS Terra, Aqua, and Aura Missions

3 Terra Summary Spacecraft Status - GREEN Instrument Status - GREEN –ASTER: VNIR and SWIR nominal; SWIR ops ended 2008 –CERES: Operating Normally –MISR: Operating Normally –MODIS: Operating Normally –MOPITT: Operating Normally Data Capture/L0 Processing Status – GREEN –SSR Data Capture over life of the mission:~99.00 % Ground Systems – System Upgrades in progress –Implementing system changes and new back-up control center –No planned interruptions to operations –Completion in Summer 2011

4 Terra has sufficient propellant to maintain Mean Local Time (MLT) of 10:30am +/- 1 minute through 2017 Terra can continue to operate through Summer of 2019 by allowing MLT to drift towards minimum MLT requirement of 10:15 am (established prior to launch) Terra Predicted Propellant Usage based on Nominal Solar Flux

5 Aqua Mission Summary Spacecraft Status - GREEN Instrument Status - GREEN –AMSR-E, AIRS, AMSU, CERES & MODIS: »Operations Nominal – Producing Great Science –HSB: Survival Mode since 2/5/2003 Data Capture/L0 Processing Status – GREEN –SSR Data Capture to over life of the mission: ~ % Data Latency – Excellent Ground Systems – System Upgrades in progress –Implementing system changes and new back-up control center –No planned interruptions to operations –Completion in Summer 2011

6 Aqua Fuel Usage: Actual & Predicted Fall 2006 Delta-i Maneuvers Fall 2004 Delta-i Maneuvers Spring 2007 Delta-i Maneuvers Spring 2010 Delta-i Maneuvers (3) Annual Delta-i Maneuvers Spring 2018 Delta-i Maneuvers Ascent Maneuvers Spring 2009 Delta-i Maneuvers (9) Aqua spacecraft has sufficient fuel to maintain its current orbit within the Afternoon Constellation through FY2018 and possibly well beyond

7 Aura Summary Spacecraft Status - GREEN Instrument Status - GREEN –HIRDLS: Not collecting science data – Chopper Stalled 03/17/08 –MLS: Operating Normally »Periodic Band 13 measurements »THz module currently in standby mode –OMI: Operating Normally »Field-of-View Anomaly started in September 2007 – currently stable –TES: Operating Normally Data Capture/L0 Processing Status – GREEN –SSR Data Capture over life of the mission:~99.99 % Ground Systems – System Upgrades in progress –Implementing system changes and new back-up control center –No planned interruptions to operations –Completion in Summer 2011

8 Aura Fuel Usage: Actual & Predicted Spring 2010 Inclination Adjust Maneuvers (3) Spring 2018 Inclination Adjust Maneuvers Ascent Maneuvers Spring 2009 Inclination Adjust Maneuvers (9) Aura spacecraft has sufficient fuel to maintain its current orbit within the Afternoon Constellation through FY2018 and possibly well beyond

9 Additional Information

10 DateIncidentCauseResponse/Impact 6/15/2001MODIS Power Supply 2 failed Suspect a High Energy Particle was the cause of the thermal runaway condition damaging the Field Effect Transistors (FET) Switched to Redundant Power Supply. Redundant Power Supply has been nominal. 9/10/2002MODIS Formatter Side A Timing Errors corrupting Science (Degraded Performance) Formatter A has had a history of problems which resulted in processing errors. The likely cause of the Formatter Timing Errors is an incorrectly terminated clock signal. Fixed on Aqua. 9/10/02 MODIS Science data was affected. MODIS Formatter Swap to Side B was performed on 9/17/02. Since the switch, no Formatter Errors have been detected and the data quality is excellent. 5/29/2008Direct Access System Modulator prevented X-Band Electrical Power Conditioner (EPC) Side failed. Cause Unknown Switched to redundant side to restore X-Band capability. X-Band has been nominal since recovery. 10/13/2009Hex Bay Battery Assembly (BBAT) heater control failed on 4 of 9 heater groups and Cell #50 of 54 failed Suspect impact from Micro-Meteoriod or Orbital Debris (MMOD) Science is unaffected by anomaly. Modified battery management to account for loss of one cell, increased charge/discharge ratio and increased remaining five heater group temperature setpoints to keep cell temperatures above freezing. Note: Power Module Battery continues to operate nominally. Terra Anomaly* History * -- Significant anomalies

11 Aqua Spacecraft Subsystems Command & Data Handling (CDH) – Nominal –Solid State Recorder (SSR) – only holds 2 orbits of data –SSR Anomaly (12/02/07) – fully recovered 01/28/09 Communications (COMM) – Nominal Electrical Power System (EPS) – Nominal –Battery Cell Anomaly (09/02/05) –Solar Panel #8 Thermistor #6 Failure (08/03/09) –Solar Array Offset (Reported 11/17/09, Corrected 06/29/10) Flight Software (FSW) – Nominal Guidance, Navigation & Control (GN&C) – Nominal Propulsion (PROP) – Nominal –Dual Thruster Module (DTM-2) Heater Anomaly (09/08/07) Thermal Control System (TCS) – Nominal All subsystems still configured to primary hardware

12 Aura Spacecraft Subsystems Command & Data Handling (CDH) – Nominal –Solid State Recorder (SSR) Anomaly (December 4-18, 2007) »Returned Nov 2010 – Jan 2011 at reduced level – then subsided Communications (COMM) – Nominal Electrical Power System (EPS) – Nominal –Solar Panel Connector Anomaly (January 12, 2005) –Solar Array Offset (Reported 11/17/09, Corrected 06/29/10) –Array Regulator Electronics 5A Anomaly (March 11, 2010) »Simultaneously with GN&C Attitude Disturbance Flight Software (FSW) – Nominal Guidance, Navigation & Control (GN&C) – Nominal –Earth Sensor Assembly (ESA) Anomaly (May 29, 2009) »Recovered by re-calibration in Fall 2009 Propulsion (PROP) – Nominal –Dual Thruster Module (DTM-3) Anomaly (Aug 16, 2005) Thermal Control System (TCS) – Nominal All subsystems configured to primary hardware