CRESCENDO CRESCENDO Philippe HOMSI Paul WEBSTER

Slides:



Advertisements
Similar presentations
© Fraunhofer Institute SCAI and other members of the SIMDAT consortium Data Grids for Process and Product Development using Numerical Simulation and Knowledge.
Advertisements

Air Transport System JTI CLEAN SKY
Life Science Services and Solutions
Program Management Office (PMO) Design
HR Manager – HR Business Partners Role Description
Course: e-Governance Project Lifecycle Day 1
Test Automation Success: Choosing the Right People & Process
© 2012 Autodesk BIM Collaboration Siva Koppula Technical Consultant.
Unrestricted © Siemens AG All rights reserved. The Digital Factory – Enabling a Holistic Approach to Automation MIT Industrial IoT Workshop – October.
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
Supply Chain Management
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Enterprise Architecture
Agile Manufacturing Industries From Mechatronics to Collaborative Supply Chains Industrial Technologies Aarhus, 19 June Dr. Massimo Mattucci Session.
Technical Integrity Assurance For Product Development W. Henson Graves Lockheed Martin Aeronautics Company Russ Campbell.
© The ATHENA Consortium. CI2: The ATHENA Interoperability Framework Module 3: Collaborative Product Development Scenario Aeronautics and Aerospace.
Process: A Generic View n A software process  is a roadmap to building high quality software products.  provides a framework for managing activities.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Rational Unified Process Fundamentals Module 4: Disciplines II.
CRESCENDO Full virtuality in design and product development within the extended enterprise Naples, 28 Nov
Industrial Engineering Roles In Industry
ICS321 – Management Information Systems Dr. Ken Cosh.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
© 2013 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Achievement of an Integrated Applications Environment Enterprise.
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
CISB444 - Strategic Information Systems Planning Chapter 3 : Developing an IS/IT Strategy: Establishing Effective Processes Part 2.
© 2012 xtUML.org Bill Chown – Mentor Graphics Model Driven Engineering.
Enabling Project Communication, Collaboration & Workflow (CCW)
1 CIM OSA CIMOSA Computer Integrated Manufacturing Open System Architecture 1 David CHEN IMS-LAPS, University Bordeaux 1.
Enterprise Systems Architectures EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2012.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
Reimagining… “We recognise that parts of this Plan have implications for other organisations, particularly public libraries, and we will invite participation.
Practical Investment Assurance Framework PIAF Copyright © 2009 Group Joy Pty. Ltd. All rights reserved. Recommended for C- Level Executives.
Process: A Generic View
Presented To: Dr. Dina Rateb MOIS 549 Class Presented By: Karim Aguib.
Warszawa 18 luty th Framework Programme NMP - 2nd Calls Integrated Projects for SMEs Hervé Péro, Christophe Lesniak DG Research.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
XLIX Engineering Design Firm © 2010 ENGR/ETGR Definition of Project 1 A project is “…a combination of human and non-human resources pulled together.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Collaborative & Robust Engineering using Simulation Capability Enabling Next Design Optimisation © This document has been produced under the EC FP7.
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
Software Engineering (CSI 321) Software Process: A Generic View 1.
Skills and products portfolio an overview Lorenzo Martinelli – Business Development Contact:
Viewpoint Modeling and Model-Based Media Generation for Systems Engineers Automatic View and Document Generation for Scalable Model- Based Engineering.
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
Technical Operations 12 th July 2010 Dr Phil Spiby Eurostep Limited Integrating Systems Engineering Information with AP233.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
Carmela Tuccillo Orlando Troisi Università degli Studi di Salerno
Total Resource and Energy Efficiency Management System for Process Industries The sole responsibility for the content of this document lies with the authors.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
OrbEEt Project Introduction <Location>, <Date> Presenter
Upturn Consulting 27, March 2017.
The Enterprise Relevant Scope of DM
The Open Group Architecture Framework (TOGAF)
BU IS GIG Chemical, Oil & Gas
"IT principles" Context, roadmap
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
Enterprise Architecture at Penn State
Introduction to Modelica and FMI
Presentation transcript:

CRESCENDO CRESCENDO Philippe HOMSI Paul WEBSTER 30th November 2007 Presented by Philippe HOMSI Airbus Paul WEBSTER Rolls-Royce CRESCENDO Collaborative & Robust Engineering using Simulation Capability Enabling Next Design Optimisation Technology Based Workshop - Full Virtuality in Aircraft development Process

Plan Expected Business Benefits Roadmap Scope and Perimeter Innovation & Deliverables Work Breakdown Structure and Use cases Required partnership Status & Schedule Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

Expected Business Benefits Design and Simulation Tools Technology NO REWORK SHOULD BE EXPECTED IN THESE PHASES Production Technology Progressive product enhancement AIRCRAFT CONCEPT OPTIONS Make Faster PRODUCT TECHNOLOGY OPERATE MAKE & TEST Validated Model Customers Reduce test time The whole business process must be simulated and vetted in this phase to achieve NO REWORK Environment Manufacturing and Test Innovation Skills Design, Manufacturing and Operations Innovation Skills Operator Innovation Skills Business Model Total Closed Loop Quality Business Management Innovation Skills To contribute to 10% reduction of design & development lifecycle time/cost To contribute to a 50% reduction in rework To contribute to a 20% cost reduction of physical tests Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

