Summary of Clean Air Fine Particle Implementation Rule Proposed in November 2005 EPA Office of Air Quality Planning and Standards August 17, 2006.

Slides:



Advertisements
Similar presentations
Clean Air Interstate Rule (CAIR) Reducing Regional Transport of Emissions and Helping States Achieve the PM2.5 and Ozone NAAQS Beth Murray Clean Air Markets.
Advertisements

1 Policies for Addressing PM2.5 Precursor Emissions Rich Damberg EPA Office of Air Quality Planning and Standards June 20, 2007.
Transportation Conformity and Development of Emission Budgets.
Air Quality Strategies & Standards Update Joseph Paisie Air Quality Strategies & Standards Division, Office of Air Quality Planning & Standards, EPA WESTAR.
Update: National Ambient Air Quality Standards Association of California Airports September 15, 2010 Phil DeVita.
Direct PM 2.5 Emissions Data, Testing, and Monitoring Issues Ron Myers Measurement Policy Group SPPD, OAQPS.
Final Clean Air Fine Particle Implementation Rule for the 1997 PM2.5 Standards Rich Damberg EPA Office of Air Quality Planning and Standards June 20, 2007.
Imperial County APCD Regulatory Update CDAWG 2014 Brad Poiriez Air Pollution Control Officer October 8, 2014.
How Ozone is Regulated under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
Control Measures for the 8-hour Ozone SIP Metropolitan Washington Air Quality Committee April 27, 2005.
Air Pollution Control Board October 1, 2008 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management We Protect.
Environmental Protection Division 1 AWMA Georgia Air Update August 10, 2007 Heather Abrams, Branch Chief.
1 An Update on EPA Attainment Modeling Guidance for the 8- Hour Ozone NAAQS Brian Timin EPA/OAQPS/EMAD/AQMG November 16, 2005.
A&WMA Georgia Regulatory Update Conference Current State of the Air in GA Jac Capp, GA EPD, Branch Chief, Air Protection Branch April 16, 2013.
Minnesota Air Quality and Attainment Status Frank Kohlasch Kari Palmer Statewide Travel Demand Coordinating Committee Meeting October 14, 2010.
Air Quality Planning, Metro. Washington, DC-MD-VA Joan Rohlfs, Chief, Air Quality Planning Metropolitan Washington COG October 27, 2005.
Update on EPA Oil and Gas Activities Greg Green, Outreach and Information Division, OAQPS.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
Implementation Issues for the Hour PM2.5 Standard EPA / WESTAR Residential Wood Smoke Workshop Salt Lake City, Utah March 1, 2011 Rich Damberg.
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
Overview of EPA Policy and Guidance Supporting Innovation Presented by: Lydia Wegman Director, Air Quality Strategies and Standards Division EPA’s Office.
1 EPA’s Proposed Interstate Air Quality Rule Consideration of Issues Associated with Possible Expansion of IAQR to the West Patrick Cummins, WGA Background.
Ozone Regulation under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
May 23, PM 2.5 Implementation, Proposed Revisions and Haze Air Quality Issues Workshop Allegheny Mountain Section of the Air & Waste Management Association.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Early Action Compacts Presented by Karen Borel EPA Region 4 March 25, 2003.
Preparation of Control Strategies October 18, 2007 NAAQS RIA Workshop Darryl Weatherhead, Kevin Culligan, Serpil Kayin, David Misenheimer, Larry Sorrels.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
You are here.. Kern Council of Governments PM 10 Control Measures Workshop: Identifying the Best Available Control Measures to Local Government for Mobile.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
1 PM2.5 Redesignation Request for the Metropolitan Washington,D.C. Region Joan Rohlfs Chief, Air Quality Planning Metropolitan Washington COG.
ANPR: Transition to New or Revised PM NAAQS WESTAR Business Meeting March 2006.
Fine PM Test Method Ron Myers OAQPS/SPPD/MPG 9/11/2007.
National Ambient Air Quality Standards and Current Status of Air Quality Laura Boothe North Carolina Division of Air Quality MCIC Workshops March 2012.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
National and Regional Programs to Reduce Ozone Transport Metropolitan Washington Air Quality Committee April 27, 2005.
1 Designations & Classifications for the 8-hour Ozone NAAQS U.S. EPA Office of Air Quality Planning and Standards.
Determining Attainment Dates for Different Types of Nonattainment Areas Rich Damberg EPA Office of Air Quality and Standards June 20, 2007.
Summary of June 15, 2005 Revisions to RH BART and BART Guidelines.
Public Workshop Proposed RACT/BARCT Determination for Stationary Spark-Ignited Internal Combustion Engines August 29, 2000 California Environmental Protection.
July 21, Today’s Proposed Action Approve ozone SIP revisions for South Coast and San Joaquin Valley Reasonable Further Progress Transportation.
CAPCOA’S Perspective on Recent Key PM Legislation in California Presented by Mel Zeldin CAPCOA Technical Consultant.
Update on the PM2.5 Designations Process and the PM2.5 Implementation Rule Joseph Paisie WESTAR April 8, 2004.
Reasonable Further Progress Policy and Mid-Course Reviews John Summerhays EPA Region 5 June 20, 2007.
PM2.5 NAAQS Implementation Interactive Session NACAA Annual Meeting May 8, 2013 St. Louis, MO 1.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
November 15, Clean Air Act Framework National Ambient Air Quality Standards (NAAQS) set public health goals Planning process considers science,
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
308 Outline (a) Purpose (b) When are 1st plans due (c) Options for regional planning (d) Core requirements (e) BART requirements (f) Comprehensive periodic.
SIP 101 Kristin Patton SIP Project Manager, Air Quality Division Presented to Environmental Trade Fair and Conference May 3, 2016.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
PROPOSED FINE PARTICULATE ATTAINMENT/ NONATTAINMENT DESIGNATION RECOMMENDATIONS This proposal is available on the DEP Website at
1 Long Range Transport of Air Pollution Air pollution can travel hundreds of miles and cause multiple health and environmental problems on regional or.
Developing a Tribal Implementation Plan
Regional Air Quality Planning in the Upper Midwest
Clean Air Act Glossary.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Draft Modeling Protocol for PM2.5
Clean Air Act (CAA) Purpose
EPA’s 2014 Draft RIA EPA’s 2104 Draft RIA continues to rely heavily on PM2.5 co-benefits:
Maryland's Air Quality: Nitrogen Reductions and the Healthy Air Act
CAIR Replacement Rule and Regional Haze
2018 State Implementation Plan For the Annual PM2.5 Standard
PM2.5 NSR and Designations
U.S. Perspective on Particulate Matter and Ozone
Status of Preliminary Reasonable Progress Analysis
Presentation transcript:

