COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008.

Slides:



Advertisements
Similar presentations
General Safety Overview and Information
Advertisements

Other Types of Cleaning
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Feedback from Recent Group Meetings Positive Events High Voltage Hazards Safety Photos of the Week Collider-Accelerator Department Take 5 for.
You Can Prevent This Implementing an integrated pest management (IPM) program. Working with a pest control operator (PCO)
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Basic cleaning procedures
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
By: Clàudia Pellicer, Víctor Sánchez and Ana Lucía Londoño.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
How to build a two storey house
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report Submitted By Facility Management Team
Finishing the Building
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 13 Civil Engineering Detail Drawings.
FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 28 May 2014 Cleanroom administrative committee.
Monthly Management Report Submitted By Facility Management Team
Puesta Del Sol II Progress and Update Report May, June, & July, 2000.
Auto shop safety Safety around the shop. Safety Which characteristic is essential for the professional auto technician? Responsible attitude Knowledge.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Consumer’s Main Switchroom & Main L.V. Switchboard
August 4, 2008 Smoke Testing Public Informational Meeting Smoke Testing Project – University/Prior Avenue Area Hamline Midway Library August 4, 2008 Short.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
 Water Purifier.  CFL lamp and Ceiling Fan in each room.  Exhaust fan in kitchen & toilets.  Solar Water Heating System for Master Bedroom Toilet.
Smoke Testing Information
KARMA GBM /5/ AGENDA Update on FY14-15 projects and pending items Closure of FY KARMA Financial Statements Introduction of New Committee.
Summer 2015 Update Tom Kulczewski Director of Buildings & Grounds September 17, 2015.
Submitted To:- Submitted By:- Mr.
COZYEON Residence Main facilities gallery. Corridor of each floor.
Monthly Management Report Jul2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Prestige Lake Ridge Yadalam Nagar, Subramanyapura Post, Uttarahalli, South Bangalore.
DREAMZ SUPRICHITH Location:HEBBAL Dreamz Infra India Ltd.
INTRODUCTION TO DEMAND SIDE MANAGEMENT(DSM) PRESENTED TO ZAMBIA ASSOCIATION OF MANUFACTURERS ENERGY EFFICIENCY AND CONSERVATION WORKSHOP 5-6 SEPTEMBER.
Where your dreams come true.... L IFE AT MIST is meant to be experienced, not seen. With top-of-the-line features Like UPVC Windows & Shutters, Gymnasium.
Bengal Shapoorji Housing Development Pvt. Ltd. Presents Lavish Real Estate Properties In Kolkata.
Why make a plan? Disasters change things. When an emergency happens you may have to decide what to do very quickly, while you are worrying about what.
ABOUT DREAMZ INFRA INDIA PVTLTD Dreamz Infra India Pvt Ltd is started at March 8 th 2011 which is certified by ISO 9001:2008 Dreamz Infra India Pvt.
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
Monthly Management Report September Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report Jun2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Creating a Clean and Hygienic Foodservice Operation
GMP (Good Manufacturing Practices) can be defined as a package of requirements and procedures by which the work methodology takes place under controlled.
Dream Flower Akademia – Flats in Cochin. Floor Plans.
Stands for Innovation. Contact No: Mail: Dreamz Siddesh - BELLANDUR
Industrial Safety Management Work Premises & Housekeeping.
Bengal Shapoorji Housing Development Pvt. Ltd. Presents Shukhobrishti: Luxury Residential Flats.
PRESTIGE LAKE RIDGE OVERVIEW PRESTIGE LAKE RIDGE is a brand – new Ongoing residential apartment project developed with.
Prestige Falcon City Overview Prestige Falcon City By Prestige Group is Luxury Mixed Use Development, Located at.
Prestige Falcon City Overview Prestige Falcon City By Prestige Group is Luxury Mixed Use Development, Located.
Routine Inspections 1 1.
An overview of School health and safety AT THE DESIGN STAGE
FIRE LIFT –DESIGN REQUIREMENTS in reference with NBC-2005
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
UNIT-III MAINTENANCE OF SAFETY
Natural Sciences and Technology Grade 6
TIPS TO MAINTAIN YOUR NEW AUDI CAR. THESE ARE THE THINGS TO BE TAKEN CARE TO AVOID DAMAGES FOR YOUR HEAVY INVESTMENT CAR, PEOPLE SEARCH MORE USED AUDI.
Building Drawings.
,
Location Plans & Site Plans
February 2019.
::Address Location:: 1450, Madurdaha, Hussainpur,
Non-Structural Safety
Presentation transcript:

COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008

Lead Facility Services Globally SAFETY No Safety Issues

Lead Facility Services Globally Organization Chart

Lead Facility Services Globally FMS Update Phase 1 Earth pit OHMS value taken. Phase 2 all switch room split A/C outdoor unit support channel removed and provided to ground floor. Monthly service was done for passengers lift 1 & 2 in Phase 1 by ETA MELCO. Phase 1 & 2 workstation raw power and ups power point sticker is pasting work done. 50 KVA capacitor has been connected in the AC panel - 1/1 spare FSU 125 A at Phase 1 ground floor electrical room Technical

Lead Facility Services Globally LUX meters Readings taken for all floors of Phase- 1 & 2 PDB socket identification marking sticker work done at Phase KVA capacitor connected to MV panel – 2 50 KVA capacitor connected in Phase 2 security room, MV panel - 2, UPS / A/c unit. FMS Update Technical

Lead Facility Services Globally Phase 1, 8th floor to 4th floor side wall scrubbed Substation cobweb removed. Fire hydrant pipe lines at Car parking dusting work done. Outer area pan stain removed. White patches on the wash basin has been removed. FMS Update House keeping

Lead Facility Services Globally Sending feedback forms to associates for all the complaints and requests. No pending calls. 18 Nos of rat has been caught FMS Update Admin Helpdesk Pest Control

Lead Facility Services Globally Highlight Acrylic sheet fixed for hand support near shoe polishing machine at phase 1 & 2. Wall Painting done at Phase 1 & 2 near shoe polishing. 200 no's chair arrangements done in phase - 1,8th floor cafeteria for quiz competition program. Received 7 appreciation mails from associates for the quick response time level. House keeping Technical Helpdesk

Lead Facility Services Globally Power Consumption

Lead Facility Services Globally Diesel Consumption

Lead Facility Services Globally Water Consumption

Lead Facility Services Globally SLA for AC

Lead Facility Services Globally Power cut details

Lead Facility Services Globally Concerns Manholes to be closed at out gate and two wheeler parking area to avoid rats to enter inside the building. Non veg. counter partition has to be rectified as it is so weak at phase 1 and 2 cafeterias. Fire hydrant points to be rectified at the outer area. Street lights has to be serviced. Phase 2 sliding door sensors to be rectified.

Lead Facility Services Globally September Month plan Pedestrian painting to be done. DG battery stand to be made. Chiller snag work to be completed. Workstation tables deep cleaning to be done. Polishing of all floors lift landing and lobby floors. Deep pest control treatment. Technical House Keeping Pest Control

Lead Facility Services Globally Help Needed Civil work pending for a long time from CDS (e.g. Wall cracks, Manhole closing, Fire hydrant rectifications, Stair case skirting fixing etc….). Evacuation plan for PRN facility required. Need approval for polishing floors at lobby and all lift landing areas. Steel rack for Engineering store. All DG roof gap (near exhaust pipeline) needs to be closed, DG snag to be rectified. 1. All DG Silencers painting to be done. 2. Lubricant oil drain cock leaks to be arrested. 3. DG –No:2 door hinges got damaged needs to be fixed.

Lead Facility Services Globally Helpdesk Call Summary Received for August 08

Lead Facility Services Globally Helpdesk Call Summary Requests Complaints

Lead Facility Services Globally Thank You