VIVACE / MAAXIMUS CRESCENDO Roadmap Subsystem and aircraft level Technology Challenges Validate Develop Understand Discover 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Robust architecture Information sharing & Exchange and Visualisation Right first time Simulation life cycle management and KBE for architect Virtual certification Virtual Enterprise Virtual testing CRESCENDO VIVACE / MAAXIMUS Subsystem and aircraft level Model based P. Bachelier I do not like very much the split between M & S capability at component /function level for NSR and at A/C level for NLR as for example Palmas and Flight control target for pre-sizing loads are at A/C level and should be implemented on NSR and likely on A350. I prefer the slide which was elaborated within the EISS exercise: robust architecture and right first time design capabilities for NSR and virtual certification at M7 for NLR. This proposal includes the comments of Pierre G. Wolf - I agree with Pierre M&S strategy Link with supply chain Discipline and component level Process based Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

Behavioural Digital Aircraft Implications of Engineering Strategy for Analysis Scope & Perimeter Value Generation - Value Generation - Value Generation - Value Generation Behavioural Digital Aircraft Linked to PLM Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

Innovation & Deliverables A validated Common Model Architecture and associated aircraft dictionary and language allowing the delivery of the behavioural Digital Aircraft: The functional aircraft (the active part of the aircraft. It integrates the control and command of systems, the communication of information between them and towards operators, the organs that are activated, the energy that activates them, and all the different states in which they may be, including failures.) The physical aircraft (application of the laws of physics to the aircraft: examples are mechanisms, structural mechanics (stress, fatigue, impact), aerodynamics, aero-elastics, manoeuvres, internal flows (fuel, hydraulics), thermal physics, acoustics, electro-magnetism, and many others). The business model through the programme life cycle and linked to the PLM Common Multi Disciplinary Business and design services implemented in a federative and evolutive common framework Trade-off capabilities Uncertainty Management Change impact analysis Information system services and capabilities Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

Work Breakdown Structure Energy Aircraft Value Generation Power Plant Integration Thermal Aircraft Avionic Preliminary Design Definition Development Behavioural Digital Aircraft Methods & Tools Information Technologies Integration is to be understood respectively as federation for the information system, as seamless configuration for the life cycle and real integration for Product Integrated Product Seamless configuration Federative capability Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

Required Partnership Manufacturers (~15): Airframe, Helicopter, Engine, and Equipment manufacturers with the following roles Provide the business use cases that will justify the business benefits Express requirements in terms of models, simulations and the associated maturity and fidelity levels Express requirement in terms of Business services Participate in the development of the models according to the Common Model Architecture Participate in the develop of business services Participate in the validation of the models, simulation and business services developed Research Institutes (~15): Aeronautical research centres and Universities with the following roles Transform the requirements from use cases into specifications for innovation related to the solutions to be developed Participate in the development of the solutions Participate in the validation of the use cases These partners will be selected after having performed a make or Buy from the use cases provided by the manufacturers partners Software and IT Suppliers (~10) with the following roles Transform the requirements from use cases into specifications of the solutions to be developed Participate in the development of solutions Certification Authority (at least 1) Project Management Office (1) Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

Status & Schedule Mid April 2008: Final proposal Today: Good maturity of the project scoping  Objectives and Perimeter frozen  WBS, Milestones, project phasing and Deliverables frozen  Budget frozen  Core team established  Process of selecting new partners about to start December 2007: First of the proposal  Finalisation of the Consortium  Good draft of the task description Mid April 2008: Final proposal 7th May 2008: Dead line for Submission January 2009: Project Start December 2011: End of Project Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

The behavioural Digital Aircraft Common Architecture The Common Architecture (CA) A virtual library of models which contains the ‘book covers’ and ‘table of contents’ of each model, but not the models themselves. The book cover and table of contents provide the meta-data and meta models along with the associative information providing the interactions between models their levels of maturity and fidelity,etc. The ability to provide multiple views and layers of the CA is critical, since the different types of design issues are limitless and varying with each development cycle. Added to this are the inherent design issues which are specific to each phase of the development cycle. The ambition of CRESCENDO is to make a significant jump towards creating the behavioural Digital Aircraft, for: Integrated Product Teams working in virtual “plateaus”, involving multi-disciplinary teams collaborating thanks to an overall aircraft model architecture covering: preliminary design, design, testing and certification Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

Industry needs: Airbus keynote speech Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

Industry needs: Rolls Royce keynote speech Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007

Industry needs: Thales keynote speech Increased functional complexity of systems Interdependence of subsystems A “requirement management approach” is no longer viable System design must be architecture-driven Functional view of architecture is of primary importance A common language must be set-up across industrial partners for addressing functional view : the “shared functional model” Need to share assets in a multi-company collaborative approach (seamless work organisation) Technology Based Workshop - Full Virtuality in Aircraft development Process November 2007