Summary of Clean Air Fine Particle Implementation Rule Proposed in November 2005 EPA Office of Air Quality Planning and Standards August 17, 2006

2 PM2.5 Area Designations and Implementation Schedule December 2004PM2.5 area designations April 2005Effective date of PM2.5 designations November 2005Implementation rule proposed Summer 2006Final PM2.5 implementation rule December 2007Regional haze plans due April 2008PM2.5 implementation plans due

3 8-hour Ozone and PM2.5 Nonattainment Areas Designated Nonattainment PM2.5 only* Both 8-hour Ozone and PM2.5* 8-hour Ozone Only * For PM2.5, the designated partial county areas are shown as actual boundaries designated. OAQPS,AQSSD April 28, 2005

4 PM2.5 Implementation: Overall Approach Rule is based on “basic” nonattainment requirements in Clean Air Act (section 172, subpart 1) Coordinate planning and strategies to address regional haze and 8-hour ozone issues as well For each area, State plan will include measures to attain the PM2.5 standards “as expeditiously as practicable” –Account for significant air quality improvement from regional/national rules (e.g. CAIR, diesel rules) and State rules on the books –Assess local and in-state contributors to the problem –Adopt reasonable local and in-state measures to attain expeditiously and to protect public health. Even modest air quality improvements provide PM2.5 benefits in excess of costs.

