P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.

Slides:



Advertisements
Similar presentations
1AIDA final meeting, CERN 9-11 December 2014 Vladimir Cindro, Jožef Stefan Institute Transnational access to TRIGA _Mark III reactor at Jožef Stefan Institute,
Advertisements

Irradiation at IUCF We irradiated 5 chips from Sintef wafer 9 (7,39,42,44,46) at Indiana University Cyclotron Facility on 30th November. Pixel 7,44 and.
20th RD50 Workshop (Bari)1 G. PellegriniInstituto de Microelectrónica de Barcelona G. Pellegrini, C. Fleta, M. Lozano, D. Quirion, Ivan Vila, F. Muñoz.
Wide Bandgap Semiconductor Detectors for Harsh Radiation Environments
Status and outlook of the Medipix3 TSV project
Plans for Demonstrator Flip Chip Bonding GTK meeting 9/12/08 1.
J. Salonen, “Flip Chip Bumping Process at VTT" [presentation for GPG], 16-March-2007 Flip Chip/Bumping Process at VTT Last modified March 16, 2007 By Jaakko.
On MCz SCSI after 24 GeV/c proton irradiation 12th RD50 Workshop Ljubljana, 2-4 June 2008 D. Creanza On behalf of the Bari and Pisa RD50 groups.
Charge collection studies on heavily diodes from RD50 multiplication run G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
STAR Microvertex Upgrade Meeting, Strasbourg, April Status of sensors from the engineering run AMS-035 OPTO Wojciech.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
G. Parès – A. Berthelot CEA-Leti-Minatec GU project status.
Charge collection studies on heavily diodes from RD50 multiplication run (update) G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
11 th RD50 Workshop, CERN Nov Results with thin and standard p-type detectors after heavy neutron irradiation G. Casse.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Study of leakage current and effective dopant concentration in irradiated epi-Si detectors I. Dolenc, V. Cindro, G. Kramberger, I. Mandić, M. Mikuž Jožef.
23 July 2012 Thoms Bergauer (HEPHY Vienna) Sensor Irradiations and Testbeams 12 th B2GM Bad Aibling.
4/2/2003P. Riedler/CERN SPD Team1 Testing Wafer test status Annealing tests on VTT ladder.
RD50 RD50 workshop FreiburgKatharina Kaska 1 Determination of depletion voltage from CV, IV and CCE measurements on Pad Detectors Katharina Kaska, Michael.
1 G. Pellegrini The 9th LC-Spain meeting 8th "Trento" Workshop on Advanced Silicon Radiation Detectors 3D Double-Sided sensors for the CMS phase-2 vertex.
M. Lozano, C. Fleta*, G. Pellegrini, M. Ullán, F. Campabadal, J. M. Rafí CNM-IMB (CSIC), Barcelona, Spain (*) Currently at University of Glasgow, UK S.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Silicon detector processing and technology: Part II
MIT Lincoln Laboratory NU Status-1 JAB 11/20/2015 Advanced Photodiode Development 7 April, 2000 James A. Burns ll.mit.edu.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Effects of long term annealing in p-type strip detectors irradiated with neutrons to Φ eq =1·10 16 cm -2, investigated by Edge-TCT V. Cindro 1, G. Kramberger.
1/14 Characterization of P-type Silicon Detectors Irradiated with Neutrons M.Miñano 1, J.P.Balbuena 2, C. García 1, S.González 1, C.Lacasta 1, V.Lacuesta.
Inversion Study on MCz-n and MCz-p silicon PAD detectors irradiated with 24 GeV/c protons Nicola Pacifico Excerpt from the MSc thesis Tutors: Prof. Mauro.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Production Readiness Review of L0/L1 sensors for DØ Run IIb R. Demina, August, 2003 Irradiation studies of L1 sensors for DØ 2b Regina Demina University.
D. Henry / CEA-Leti-Minatec Contibuting authors : A. Berthelot (LETI) / R. Cuchet (LETI) / J. Alozy (CERN) / M. Campbell (CERN) AIDA Meeting / 08 & 09th.
Lehman Review April 2000 D. Bortoletto 1 Forward Pixel Sensors Daniela Bortoletto Purdue University US CMS DOE/NSF Review April 12,2000 Progress.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
2/5/06G. Stefanini/P326 SPC Ref/GTK WG1 Progress on Gigatracker Pixels Sensors Bump bonding Pixel ASIC and readout electronics Detector configuration Cooling.
CNM double-sided 3D strip detectors before and after neutron irradiation Celeste Fleta, Richard Bates, Chris Parkes, David Pennicard, Lars Eklund (University.
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
Charge Multiplication Properties in Highly Irradiated Thin Epitaxial Silicon Diodes Jörn Lange, Julian Becker, Eckhart Fretwurst, Robert Klanner, Gunnar.
Procurement Readiness Review : Detector Fabrication, Qualification & Assembly at India M D Ghodgaonkar Electronics Division, BARC, India.
RD50 RD50 Workhop: CERN Katharina Kaska Epitaxial silicon detectors irradiated with protons and neutrons Katharina Kaska, Michael Moll RD50 Workshop.
Giulio Pellegrini 27th RD50 Workshop (CERN) 2-4 December 2015 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona 1 Status of.
DEPFET Workhop, Ringberg, June Ladislav Andricek, MPG Halbleiterlabor Lessons learned from EMCMs assembly status - next steps.
The medipix3 TSV project
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Anna Maria Fiorello - Research Dept ATLAS-Pixel Project: Bump Bonding ATLAS BUMP BONDING PROCESS.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
SOI for Belle II PXD DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples for thermal mock-ups 
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
RD50 CCE measurements and annealing studies on proton irradiated p-type MCz diodes Herbert Hoedlmosera, Michael Molla, Michael Koehlerb, Henri Nordlundc.
Radiation damage studies in LGAD detectors from recent CNM and FBK run
New Mask and vendor for 3D detectors
Pilot run – matrix measurements after first metal
First Investigation of Lithium Drifted Si Detectors
Update on Bump Bonding GTK-Meeting Sep. 2, 2008 pr.
Hybrid Pixel R&D and Interconnect Technologies
The SOI Issue – Material for PXD9
Highlights of Atlas Upgrade Week, March 2011
Study of radiation damage induced by 24/c GeV and 26MeV protons on heavily irradiated MCz and FZ silicon detectors N. Manna Dipartimento Interateneo di.
ALICE PD group meeting Andrea Francescon.
Sensor Wafer: Final Layout
Results from the first diode irradiation and status of bonding tests
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
Production of 3D silicon pixel sensors at FBK for the ATLAS IBL
SCUBA-2 Detector Technology Development
Design and fabrication of Endcap prototype sensors (petalet)
Vladimir Cindro, RD50 Workshop, Prague, June 26-28, 2006
BONDING The construction of any complicated mechanical device requires not only the machining of individual components but also the assembly of components.
CCE/CV measurements with irradiated p-type MCz diodes
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
Presentation transcript:

P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci

P. Riedler- GGT Meeting 3/4/20062 Outlook Status of sensor irradiation Next steps Status of processed IRST wafers Short overview of process steps in bump bonding Thinning options to reduce material budget - possible problems

P. Riedler- GGT Meeting 3/4/20063 First Irradiated Samples 6 Diodes from 2 IRST sensor wafers (200µm) Diced at IRST PCBs provided by M. Glaser Transport boxes built by A. Gonidec Diodes mounted and bonded by I. Macgill

P. Riedler- GGT Meeting 3/4/20064 T B Slide by C. Piemonte, A. Pozza, M. Boscardin/IRST

P. Riedler- GGT Meeting 3/4/20065 Diodes Diodes A (7 mm x 7 mm, multi-guard) Diodes B (3 mm x 3 mm, multi-guard) A1: wafer 570-T A2: wafer 566-B B1: wafer 570-T, 4 multi B2: wafer 570-T, 12 multi B3: wafer 566-B, 4 multi B4: wafer 566-B, 12 multi

P. Riedler- GGT Meeting 3/4/20066 Pre-Irradiation Tests I-V and C-V measured in RD50 lab at CERN Total leakage current at 23.7°C C-V indicate V fd ~15V One diode (B1) with higher current (~4µA)

P. Riedler- GGT Meeting 3/4/20067 Irradiaton in Ljubljana TRIGA reactor, 250kW, irradiation with fast neutrons Samples are irradiated in a tube placed in the reactor core occupying the position of one rod Samples transported by M. Glaser, irradiation done by I. Mandic/JSI Ljubljana - end December 2005

P. Riedler- GGT Meeting 3/4/20068 Irradiation in Ljubljana All diodes biased at 30V during irradiation Guard and pad contact connected together Immediately after irradiation stored in freezer (-20°C) Irraditiation to different fluences: 2E14 1MeV n/cm 2 : A1, B1 3E13 1MeV n/cm 2 : A2 1E13 1MeV n/cm 2 : B4 2E12 1MeV n/cm 2 : B3 1E12 1MeV n/cm 2 : B2

