1 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 EMBRACE Deliverable Status overview G.W. Kant ASTRON, The Netherlands.

Slides:



Advertisements
Similar presentations
ERA-NET 1 REPORTING REQUIREMENTS. ERA-NET 2 Contract The contract for an ERA-NET is a contractual link of all participants with the Commission defines.
Advertisements

SKADSMTAvA A. van Ardenne SKADS Coördinator ASTRON, P.O. Box 2, 7990 AA Dwingeloo The Netherlands SKADS; The.
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Oct-2012 – Aug-2014 Budget Status (*) Tempus IDEA– 3’rd Year Budget Planning Travel cost Mobility WP4 is still an on going activity Next mobility program.
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
Workpackage 0 (WP0): Management of project
Name1 title 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Progress in Active Antenna Design and Developement - FIDA3 Timothy Finn FG-IGN
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Steve Torchinsky SKADS Science Overview Lisbon 2007 Jan 12 SKADS Science Overview.
SKADS1WorkshopAvA Coordinators report First SKADS Workshop Paris 04 September 2006 Arnold van Ardenne SKADS Coordinator SKADS Project Office ASTRON,
Travel Website Enhancement Project Project Update First Name Last Name.
Eloy de Lera Acedo 2 nd SKADS Workshop October 2007 DS4T4 Differential Dual Polarized Antenna Array Design - Eloy de Lera Acedo - Research Associate.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
Philippe Picard1 System Design 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Aperture Arrays system design Front end RF combining: an efficient way to.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
TextMonTuesWedThursFriSatSun Text example GANTT CHARTS Example text Text.
André van Es 2 nd SKADS Workshop October 2007 Review on Deliverables and forward look André van Es.
Andrew Faulkner1 SKADS and SKA 4 th SKADS Workshop, Lisbon SKADS and SKA Andrew Faulkner.
Project Status Report Presenter Name Presentation Date.
3rd September 2006SKADS Workshop 2006Mike Garrett 1 DS2 - Science & Data Simulations Mike Garrett (JIVE)
Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October.
APEC-TEL Broadband Study TEL03/2009A – status report Bangkok, May 20 th.
1 WE-Mentor preparatory meeting Stuttgart 12/2006 WE-Mentor Enterprising women in European Research mentoring India/Israel/Romania/Turkey WP5 - Dissemination.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?
WP5 Impact for Space exploration Progress report for 2n d year LPI, KUL, SRC PAS, NOVELTIS, ROB Sergey Kuzin (LPI)
Peter Wilkinson1 Conclusions 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS aims to –Demonstrate SKA Scientific Viability and Readiness –Demonstrate.
P.O. Box AL Maastricht The Netherlands RIKSDeSurvey AGM2 - Vasto, Italy, 4-7 April 2006 DeSurvey Module 1.8 ‘Integration towards a.
S.A. Torchinsky SKADS Workshop 10 October 2007 Simulations: The Loop from Science to Engineering and back S.A. Torchinsky SKADS Project Scientist.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
SKA Interface Workshop: AIV Interfaces – Summary and Wrap AIV consortium Manchester June 2013.
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
DIRAC Phase 1 Reporting, Dec. 1 st, 2005 Reporting to the Commission Periodic Reports Interim Activity Reports Project Deliverables Final Reports.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) SKA AA-Mid Progress Meeting Johan.
CS-EE 480 Fall October, 2004 University of Portland School of Engineering Project Nutria Web-based Class Forecaster Team Joe Barhoum Brady Prigg.
A.O. Henrik Olofsson1 EMBRACE Solar Scans 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Sun observations with prototype tile Test carried out at ASTRON.
Philippe Picard 2 nd SKADS Workshop October 2007 Station Processing Philippe Picard Observatoire de Paris Meudon, 11th October 2007.
Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.
© 2006 IBM Corporation Jan Blommaart, IBM Netherlands. June 2006 The LOFAR Experience and its relevance to future radio astronomy projects Next Generation.
Nexus deliverable 4.6. Final report on Balkan Food Platform and recommendations for future integration of WBC/EECA countries (deliverable structure, contributions,
Year 1 Progress Report & Cost Statements submitted to EC - 17 March 2004  Receipt acknowledged by EC but no other feedback  24% of total €1.8m budget.
WP2 – Definition of European DCA strategy EuroVO-DCA Final Review, 29 April 2009 Françoise Genova, Coordinator, WP2 lead WP2 Definition of European Data.
Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris 2-PAD Infrastructure Georgina Harris SKADS System Design and Team Leader.
Turtle Creek Apartment Project Update Able Construction September 15, 1999.
Dr Danielle Kettle1 LNA progress 4 th SKADS Workshop, Lisbon, 2-3 October 2008 LNA progress.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
ASTERICS Kick-off meeting 26 May Collaboration Coordination Celebration Rob van der Meer, ASTRON, ASTERICS Project manager.
WP2 and WP5 work in progress Tallinn - September
T5: Safety & Radioprotection MB meeting, 7-8 July 2008, Lisbon, PortugalContact: Task 5: Participants and work plan Participants:role 1.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
Tm&i 2010 V.1 technology management & innovation introduction to project management (i) project definition & scope.
UNISEC Universal Influenza Vaccines Secured
Assignment 1: Defining a project and its scope.
Coordinator’s overview
EXPReS Annual Review April 17
Milestones & Deliverables BENE III period Jan 06 - Jun07
SKADS Controller’s Meeting Timeline Annual Financial Report
Jan-Geralt Bij de Vaate
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Common Implementation Strategy for the
State-Supported Passenger Rail Corridor Profiles
General Assembly Meeting
ESSnet #2 Implementing Services 13 December Luxembourg
ESSnet #2 Implementing Services 14 December Luxembourg
ASTRON EMBRACE Project status G.W. Kant.
Add a Slide Title - 1 Tasks Month 1 Tasks Month
Presentation transcript:

1 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 EMBRACE Deliverable Status overview G.W. Kant ASTRON, The Netherlands

2 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Deliverabl e/ Milestone No Deliverable/Milesto ne Name Workpacka ge/Subt ask No Lead Contractor( s) Planned (in months) Achieved (in months) DS5-1Completion of system requirements DS5-T1166 DS5-2Design review of first tile DS5-T11811 DS5-3Delivery of first manufactured tile DS5-T DS5-4Completion of 10 tile system DS5-T DS5-5Completion of first 100 tiles DS5-T2135(41) DS5-6Completion of all remaining tiles DS5-T2142(45) DS5 top level deliverables

3 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Deliverable / Milestone No Deliverable/Milestone Name Workpacka ge/Subtask No Lead Contractor(s ) Planned (in months) Achieved (in months) DS5.T1.1System Design and Test reports on first tile DS5-T DS5.T1.2Final Design and Test Report on 10 tile system results DS5-T1123(40) DS5.T2.1Delivery of first 100 tiles to Westerbork and Nancay DS5-T2135(42) DS5.T2.2Manufacturing report and Test report of complete stations at Westerbork and Nancay DS5-T2/T31,546(46) DS5 top level deliverables

4 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Deliverabl e/ Milestone No Deliverable/Milesto ne Name Workpacka ge/Subtask No Lead Contractor( s) Planned (in months) Achieved (in months) DS5.T3.1Final report with conclusions and recommendations for the SKA technology review DS5- T1/T2/T3 1,548(48) DS5 top level deliverables

5 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Task number Deliver able No Deliverable Name Workpac kage /SubTask No Delivered by Contract or(s) Planned (in months) Achieved (in months) T11Design of the first tile finished WP1188 T12Design ten tile system finished WP T13System requirements frozen WP T14Design final station finished WP1130 DS5 T1 deliverables

6 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Task number Deliver able No Deliverable Name Workpac kage /SubTask No Delivered by Contract or(s) Planned (in months) Achieved (in months) T21Manufacture and integration of the first tile WP1112 T22Manufacture and integrate a 10 tile system WP1/WP DS5 T2 deliverables

7 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Task number Deliver able No Deliverable Name Workpac kage /SubTask No Delivered by Contract or(s) Planned (in months) Achieved (in months) T23Manufacture and integrate first 100 tiles of the final station WP1/WP 3 135(40) T24Finalize production and integration of the final station at Westerbork and Nancay WP1/WP 3 1,541(45) DS5 T2 deliverables

8 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Task number Deliver able No Deliverable Name Workpac kage /SubTask No Delivered by Contract or(s) Planned (in months) Achieved (in months) DS5-T31Engineering Testplan WP1ASTRON28Not yet delivered (see text) DS5-T32Astronomical Testplan WP1OPAR32 DS5-T33Initial Engineering Test Report WP1ASTRON45Not due DS5-T34Final Engineering and Astronomical Test Report WP1OPAR48Not due DS5 T3 deliverables