Ozone & Fine Particle Nonattainment (Apr. 05) Projected NAs in 2010 and 2015 after reductions from CAIR/CAMR /CAVR and existing CAA programs Nonattainment areas for both 8-hour ozone and fine particle pollution Nonattainment areas for fine particle pollution only Nonattainment areas for 8-hour ozone pollution only 2010 with CAIR 2015 with CAIR CAIR/CAMR/CAVR and Other Clean Air Act Programs Will Help Bring Many Eastern Areas into Attainment - However, a number of areas are projected to not attain through 2010 and 2015 Eastern 108 ozone nonattainment areas with 408 counties 36 PM 2.5 nonattainment areas with 195 counties Projections concerning future levels of air pollution in specific geographic locations were estimated using the best scientific models available. They are estimations, however, and should be characterized as such in any description. Actual results may vary significantly if any of the factors that influence air quality differ from the assumed values used in the projections shown here. East 6 ozone 14 PM2.5 East 16 ozone 18 PM2.5

6 21 PM2.5 Areas Projected to Not Attain by 2010 Atlanta, GA Birmingham, AL Charleston, WV Chattanooga, TN-GA-AL Chicago, IL Cincinnati, OH-KY-IN Cleveland, OH Columbus, OH Detroit, MI Huntington-Ashland, WV-OH-KY Indianapolis, IN Knoxville, TN Libby, MT Los Angeles (South Coast), CA Louisville, KY-IN Macon, GA Pittsburgh (Liberty-Clairton), PA Rome, GA San Joaquin, CA St. Louis, MO-IL Steubenville-Weirton, OH-WV Total: 121 counties, 51 million population Very close: New York, Philadelphia, Baltimore, Canton

7 PM2.5 Implementation Rule Issues Attainment dates Classifications PM2.5 precursors Modeling and attainment demonstration Reasonably available control technology (RACT) Reasonably available control measures (RACM) Reasonable further progress (RFP) New source review

8 Attainment Dates State attainment demonstrations and SIP revisions are due April 2008 –Attainment demonstrations need to provide the supporting analysis for State adoption of measures that will result in the area attaining the standards “as expeditiously as practicable” Under CAA, attainment date is no later than five years from date of designation (e.g. Apr. 2010) –Extensions of 1-5 years are possible, considering: the severity of the nonattainment problem availability and feasibility of control measures (RACT and RACM) Modeling demonstration should show why 2010 is not practicable, and what future date is appropriate Attainment based on most recent 3 years of data (e.g for April 2010 attainment date)

9 When Assessing Attainment: Possibility of Two One-Year Extensions Example Attainment date for an area is April 2010, to be based on data If 2007 and 2008 are over but the annual average for the 2009 attainment year is below 15.05, the area can receive a 1-year extension –Attainment then will be based on If the average of 2009 and 2010 is below 15.05, the area can receive a second 1-year extension –Attainment then will be based on

10 Classifications Option 1: No classification system –Keeps it simple under subpart 1. Option 2: Moderate & serious classifications –Requested comment on criteria for two-tier system (examples: moderate = 5 yrs or less, serious > 5 yrs.; or based on design value threshold)

11 Coverage of PM2.5 Precursors Atmospheric chemistry leading to PM2.5 formation is complex Proposed approach for PM2.5 implementation and new source review –PM2.5 direct emissions (includes organic carbon, elemental carbon, and crustal material) and SO2 must be addressed –NOx must be addressed in all areas, unless the State and EPA provide a demonstration finding that NOx is not a significant contributor in a specific area. –VOC and ammonia do not need to be addressed, unless EPA or the State provides a demonstration that VOC or ammonia is a significant contributor in a particular area.

12 Modeling and Attainment Demonstrations All nonattainment areas need to submit an attainment plan having appropriate modeling according to PM2.5 modeling guidance –Requested comment on use of EPA modeling One-atmosphere modeling recommended (ozone, PM, haze) Years to model: coordinate with ozone and regional haze attainment & reasonable progress dates to the extent possible Mid-course reviews will be required on a case- by-case basis through SIP approval process –Check progress in 2010 and 2013; if not on track, conduct new modeling and evaluate new measures