P. Riedler- GGT Meeting 3/4/20069 Fluences in the GGT Fluences: 1 MeV n equivalent cm 2 Added safety factor of 2 A1,B1 A2 B4 B3 B2

P. Riedler- GGT Meeting 3/4/ Annealing Diodes were returned to CERN beginning of February Measurements to be carried out using CERN setup Apart from 8 hour car transport, diodes were stored at -20°C at all time after irradiation to slow down annealing Annealing study according to ROSE standards with I- V and C-V measurements planned in the next weeks Operating temperature assumed to be approx. 5°C (to be discussed)

P. Riedler- GGT Meeting 3/4/ Further Irradiations More irradiations can be carried out using the T7 facility at CERN Alternatives: Ljubljana, Helsinki Few diodes still available from two diced wafers More diodes will become available from processed wafers in short time

P. Riedler- GGT Meeting 3/4/ Bump Bonding and Thinning

P. Riedler- GGT Meeting 3/4/ Status of IRST Wafers at VTT Wafers 565 and 571 sent to VTT for processing (autumn 2005) Both wafers showed strong bow (~60-70µm) - potential problem for bb processing (max. 30 µm) Visual inspection showed excellent quality Both IRST wafers were broken in the photo-resist track at VTT Probably the bow of the wafers and tight limits in the centering stage caused the breaking of the wafers. The limit settings have been changed and tested with blank 4” wafers New reworked wafers with smaller bow already arrived at VTT and will be processed this week

P. Riedler- GGT Meeting 3/4/ Status of IRST Wafers at VTT In week 8 a fire occurred in the VTT cleanroom which affected some processing steps For sensor wafers i.e. the electroplating step (Ni and Pb-Sn deposition) and the reflow oven were affected Equipment needed to be moved to second cleanroom, cleaned and inspected No wafer processing possible until this week

Process Steps for Flip Chip in M1 M1 Sputtering of Ti-W/Cu Field Metal Photolithography Electroplating (Ni/Pb-Sn) Field Metal Etching Post-plating Reflow (Optional) Back Grinding (Optional) CMP Polishing Dicing Flip Chip (Tack) Bonding Assembly Reflow M1 M1 = 'Old' Side of Clean Room J. Salonen/VTT Only r.o. wafers

P. Riedler- GGT Meeting 3/4/ Thinning Goal: thin readout chips to 100µm or less to reduce material budget (no margin for sensor wafers due to signal!) First thinning tests carried out before VTT fire One blank 200µm wafer thinned successfully to 100µm Next tests (as soon as CMP is back up): thin bumped 200µm wafer to 100µm and dice Discussion with VTT end of March concerning thinning - several points of concern were discussed and tests planned

P. Riedler- GGT Meeting 3/4/ Considerations Concerning Thinning Two options: bump deposition before thinning (ALICE) or after thinning Problem: wafers after thinning are very fragile - might not survive bumping process unless a support wafer is attached to it (wafer bonding) If bumping is done before thinning one critical step remains: removal of the protection tape used during grinding

P. Riedler- GGT Meeting 3/4/ Tests are necessary to test which process order is best Wafer bonding experience exists at VTT New lamination tape being investigated Further consideration: stress on thin wafers Considerations Concerning Thinning

P. Riedler- GGT Meeting 3/4/ Considerations Concerning Thinning Back side grinding induces damage layer in the crystal -> stress CMP helps to remove part of this damage layer Trials necessary to optimize thinning with respect to stress on wafer (depends also on front side process) Additional suggestion: deposition of compensation layer on thinned wafer back side

P. Riedler- GGT Meeting 3/4/ Stress is also induced due to dicing of the thinned wafer (cutting of individual chips) First observations already with ALICE chips Considerations Concerning Thinning 150µm chip

P. Riedler- GGT Meeting 3/4/ Considerations Concerning Thinning Possible steps to reduce stress on chip edges: Investigate dicing parameters Backside layer deposition could present improvement Laser cutting instead of diamond blade dicing Tests required

P. Riedler- GGT Meeting 3/4/ Conclusion First diodes irradiated in Lubljana Annealing studies to be carried out in next weeks First 200 mm blank wafer thinned to 100µm Detailed studies required to optimize processing steps for thin wafers and to reduce stress Processing of the reworked sensor wafers and thinning tests will continue as soon as possible