ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

11/05/06GDR-Neutrino à Orsay (LAL)1 GDR-Neutrino (10-11 mai 2006) L. Mosca (CEA-Saclay) The MEMPHYS project (Laboratory excavation) MEgaton Mass PHYSics.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Target station and optimization studies for ESS Super Beam E. Baussan, M. Dracos, N. Vassilopoulos IPHC/CNRS.
Michel Spiro Particle Physics at the Megawatt proton source. CERN 27 May 2004 Long-range programme in neutrino physics: superbeam, β beam, neutrino factory.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
How Will We See Leptonic CP Violation? D. Casper University of California, Irvine.
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
Alain Blondel Detectors UNO (400kton Water Cherenkov) Liquid Ar TPC (~100kton)
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
17 Dec. 2008M. Dracos, EUROnu-WP21 Collector and the SPL Super-Beam Project Marcos Dracos IPHC-IN2P3/CNRS Strasbourg.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Measuring δ CP at the second ν oscillation maximum Win2015 Conference in Heidelberg 12 June 2015 Tord Ekelof, Uppsala University 1 ESSνSB
Neutrino Study Group Dec 21, 2001 Brookhaven Neutrino Super-BeamStephen Kahn Page 1 Horn and Solenoid Capture Systems for a BNL Neutrino Superbeam Steve.
T2K experiment at J-PARC Epiphany 2010D. Kiełczewska1 For T2K Collaboration Danuta Kiełczewska Warsaw University & Sołtan Institute for Nuclear Studies.
NEUTRINO PROPERTIES J.Bouchez CEA-Saclay Eurisol town meeting Orsay, 13/5/2003.
Modifications on ESS for neutrino Super Beam
Round-table: Discussion on Future Machines. With the discovery of the Higgs Boson Self-consistent model (SM) accounting for all Particle Physics phenomena.
ESSnuSB Project for Leptonic CP Violation Discovery based on the European Spallation Source Linac NOW 2014, 10/9E. Wildner, CERN 2 Elena WILDNER CERN for.
Long Baseline Experiments at Fermilab Maury Goodman.
Dec. 13, 2001Yoshihisa OBAYASHI, Neutrino and Anti-Neutrino Cross Sections and CP Phase Measurement Yoshihisa OBAYASHI (KEK-IPNS) NuInt01,
1 The JHF-Kamioka Neutrino experiment 1.Introduction 2.Overview of the experiment 3.Physics sensitivity in Phase-I 4.Physics sensitivity in Phase-II 5.Summary.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
Long Baseline Neutrino Beams and Large Detectors Nicholas P. Samios Istanbul, Turkey October 27, 2008.
If  13 is large, then what ? Hisakazu Minakata Tokyo Metropolitan University.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
1 Neutrino detector test beam requirements 0. Disclaimer 1. News from the neutrino scene 2. Beam requirements for AIDA and others.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
A lepton CP violation experiment using a neutrino Super Beam from ESS and a megaton water Cherenkov detector Tord Ekelöf Swedish HEP Strategy.
Energy Dependence and Physics Reach in regard to Beta/EC Beams J. Bernabeu U. Valencia and IFIC B. Pontecorvo School September 2007.
A monochromatic neutrino beam for  13 and  J. Bernabeu U. de Valencia and IFIC NO-VE III International Workshop on: "NEUTRINO OSCILLATIONS IN VENICE"
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
From the SPL to the 4-target-horn system: Preliminary design of a beam switching yard WP2: Super Beam 4 th EUROν Annual Meeting, Paris, June 13, 2012 E.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
ESSνSB – Far Detector and Underground Site nd ESSnuSB Meeting in Lund Tord Ekelöf Uppsala University Tord Ekelöf, Uppsala Univerisity.
Progress on Swedish sites Garpenberg Mine LAGUNA-LBNO Meeeting Paris Tord Ekelöf Uppsala University The Garpenberg Castle built 1801.
23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground.
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
ESSνSB: The ESS neutrino facility for CP violation discovery
UK Neutrino Factory Conceptual Design
IPHC-IN2P3/CNRS Strasbourg
ESS Super Beam for neutrino CP violation discovery
The Accelerator Complex from the International Design Study
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
Superbeams with SPL at CERN
Collector and the SPL Super-Beam Project
High g Li/B b-Beam Enrique Fernández-Martínez, MPI für Physik Munich
Progress towards Pulsed Multi-MW CERN Proton Drivers
A Superconducting Proton/Electron Linac
Naotoshi Okamura (YITP) NuFact05
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
A High Intensity Neutrino Oscillation Facility in Europe
The European Consortium working on the ESSνSB project
Poster session: Wednesday 6 June
The status and performance of ESSnuSB
Presentation transcript:

ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos

EUROnu Projects (beam facilities) 20 August 2013M. Dracos 2 p SPL GeV, 4 MW Target ~300 MeV   beam to far detector decay tunnel Accumulator ring Magnetic horn capture (collector) proton driver hadrons  p Proton driver Isol target & ion source DECAY RING B = 5T L=6880 m PSB EURISOL Existing at CERN New RFQ SPS PS Linac 5 GeV?, 4 MW Target Linac  2 GeV Recirculating Linacs 2  50 GeV Decay ring – 50 GeV  2000 m circumference Ionization cooling Phase rotation beam to far detector Drift Accumulator ring + bunch compressor Magnetic capture beam to near detector SPL Super-Beam Neutrino Factory Beta-Beam 6 He for e and 18 Ne for e proton driver

θ 13 is large!!! 20 August 2013M. Dracos 3 year measurements proposed facilities have to be readjusted… now, the name of the game is CPV proposed facilities have to be readjusted… now, the name of the game is CPV reactor experiments discovered the 1→3 oscillation

4 20 August 2013M. Dracos CP Violating Observables (and MH) matter effect ⇒ accessibility to mass hierarchy ⇒ long baseline Non-CP terms CP violating ≠0 ⇒ CP Violation be careful, matter effects also create asymmetry atmospheric solar interference

Neutrino Oscillations 5 20 August 2013M. Dracos P(ν μ →ν e ) L/E 1 st oscillation maximum 2 nd oscillation maximum θ 13 =1ºθ 13 =8.8º for small θ 13 1 st oscillation maximum is better for "large" θ 13 1 st oscillation maximum is dominated by atmospheric term, 2 nd oscillation maximum is better CP interference solar atmospheric θ 13 =1º θ 13 =8.8º  CP =-90  CP =0  CP =+90 (arXiv: )arXiv:

20 August 2013M. Dracos 6 SPL not any more part of LHC upgrades Any other intense proton source in Europe? (in the context of European Strategy for Particle Physics) f) Rapid progress in neutrino oscillation physics, with significant European involvement, has established a strong scientific case for a long-baseline neutrino programme exploring CP violation and the mass hierarchy in the neutrino sector. CERN should develop a neutrino programme to pave the way for a substantial European role in future long-baseline experiments. Europe should explore the possibility of major participation in leading neutrino projects in the US and Japan.

European Spallation Source 7 under construction (~1.5 B€ facility) 20 August 2013M. Dracos

ESS proton linac The ESS will be a copious source of spallation neutrons 5 MW average beam power 125 MW peak power 14 Hz repetition rate (2.86 ms pulse duration, protons) 2.5 GeV protons (up to 3.0 GeV with linac upgrades) >2x10 23 p.o.t/year 8 20 August 2013M. Dracos

ESS Schedule 9 20 August 2013M. Dracos 1 st beam before the end of the decade 5 MW by 2023

How to add a neutrino facility? We must not affect the neutron program and if possible be synergetic Linac modifications: double the rate (14 Hz → 28 Hz) Accumulator (ø 143 m) needed to compress to few μs the 2.86 ms proton pulses, affordable by the magnetic horn ( 350 kA, power consumption, Joule effect) H - source (instead of protons) space charge problems to be solved Target station (studied in EUROnu) Underground detector (studied in LAGUNA) ~300 MeV neutrinos Linac and accumulator could be the first step towards the Neutrino Factory flux at 100 km August 2013M. Dracos ( accumulator target/horn station

Neutrino Oscillations August 2013M. Dracos (2.5 GeV)

20 August 2013M. Dracos 12 The MEMPHYS Detector (Water Cherenkov) (LAGUNA) Mainly to study: Proton Decay (GUT) up to ~10 35 years lifetime Neutrino properties and Astrophysics Supernovae (burst + "relics") Solar neutrinos Atmospheric neutrinos Geoneutrinos neutrinos from accelerators (Super Beam, Beta Beam) Water Cerenkov Detector with total fiducial mass: 500 kt: 2 Cylindrical modules 100x65 m Readout: 22.2k 8” PMTs, 30% geom. cover. Water Cerenkov Detector with total fiducial mass: 500 kt: 2 Cylindrical modules 100x65 m Readout: 22.2k 8” PMTs, 30% geom. cover. (arXiv: hep-ex/ )