13 Reasonably Available Control Technology (RACT)  RACT is the lowest emission limit that a source is capable of meeting with available control technology, considering technological and economic feasibility. Option 1. RACT required for all stationary sources with the potential to emit (pte) more than 100 tpy of direct PM2.5 or any precursor –Also requesting comment on thresholds of 70 and 50 tpy Option 2. RACT required for stationary sources only to the extent it is needed for expeditious attainment or to meet RFP. Option 3. –Option 2 for areas with attainment dates within 5 years –Option 1 for areas with attainment dates > 5 years

14 Control Measures for EGUs Proposed determination: in states obtaining all CAIR reductions from EGUs, EGU compliance with CAIR satisfies SO2 RACT and NOx RACT (provided SCR is operated year-round in 2009) Rationale: CAIR requires all feasible reductions by 2009/10; highly cost-effective reductions by 2015 Direct PM2.5 RACT required for all EGUs RACM section: experience has shown that consultations between power companies and States may lead to controls on specific plants to address CAIR and local PM2.5 attainment planning needs

15 Reasonably Available Control Measures (RACM) A RACM demonstration must show that the State has adopted all reasonable measures needed to attain the standard as expeditiously as practicable and to meet RFP. –Reasonable measures are those that are technically and economically feasible –In determining RACM for an area, the state must consider the cumulative impact of implementing the available measures and whether such measures taken together would advance the attainment date. –RACM may vary from area to area –Limited RACM analysis for areas with attainment dates of April 2010 or earlier

16 RACM (cont) Preamble includes a list of specific measures that States should consider as part of the RACM analysis. –States would not be required to adopt these measures, but should use the list as a starting point in the analysis –States also must analyze additional measures raised in public comment process.

17 Example Control Measures Diesel retrofits (trucks, school buses, stationary engines) Diesel idling (trucks, trains, port equipment, etc.) Programs to reduce emissions from poorly maintained vehicles New or improved direct PM and precursor controls on stationary sources Year-round operation of seasonal stationary source NOx controls Increase use of alternative fuel, hybrid vehicles Buy-back programs for small engines (boats, vehicles, equipment) Year-round measures to reduce VMT (Commuter Choice, carpooling incentives, etc.) Open burning laws and better enforcement Programs to reduced emissions from residential wood combustion and back yard barrel burning Smoke management plans Reducing emissions of volatile aromatic compounds (surface coatings, gasoline, solvents, etc.) * EPA provided grant funding to STAPPA to develop a “PM2.5 Menu of Options” document, published in March 2006.

18 Reasonable Further Progress (RFP) RFP: annual incremental reductions in emissions for purpose of ensuring timely attainment Baseline emission inventory year is 2002 RFP plan due with attainment demonstration in 2008 If attainment date is no later than 5 years from designations (up to April 2010), RFP would be met by attainment demo For areas with an attainment date extension, the State would establish emission reduction milestones showing “generally linear” progress from 2002 to January 1, 2010 and January 1, 2013 (if necessary) Alternate approach is possible if it would achieve equivalent air quality improvement Geographic range of SO2 and NOx emission sources included in RFP plan could extend 200 km beyond nonattainment area boundary

19 Contingency Measures To be implemented without further action if area fails to attain by its attainment date or fails to meet RFP requirements. Need to be measures other than those required for attainment or to meet RFP Level of reductions: one year’s worth of reductions needed for attainment in the area

20 Condensable PM Previous policies: PM is comprised of filterable and condensable emissions. Condensable emissions can be a significant percentage of direct PM2.5 emissions Test method 202 has been available for a number of years but not consistently applied. New methods (CTM- 039) are under development. Some states have required condensables to be addressed in SIPs and NSR permits for some time Condensables should be included in RACT applicability and control determinations States need to change emission limits in SIPs where reductions in condensable PM are needed for attainment

21 Improved Source Monitoring Reviewed a 4-part strategy for improving emissions monitoring at sources (described in a Jan FR notice) Discussed additional reductions that are possible with 1) increased frequency of monitoring (to identify upset conditions sooner), and 2) use of improved monitoring control measures (such as continuous emissions monitors) Noted concerns about the widespread use of visual emissions monitoring techniques to determine compliance with PM limits

22 PM2.5 Implementation Rule Other Issues Technical overview – chemistry, sources, ambient data New source review Transportation Conformity General conformity Emission inventories Tribal issues