- 0 - KPIs Weekly Report Mobily LTE Date10 /1/ 2013 ReporterCentral MS OPT Team Central _Riyadh_ Cluster 5_LTE.

Slides:



Advertisements
Similar presentations
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Post Launch Tuning Cingular UMTS.
Advertisements

© 2005 AT&T, All Rights Reserved. 11 July 2005 AT&T Enhanced VPN Services Performance Reporting and Web Tools Presenter : Sam Levine x111.
NEW ICAO WEB SITE Make a selection by clicking on one of the buttons below.
Matt’s Schedule. Headway Variation Estimated Load vs. Passenger Movement.
RetainAbility/SARR(Session abnormal release rate) :-
Mpcs la lte ho parameters trial
Chapter 6 Section 1 Introduction. Probability of an Event The probability of an event is a number that expresses the long run likelihood that an event.
Summation Notation. Terminology k –index of summation 1- lower limit n-upper limit.
Diffusion Mechanisms for Active Queue Management Department of Electrical and Computer Engineering University of Delaware Aug 19th / 2004 Rafael Nunez.
Diffusion Early Marking Department of Electrical and Computer Engineering University of Delaware May / 2004 Rafael Nunez Gonzalo Arce.
Network-assisted resource management for wireless data networks Xiaoxin Qiu Kapli Chawla Justin C.-I. Chuang Nelson Sollenberger July, 2001 IEEE Journal.
3/ EN/LZU Rev A WCDMA Air Interface Part 3: 1 of 22 WCDMA Air Interface Training Part 3 CDMA Capacity Considerations.
Orlando Fire Department Risk Assessment. Orlando Fire Department Risk Assessment.
1© Nokia Siemens Networks Confidential Realities of LTE Deployment Bill Payne Head of Innovation Team CTO Office.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POST LAUNCH TUNING.
1  Services Overview  Implementation plan (capacity overview)  Summary of completed project Site Design Services.
Message Boosting Level of BR Channel Slides in support of the Proposed Text for Message Boosting Level of BR Channel in IEEE m IEEE Presentation.
Maximum Value.
STI Proprietary1 St. Louis, MO September 21 st, 2004 AmpLink Rx 1900e GSM Field Trial.
Global Sun Project Freehold Middle School Miss Hewish’s 5 and 6 period classes.
June 11, 2002 Abilene Route Quality Control Initiative Aaron D. Britt Guy Almes Route Optimization.
PRG 420 Week 2 Learning Team Quality Control Sheet To purchase this material click below link Week-2-Learning-Team-Quality-Control-Sheet.
WEB 237 Week 2 Learning Team Planning, Brainstorming and Outlining Identify the competition, challenges and recommended process to create an eCommerce.
HIS 112 Week 1 Summary (a) What new insights did you gain? (b) Any new and useful information? (c) How do these new insights help you better understand.
HIS 112 Week 2 Summary (a) What new insights did you gain? (b) Any new and useful information? (c) How do these new insights help you better understand.
HIS 112 Week 3 Summary (a) What new insights did you gain? (b) Any new and useful information? (c) How do these new insights help you better understand.
HIS 112 Week 4 Summary (a) What new insights did you gain? (b) Any new and useful information? (c) How do these new insights help you better understand.
HIS 112 Week 5 Summary (a) What new insights did you gain? (b) Any new and useful information? (c) How do these new insights help you better understand.
DAS Impact on LTE Network and UE IBTUF VIII Austin TX, Jan-2014
Guide of Genex Assistant for LTE
Celcom Golden cluster Post Drive test peak result
Nominal Plan For PC_SBE_05
Nominal Plan For PC_SBE_10
Project hammer T00278 LTE DT Analysis Celcom CA Project
What is Actix Spotlight ?
Project hammer d00346 Sub Cluster CA - SSO Celcom CA Project
Sapphire Incident with Roots and VeriSign GTLDs
NEW ICAO WEB SITE Make a selection by clicking on one of the buttons below.
Project hammer Cluster C00200 CA - SSO Celcom CA Project
Project hammer d00219 Sub Cluster CA - SSO Celcom CA Project
4G_CA project_OSS Justification
CLUSTER CILEDUK CIPONDOH 1A
Drive Testing Basics 2013 March
PROJECT BAU MODERNIZATION
Shenzhen Metro Digital Train Introduction
Project hammer PC_CA_SWE_07 CA Celcom CA Project
SSA Improvement LTE Central Java.
TECHjOSH.COM TechJosh.com.
IEEE transactions on information technology in biomedicine 2010
Optimize your website using ASP.NET and IIS8
FAIL 0% score 20 voters STUDENT IDEA:
Philadelphia CL01 Initial Cluster Report
F STUDENT IDEA: Better Doors at the Queen's Building
2:1 65% score 28 voters STUDENT IDEA:
MEGA MATHS! Name:____________________ Date:______________
2:1 64% score 29 voters STUDENT IDEA:
FAIL 0% score 19 voters STUDENT IDEA:
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
Do Now Take 3 minutes and jot down a time that you forgot about an important event or task? What could you have done to help you remember? **Be Prepared.
STUDENT IDEA: The University should create more study space in the library F 35 SCORING FOR IDEA New template includes rating formulae – voters, average.
FAIL 0% score 20 voters STUDENT IDEA:
FAIL 0% score 23 voters STUDENT IDEA:
Capacity/Quality Improvement Project
FAIL 0% score 20 voters STUDENT IDEA:
FAIL 0% score 20 voters STUDENT IDEA:
F STUDENT IDEA: Puppy/kitten room SCORING FOR IDEA
FAIL 0% score 22 voters STUDENT IDEA:
FAIL 0% score 14 voters STUDENT IDEA:
Presentation transcript:

- 0 - KPIs Weekly Report Mobily LTE Date10 /1/ 2013 ReporterCentral MS OPT Team Central _Riyadh_ Cluster 5_LTE

- 1 - Location of CLUSTER #5 Riyadh CL # 5

- 2 - Sites of CLUSTER #5 Site ID CoordinationAzimuthTiltPCI LatitudeLongitudeAlphaBetaGammaAlphaBetaGammaAlphaBetaGamma ° ° ° ° ° ° ° ° Access Problem Access Problem Access Problem Access Problem ° ° EEE ° ° ° ° EEE ° ° EEE210

- 3 - Traffic Calculator

- 4 - Summary of Test

- 5 - Summary of H.O Test 6/6  Hand off for first sector Site 139/B Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 139/A Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 139/G Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50

- 6 - Summary of H.O Test 1/7  Hand off for first sector Site 188/A Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 188/G Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 188/B Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50

- 7 - Summary of H.O Test 2/7  Hand off for first sector Site 189/B Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 189/A Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 189/G Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50

- 8 - Summary of H.O Test 3/7  Hand off for first sector Site 1021/A Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1021/G Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1021/B Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 52

- 9 - Summary of H.O Test 4/7  Hand off for first sector Site 1387/A Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1387/G Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1387/B Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50

Summary of H.O Test 5/7  Hand off for first sector Site 1424/B Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1424/A Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1424/G Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50

Summary of H.O Test 6/7  Hand off for first sector Site 1535/A Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1535/G Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1535/B Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50

Summary of H.O Test 7/7  Hand off for first sector Site 1564/B Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1564/A Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50 Site 1564/G Lat Long TimeNo. of HO Minute 10 Minute 20 Minute 30 Minute 40 Minute 50

Average Sector Level Throughput Samsung RF Engineering & Optimization13 site 188_B SINRDL MbpsUL Mbps Point Point Point Total

Average Terminal Throughput Samsung RF Engineering & Optimization14 site 188_B SINRDL MbpsUL Mbps Point Point Point Average

RSRP LEGEND RSRP[dBm] -78 ≤ X-88 ≤ X < ≤ X < ≤ X < ≤ X < -108X < Global Coverage Probability

SINR LEGEND SINR [dB] 25 ≤ X15 ≤ X < 2510 ≤ X < 152 ≤ X < 10-3 ≤ X < 2X < Global Coverage Probability

PCI Legend 1. Global Coverage Probability

Summary of Problem  Problem Summary NoSite informationProblem Express Area I Between 1564, 1806, 1020, 139, 671, 102 1, 1424, 100, 1387, 188, 189, 1535, 118, 8 07 And 624 RASs 31 Timeout 290 Traffic fail 283 Drop Area II Between 143, 1256, 1102, 1113 And 338 RASs 8 Timeout 32 Drop 16 Traffic fail

Problematic Areas Area II Area I

Area I Problem Events

Problematic Area I: RSRP  * note: most of the sites in part one are congested.  * to enhance the coverage we would recommend the following:  Site 188: B tilt 8  6

Problematic Area I: SINR

Problematic Area I: PCI

Area II Problem Events

Problematic Area II: RSRP  For more enhancements we recommend the below: 1.Site 1102 _G : Tilt 4  3

Problematic Area II: SINR

Problematic Area II: PCI

Excel Sheets

Thank you Samsung Managed Service for Mobily LTE