20 August 2013M. Dracos 13 MEMPHYS Parameters migration matricesdetection efficiency

Possible Detector Locations Many mines (active or not) are available in Sweden What is the optimal position for CPV? How this project could help for MH? p(   e ) L/E (km/GeV)  m 2 sun =7.5x10 -5 eV 2  m 2 atm =2.4x10 -3 eV 2  23 =41.4°  12 =33.6°  13 =8.8° E~290 MeV August 2013M. Dracos  CP =-90  CP =0  CP =+90

Garpenberg Mine (Boliden) August 2013M. Dracos Distance from ESS: 540 km Depth: 1232 m Truck access tunnels Two ore hoist shafts A new ore hoist shaft is planned to be ready in 3 years, leaving the two existing shafts free for other uses

Which baseline? August 2013M. Dracos

Physics Performance (Enrique Fernantez) 1 Mton WC detector (440 kton fiducial), 5%/10% syst. 3.0 GeV protons 5 MW proton beam 10 years (200 days/year) fraction without adding yet atmospheric neutrinos CPV MH Very preliminary EUROν parameters without particular optimization August 2013M. Dracos

Which baseline? August 2013M. Dracos Zinkgruvan Garpenberg Zinkgruvan is better for 2 GeV Garpenberg is better for > 2.5 GeV CPVMH Zinkgruvan is better atmospheric neutrinos are needed (at least at low energy)

Neutrino spectra August 2013M. Dracos 540 km (2 GeV) below ν τ production

Neutrino spectra August 2013M. Dracos νμ→νeνμ→νe ν μ (miss-ID)ν e (beam) ν NC νμ→νeνμ→νe T2HK ESS 540 km ESS 360 km ESS: 2 years neutrinos, 8 years anti-neutrinos, 200 days/year (almost no kaon contamination) T2HK: neutrinos: 2.25 MW x 10 7 s, anti-neutrinos: 5.25 MW x 10 7 s νμ→νeνμ→νe ν μ (miss-ID)ν e (beam) ν NC νμ→νeνμ→νe T2HK ESS 540 km ESS 360 km neutrinos anti-neutrinos ----

Statistics/Systematics August 2013M. Dracos CPV (2 GeV protons) "nominal" x0.5 x2

Physics Performance for Future SB projects (Enrique Fernantez) 22 CPVMH (unknown) LBNE: 5+5 years, 0.7 MW, 10/35 kt LAr T2HK: 3+7 years, 0.75 MW, 500 kt WC (5%/10% syst. errors) SPL: 2+8 years, 4 MW, 500 kt WC (130 km, 5%/10% syst. errors) ESS: 2+8 years, 5 MW, 500 kt WC (2 GeV, 360/540 km, 5%/10% syst. errors) C2Py: 20/100 kt LAr, 0.8 MW, 2300 km 20 August 2013M. Dracos unknown MH 360 km 540 km

Physics Performance for Future SB projects (Enrique Fernantez) August 2013M. Dracos for 2 GeV optimum km for 3.5 GeV optimum km but the variation is small

δCP accuracy performance (snowmass) August 2013M. Dracos

Conclusions 25 ESS is under construction very intense source of protons, 5 MW, 2-3 GeV more than 2x10 23 protons/year well defined schedule Modifications are needed to transform ESS to neutrino facility Double the rate Add an accumulator Add a target station Underground detector (MEMPHYS), mines available Very promising physics performance using EUROnu optimizations: CPV: coverage up to 60% MH: could reach 5 σ combining atmospheric neutrinos First ESS beam 2019, full power/energy by August 2013M. Dracos could be the first step towards the Neutrino Factory

Collaborators are welcome… (just ) August 2013M. Dracos

Backup August 2013M. Dracos

Which baseline? August 2013M. Dracos known MH 360 km 540 km

Which baseline? August 2013M. Dracos

Physics Performance for Future SB projects (Enrique Fernantez) August 2013M. Dracos

20 August 2013M. Dracos 31 Horn Optimization perfect focusing present focusing no focusing /proton/0.02GeV/m 2 GeV for 2.5 GeV

Physics Performance for Future SB projects (Enrique Fernantez) August 2013M. Dracos