CER Update Industry Governance Group 21 st September 2011.

Slides:



Advertisements
Similar presentations
Retail Market Assurance Services for the Irish Electricity Market Anna Anderson Loughlin IGG 26 th August 2010
Advertisements

The Role of Smart Meters in Tackling Fuel Poverty Cathy Mannion, Director, Retail & Electricity Networks Commission for Energy Regulation Energy Action.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
Fiona Hannon Energy Action Fuel Poverty Conference 2014
Summary of Customer Service Rules for Low-Income Electricity Customers Paul Gasparatto Policy Advisor.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Copyright Big Energy Saving Network 2013 Session objectives To explain:  payment and tariff options  fuel bills and the annual statement  how to switch.
Transposition of Consumer Rights ERGEG Monitoring Report Christina Veigl-Guthann, ERGEG Task Force Chair.
© Bord Gáis Energy Delivering on fuel affordability Mark Prentice, Head of Retail.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS CUSTOMER INFORMATION LIST.
Cashier Functions. Cashiers’ Key Ingredients I. Customer Service to students and staff II. Process payments III. Process payment arrangements IV. Process.
Energy Action Fuel Poverty Conference Smart Meters - Tariff Benefits for Fuel Poor Choosing the Right Supplier Cathy Mannion 6 th October 2014.
The Impact of Economic Regulation Cathy Mannion Director Water Commission for Energy Regulation Local Authority Services National Training Group Conference.
Choosing the right deal for you Dual fuel Getting your gas and electricity from the same supplier Many suppliers offer a discount if you opt for dual fuel.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Restructuring BUSINESS PROCESSES IN MAINE. Business Transactions Contracts Metering Usage History Enrollments & Drops Billing, Collections & Payments.
Green Energy Program Redesign Wilson Mallard – Georgia Power Company NARUC Staff Subcommittee on Accounting and Finance Fall Meeting October 13, 2008 Wilson.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – 26 th June 2008 Minutes from last IGG meeting10.00.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
NATIONAL GRID Winter Peak Demand Reduction Scheme (WPDRS) Michael Walsh ESB National Grid Sustainable Energy Ireland – LIEN Workshop Kilkenny, 22 nd July.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
1Meeting, location, date Implementation of EC Good Practice Guidance for Billing ERGEG Status Review Ulrike Zeilinger, Project Leader ERGEG Customer Empowerment.
© 2010 San Diego Gas & Electric Company. All copyright and trademark rights reserved Low Income Oversight Board Service Disconnection/Reconnection Process.
The Utility Consumer Bill of Rights Information About the Rights and Responsibilities of Utility Consumers in the District of Columbia DC Office of the.
How do I know if I need to switch supplier?. What information do I need to know before I can compare energy prices? My usage (kWh) and costs (£) for energy.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – July 19 th 2007 Minutes from last IGG meeting10.00.
Welcome to DTE Energy Customer Support Network October 2015
RMDSRMDS Retail Market Design Services 1 IGG Agenda – March 8 th 2007 Minutes from last IGG meeting10.00 – Review of Action Items10.10.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
Income Recovery at Leeds Federated Lee Welsh. LFHA follow pre action protocol guidance set by the courts Integrated in to our housing management system.
Harmonisation Working Group CER Offices, Tallaght 20 October 2009 Retail Market Harmonisation Working Group.
22 February 2012Page 1 IGG Agenda 22 nd February 2012 Minutes from Previous IGG Meeting 14:00 – 14:10 Review of Action Items 14:10 – 14:15 CER Update 14:15.
10 August 2011Page 1 IGG Agenda 10 th August 2011 Minutes from Previous IGG Meeting10:30 – 10:35 Review of Action Items10:35 – 10:45 CER Update10:45 –
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Debt Flagging for Electricity & Gas Customers – Industry Code CER, GMARG/IGG August, 2011.
Financial Hardship Provisions. Utility Consumer Protection in WA.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
Commodity Standing Group (COMSG). IRegulatory background Current lighter touch regime for UK commodity firms not undertaking ISD Investment Business MiFID.
21 September 2011Page 1 IGG Agenda 21st September 2011 Minutes from Previous IGG Meeting 14:00 – 14:10 Review of Action Items 14:10 – 14:15 CER Update.
IGG Agenda 2nd November 2011 Minutes from Previous IGG Meeting
Industry Governance Group 2nd November 2011
IGG Agenda – April 19th 2007 Minutes from last IGG meeting – 10.10
Harmonisation Working Group
Retail Market Assurance Services for the Irish Electricity Market
Industry Governance Group 12th June 2013
Electricity & Gas Meters Supported Meter Types Domestic Credit – Direct Debit and Pay on Receipt of Bill (payment methods). Domestic Pre Payment –
ESB Networks AIP Programme
Industry Governance Group 28th May 2009
Industry Governance Group 20th August 2009
Gerry Halligan 14 January 2015
PEER Regulatory Round Table on Bundled Products 2nd October 2017 Insights from the PEER event, Cases & Next Steps.
IGG Agenda 1st October 2009 Minutes from Previous IGG Meeting
Industry Governance Group 5th March 2009
Industry Governance Group 18th November 2010
IGG Agenda – 18th September 2008
IGG Agenda – 30th October 2008 Minutes from last IGG meeting
Xoserve IX Refresh Customer Update 30/10/2018.
MRSO Update James Long MRSO.
IGG Agenda 29th June 2011 Minutes from Previous IGG Meeting
Harmonisation Working Group
Gerry Halligan 10 September 2014
ESB Networks AIP Programme Meeting of the IGG, November 1st 2006
Industry Governance Group 14th August 2013
Industry Governance Group 11th December 2008
Smart Meter Update Oregon Public Utility Commission
Industry Governance Group 11th January 2012
Presentation transcript:

CER Update Industry Governance Group 21 st September 2011

Publications Customer ProtectionConsultationDecision Prepayment Metering in the Electricity and Gas Markets (CER/166) Electricity and Natural Gas Supplier Handbook (CER/11/168) Demand SideConsultationDecision Proposed Changes to the Winter Peak Demand Reduction Scheme and Powersave Scheme 2011/12 (CER/11/165) Market Information – Regular Reports ww.cer.ie – elec retail - reports & publications Change of Supplier weekly update Electricity and Gas Customer Disconnections Report July – August 2011

Work streams Working Groups Prepayment Meter Project Supplier Group Forthcoming consultations Market Monitoring Licence Review Smart meteringTimelines Gas trial & Cost Benefit Assessment (CBA)September Consultation on Smart Metering national rollout design & implementation October Decision on Smart Metering national rollout design & implementation November/December

Debt Flagging for Electricity & Gas Customers – Industry Code

Industry Code - Drafting Drafting – Input from –Electricity & Gas Market Participants –Office of the Data Protection Commission (ODPC) August GMARG/IGG – High Level Aspects Draft Code – pre Commission approval circulated to Industry & ODPC Commission approval – Re-circulated Main points presented today

1. Grounds to Raise a Flag (I) As per decision; From when amount fell due, not bill issued, this typically 14 days from bill issued. Customer Category Debt Value & Duration Threshold Domestic> €250 for > 60 days from due Small BusinessElec (LV-NonMD/DG5) Gas (NDM <73MWh) > €750 for > 60 days from due - TBC Medium BusinessElec (LVMD/DG6) Gas (NDM >73MWh) > €1,500 for > 60 days from due - TBC

Outstanding deposits excluded Cannot raise a Flag where customer pursuing complaint re monies owed Must adhere to Industry thresholds & timings Must issue a flag where relevant criterion per customer category has been satisfied. 1. Grounds to Raise a Flag (II)

Change of Legal Entity (All Customers) –Cannot flag new tenant CoS where debt accumulated by previous tenant –Elec: CoLE signalled on 110 message Losing supplier cannot raise flag Inferred CoLE – flag not forwarded to new supplier –Gas: CoLE not signalled → Options Discussed at August GMARG ODPC Advice New supplier ascertain whether new tenant & not yet signed up – if site flagged – flag ignored. 1. Grounds to Raise a Flag (III)

2. Timings Old supplier to raise flag: –Elec: Lists submitted to MRSO by COB on Mondays & Wednesday –Gas: Within 2 business days New supplier to decide action –Elec: Within 2 business days –Gas: Within 3 business days

3. Customer Communication (I) Communication Re Flagging Process –ODPC Advice: Domestic Sign Up Process –Customer must be made of aware of debt flagging at sign up –Notice must be included on domestic customer application forms – online, paper, phone –Terms & Conditions only not sufficient –Tick Box – read & understood notice –Standard wording, otherwise ODPC sign off

3. Customer Communication (II) Communication Re CoS Cancellation Within 5 business days; Gaining supplier issue notification in writing: –CoS request cancelled & why –Advise customer contact current supplier –contact details for MABS or an appropriate alternative, in the case of domestic customers - TBC.

4. Dual Fuel Dual Fuel – Losing Supplier –Can only flag account which meets the industry debt flagging criterion Dual Fuel – Gaining Supplier –Where 1 account is flagged and not the other: –Supplier can only proceed with CoS for non- flagged account only if obtained customer agreement to switch for one fuel and not dual fuel –If no agreement obtained, proceed or cancel CoS requests for both accounts

6. Reporting CER monitoring debt flagging process On monthly basis, receive from DSOs –# CoS requests flagged by losing supplier –# CoS cancellations following flag –Elec Market Only – # CoS requests with CoLE # Debt flags not forwarded to gaining supplier by MRSO due to inferred CoLE CER conduct spot checks from time to time

PPM in Electricity & Gas Markets

Consultation - Background Current Economic Climate –CER/10/217 Disconnection CoP Guidelines –Keep disconnection to a minimum: Customer must be offered a PPM before a Supplier can request a disconnection –CER/11/106 Debt Flagging Decision –Losing Supplier can flag to gaining supplier where customer debt above industry thresholds Suppliers concern over compatibility of CER/10/217 & CER/11/106

Consultation - Options PPM Customer Repaying Debt – 2 Options: Option A – Status Quo –Customer ceases paying debt when changes supplier - supplier pursues customer for outstanding debt separately Option B – Debt Travels –Customer must continue to pay off outstanding arrears after they switch supplier

Consultation – Next Steps Responses due 15 th September Decision Paper issued asap.