1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding 2005-2009 DESY and the ILC Funding from the European Union KEK/DESY Collaboration.

Slides:



Advertisements
Similar presentations
Research and Innovation Research and Innovation Enabling & Industrial Technologies in Horizon 2020 Enabling & Industrial Technologies in Horizon 2020 Research.
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
1 Thomas Naumann ACAT Research at DESY Th. Naumann.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
DESY. Status and Future Developments Albrecht Wagner Plenary ECFA 28 November 2008 CERN.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
1 Albrecht Wagner, EPP2010, 16 May 2005, Chicago ILC - International Cooperation and Coordination The Point of view of DESY and Germany Albrecht Wagner,
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
European GDE Meeting – Oxford, October 25th /13 European GDE Communication: Future Plans European GDE Communication: Future Plans Perrine Royole-Degieux.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
1 ECFA/DESY Workshop, Prague, Status of the TESLA Proposal R-D Heuer, Univ. Hamburg and: International Detector R&D.
The ILC and DESY 5th Workshop on Scientific Cooperation JINR, Dubna January 2005 R.-D. Heuer, DESY and Hamburg Univ.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
1 Albrecht Wagner, Sep 06 Sino-German Workshop Frontiers in QCD September 2006 at DESY Albrecht Wagner.
1 Albrecht Wagner DESY - Overview Mission: Development, construction and running of accelerators Exploit the accelerators for particle physics and research.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
1 Albrecht Wagner, EPS Aachen, 19 July 2003 Road Map for High Energy Physics The DESY View The strategy for the DESY programme is based on three elements:
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
Operations, Test facilities, CF&S Tom Himel SLAC.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Status of the Project April EPOG, 12th Outreach-Meeting, CERN, Petra Folkerts, DESY 1 Report from DESY, Hamburg, Germany The Status of TESLA and.
The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY Report from DESY, Hamburg, Germany.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
China July 2004 The European Union Programmes for EU-China Cooperation in ICT.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
DESY Deutsches Electron Synchrotron Shima Bayesteh.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
DESY. Deutsches Elektronensynchrotron Introduction of DESY and MKK group Jens-Peter Jensen Asset and Maintenance Management Workshop 2013 Genf,
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
TESLA Linear Collider project overview and linac technology R. Brinkmann, DESY ITRP Meeting, RAL Jan. 28, 2004.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
General Introduction Markus Nordberg (CERN DG-DI-DI) 1
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
25 October 2004O. Napoly, EU-GDE meeting in Oxford 1 French Funding Agencies CNRS/IN2P3 : National research Institute on Nuclear Physics and Particle Physics.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
DESY / XFEL – Tunnel layout, transport and handling solutions
MSc-Student Activities at the European XFEL
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Ways to industry participation in CLIC 24th October, 2017
ESS RF Development at Uppsala University
News from DESY. Joachim Mnich KET Jahresversammlung Bad Honnef
Accelerator Layout and Parameters
Status of the TESLA Proposal
Nick Walker (DESY) EU GDE Meeting Oxford
Olivier Napoly, coordinator CEA/Irfu
Presentation transcript:

1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration DESY, 7 March 2005

2 Albrecht Wagner Deutsches Elektronen-Synchrotron Member of the Helmholtz Association Mission: Development, construction, operation and scientific exploitation of accelerators Provide access for national and international users Internationally used, nationally funded Research Institute Budget: 165 MEuro (2002) Staff:1560 in Hamburg and Zeuthen Users:3000 (1500 from abroad) Accelerator development Photon Research SR & FEL Exp. & Theor. Particle Physics

3 Albrecht Wagner Main Elements of Future of DESY Particle Physics –HERA until June 2006 –ILC –During transition participation in external experiment Photon Science –DORIS –VUV-FEL –PETRA III –XFEL

4 Albrecht Wagner Budget: Request and Allocation Request ( blue ) Allocation ( violet ) Base budget, without funding for new projects (PETRA, XFEL …) Base budget has three parts: Research Facilities General infrastructure (~35%)

5 Albrecht Wagner Particle Physics ResearchFacilities (accelerators, experiments)

6 Albrecht Wagner Photons ResearchFacilities (accelerators, experiments)

7 Albrecht Wagner VUV-FEL Program for 2005 The 2005 operation time is divided in different blocks. Under the assumption of no unexpected shut downs, all requests can be full-filled. Some reserve is within the individual operation periods.

