Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:

Slides:



Advertisements
Similar presentations
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Advertisements

Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #21 Plenary 02/01/2013 To: DCIT By: Gregg Anderson.
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 26, 2013 Federal Aviation Administration Data Communications DCIT FDWG Climb Via Discussion.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #15 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Harris.com 02/01/2014 – 02/28/2015 Alex Murray | Systems Engineer DCIT 39 Plenary Health Monitoring Stats.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
Copyright © 2013 Boeing. All rights reserved. FaST | PNST | AOE Status: MD-11 issue AOEmodifiedEOT_RT_Template.ppt | 1.
P. Muraca v0.4 Data Comm DCL Trials end to end system test.
P. Muraca v0.2 Data Comm DCL Trials end to end system test.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #16 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #12 Plenary 01/12/2011 To: DCIT By: Gregg Anderson.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
International Civil Aviation Organization
HITSP Project 2007/2008 Work Plan and Schedule
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
Data Communications Implementation Team (DCIT)
Data Communications Program
15-19 Nov 2010 Rockville, MD – Lockheed Martin
Presentation transcript:

Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:

Federal Aviation Administration Agenda DTAP Development Status Trials Activities/Schedule/Testing Status Questions 2

Federal Aviation Administration DTAP Milestone Deliveries and CHI Design Review Summary SE2020 Contract Deliverables/DTAP Development On- going: -Initial Operational DTAP delivery to FAATC 8/20 -2 DTAP machines delivered (3 rd machine to Thane 8/27) -DTAP Functional testing commencing 8/23 -FDIO Echo Port interface development ongoing -PTR process in place -DTAP System Training commencing 8/22 OT&E Testing scheduled for Sept 10-14: -NATCA CHI reps early look last week in Aug -New NATCA reps participating in OT&E testing

Federal Aviation Administration Boeing/Airbus DTAP Non-Formal Testing Completed/On-going testing with Boeing and Airbus B777, B747, B737, MD-11, A330/340 test benches: -AFN, DM25/UM73 messaging -pDTAP and DTAP configurations Upcoming live testing next week with aircraft: -AFN, DM25/UM73 messaging -Tuesday - UPS -Wednesday – UPS / UAL / FDX / DAL -Thursday - FDX (Sandy attending)

Federal Aviation Administration DCL Trials Activities Status Trials Activities In Process/Complete: -Trials Test NCPs (3) – 2 approved, 1 pending -NAS CCB scheduled for 8/31 -Draft Training and Trials Planning materials complete -Oct 29 – Nov 9 MEM Training planned -DTAP equipment site pre-installation work 8/28-8/31 -CAT6, media converters, rack config, monitor/keyboard -FAA ISSM/FTI approvals and provisioning -FTI provisioning ordered -FEP build out at ATL by 9/8 -ISSM testing at FAATC 8/23 -Pilot, Controller Trials Feedback Surveys in development (Supports Analysis and Metrics)

Federal Aviation Administration FAATC DTAP Test Status DTAP non-Formal Release TEST opportunities Able to test with Boeing air lab utilizing multiple flight deck configurations 1.Successful ground / ground and air/ground connectivity verification 2.Successful AFN logons 3.Successful CPDLC message exchanges 4.Identified instances of problematic DTAP areas, which are accounted for in the formal release Able to test with Airbus air lab utilizing multiple flight deck configurations 1.Successful ground / ground and air/ground connectivity verification 2.Successful AFN logons 3.Not able to establish CPDLC communications, which is accounted for in the formal DTAP release DTAP Formal Release Install and check out 8/20/2012 Begin formal end to end functional tests 8/23/2012 Utilize Boeing and Airbus avionics flight decks Utilize FAA Laboratory avionics To the extent possible, utilize DCIT aircraft 6

DCL Trials Test Timeline (updated: 8/10/2012) pDTAP pDTAP / HADDS in box test pDTAP / HADDS via FNTB Failover / Rev # test pDTAP / HADDS / CSP Interface via FNTB + bench Avionics pDTAP (applicable reqs/VRTM) testing with bench avionics pDTAP testing via Boeing + Airbus air labs PTR fixes / regression Test Cases document final pDTAP Quick Look Report Thales install & checkout Sept 17 Controller OT&E (35) Dry run & prep Conduct MEM Nov 12 Training DTAP 1&2 Tech Center DTAP E-E Functional Testing (DTAP 1) DTAP 1&2 setup/prep Dry & Prep Conduct Controller OT  Prep / Dry run & Conduct System test case / bench avionics + TC aircraft System test case / Boeing air lab System test case / Airbus air lab System test case / DCIT aircraft Error conditions / failover PTR fixes / regression 8/23/1012: Security Assessment Regression with B2 (in lab) DTAP Test Report Install & checkout Training SAT sub_test cases final SAT sub_test cases functional testing/ FedEx aircraft E-E Operational scenarios based on DCIT v1.0 doc / FedEx aircraft Error conditions / failover in field env. Regression with B3 (in lab & in field) SAT Test Report May 10 (B1) Aug 17 Aug 22Sept 7Sept 14 DCL & AFN attempt with DCIT aircraft pre-arranged event (Aug 28, 29 & 30) AFN and CPDLC connect with Boeing event (July 31, Aug 3, 7, 11) Video Tech Center event (Sept. 13) (B2) Sept 3 (B3) Oct 1 (B4) Nov 30 (B1) = CAF, UM73, CHI, AFN (B2) = Adds UM79, AOC CC (no ack) (B3) = Adds UM80, AOC CC ACK(B4) = Adds UM83, FDIO (possibly in B3) AFN and CPDLC connect with Airbus event (Aug 6-8) Controllers early look & feel (Aug. 29) Oct 29

Federal Aviation Administration Questions ? KMEM