8 Albrecht Wagner European XFEL German government in Feb gave go-ahead for XFEL as European project, incl. funding 50% of total 684 M€ (year 2000) project cost, + contribution from Länder HH & Schleswig- Holstein. ~ 40% required from European Partners. Project currently being organised at European Level (scientific/tech. & admin./financial) ongoing - to be completed by Until Jan 2005, 10 European countries have signed the MoU for the project preparation phase (CH, D, DK, ES, F, GR, I, PL, UK, S) Discussions in Russia, Netherlands, Hungary, China Goal: –Until mid 2006 finish all preparations for an agreement on Government level for construction and operation of EU XFEL –Start of operation in 2012

9 Albrecht Wagner ILC XFEL Synergy Qualification of vendors (EU, US and J) Industrial studies & prototypes for klystron/tunnel installation Involve industry in string & module assembly: 3 industrial studies Industrial studies for RF coupler fabrication (IN2P3/Orsay) Improvement of tuner design ( CEA/Saclay) Further experience with EP treatment, improve statistics for cavities Build up module test stand (1st test candidate will be Module#6 with 35MV/m cavities) Further Synergy by operating VUV-FEL, XFEL commissioning etc

10 Albrecht Wagner accelerator modules module test / magnets / cryogenics linac components (injector, bunch compressors, diagnostics, dumps) Photons FEL concepts Controls / Operability Infrastructure (site, civil construction, survey, tunnel layout, utilities) Safety Organisation Synergy LC and XFEL Note synergy!

11 Albrecht Wagner European Design Study (27 institutions, including CERN and DESY) With top marks (score: 4.8/5), EU funding: ~9 M€ Kick-off meeting EU: Stefano Fontana Structured and integrated European area in the field of accelerator research and related R&D. Funds SC RF development. European Funding for ILC R&D

12 Albrecht Wagner EU and the Global ILC Project The evaluators of the ILC design study EUROTeV emphasised the importance of the project EUROTeV plays the role of a focus and nucleus for the European part of the global activities which are just starting Europe must maintain its leading role in the SC RF technology Global projects represent a new challenge for European science coordination The ILC is one of the possible domains for the strategic road map

13 Albrecht Wagner Several major projects, such as the XFEL or the ILC, are based on the use of SC RF technology The responsibility for projects lies in the hands of the respective project organisations The mission of the TESLA collaboration is as follows: TESLA Collaboration and its relation to major construction projects

14 Albrecht Wagner The role of the collaboration is to advance SC RF technology research and development and related accelerator aspects across the broad diversity of scientific applications, and to keep open and provide a bridge for communication and sharing of ideas, developments, and testing across projects. To this end TTF and module test stands will continue to be used as a test bed for new developments and experiments in SRF technology, beam and light physics, and associated developments such as instrumentation and diagnostics. The collaboration will support and encourage free and open exchange of knowledge, expertise, engineering designs, and equipment. TESLA Collaboration Mission Statement

15 Albrecht Wagner Comments about KEK/DESY Collaboration DESY would very much like to strengthen the collaboration further In work on SC test facilities need to –carefully synchronise and coordinate R&D –Define precisely all interfaces to guarantee exchange of components etc. In ATF related work interested to –test of fast kicker and pulser at ATF. –To make the collaboration as efficient as possible try to do as much as possible remotely DESY and KEK have just signed an agreement on exchange of scientific personnel. We should fill the agreement with life. KEK participation in efforts related to ILC and FEL here at DESY are highly welcome.