Texas Nodal © 2005 - 2006 Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez.

Slides:



Advertisements
Similar presentations
1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
Advertisements

RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Real Time Mitigation During Exceptional Fuel Cost Events.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Role of Account Management at ERCOT 2007 TAC Goal Input February 01, 2007.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
STANDARD & GENERIC COSTS FOR WOOD FIRED BIOMASS PLANTS H.BASARAN/B.CHAKKA AUSTIN ENERGY RCWG MEETING SEPTEMBER 21,
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Enterprise Data Warehouse Section 8 – Performance Monitoring.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair.
Nodal Formatting of Zonal Protocols Sections Currently Not Part of the Nodal Protocols 11/28/06 TPTF Diana Zake, Market Rules.
NPRR 617 Overview and Justifications. Overview Current protocols place restrictions on Day-Ahead Three-Part Supply Offers – Part 1 (Startup Offer) – capped.
TPTF Verifiable Cost Sub-group Summary Report to TPTF 1/21/2008 Jim Galvin- TPTF VC Sub-group Chair.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Small Resettlements A Proposal to Reduce Impact on ERCOT and Market Participants.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
RUC Startup Discussion. Problem The RUC language in the Nodal Protocols allows little or no ability for a generator to recover risk associated with operating.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
External Interface Update 1 External Interface Update April 2, 2007 Daryl Shing.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Cutover Market Call November 29, :30 PM
Exceptional Fuel Costs in LMP
Nodal COMS Additional Items Update
General Overview Of Resource Costs
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Presentation transcript:

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez ERCOT

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 2 Verifiable Cost Manual Background: 1. What has been accomplished so far?  ERCOT created a Verifiable Cost (VC) Process Manual  Began discussions with SDAWG {Oct 12 and 15, 2007}

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 3 Verifiable Cost Manual Background: 2. What inputs were used by ERCOT to develop the Manual?  Nodal Protocols  Discussions with Market Participants  Input from ERCOT’s Independent Market Monitor  Input from PUCT staff  Discussion with PJM and CA ISO staff  Research and market reports

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 4 Verifiable Cost Manual Manual: 3. What is included in the Manual? Section 1: An Introduction to Verifiable Costs Section 2: General Rules of Verifiable Costs Section 3: Verifiable Startup Costs Section 4: Verifiable Minimum Energy Costs Section 5: Mitigated Offers and Verifiable Costs Section 6: Verifiable Heat Rates Section 7: Forced Outages of a RUC-Committed Resource Section 8: Operating and Maintenance Cost Guidelines Section 9: Timeline Applicable to the Submission and Review of Verifiable Costs Section 10: Timeline for Rescinding Approval of Verifiable Costs Section 11: Appealing Rejected Verifiable Costs Appendix 1A: Methodology for Determining Maintenance Costs of Nuclear and Fossil Steam Units Appendix 1B: Methodology for Determining Maintenance the Costs of CT and CCP Units Appendix 2: Typical Variable O&M Values Appendix 3: Operating and Maintenance Cost Categories

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 5 Verifiable Cost Manual Manual: 4. What is not included in the Manual?  Processes and rules for appealing to the PUCT ERCOT’s rejection of a Verifiable Cost submission  Approved document detailing the interfaces and templates that ERCOT and market participants will use to communicate Verifiable Cost information

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 6 Verifiable Cost Manual Questions: 5.Issues that were addressed by ERCOT and SDAWG but are not within the scope of the current Nodal Protocols.  Should the additional fuel costs incurred while ramping up from breaker close to LSL be accounted for (e.g., by increasing startup fuel consumption)?  Should the decreased fuel costs incurred while ramping down from LSL to breaker open be accounted for (e.g., by reducing startup fuel consumption)?  Should shutdown costs be paid? If so, should they be paid in all circumstances and without regard to when a commitment terminates?  How should ERCOT address the possibility that RUC instructions will will be canceled prior to breaker close?

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 7 Verifiable Cost Manual 5. (cont.)  Should ERCOT pay for a resource’s actual fuel costs when they exceed FIP/FOP? Should such price disparities be addressed upfront through the use of a multiplier/buffer in SUO cap and MEO cap calculations (as is done when calculating Mitigated Offer Caps)?  Should ERCOT calculate a clawback charge when a resource’s actual fuel cost is less than FIP/FOP?  Should Verifiable Costs become effective on the day they are submitted (applied retroactively in resettlement)?  Should Verifiable Costs for startup and minimum energy be individually approved?  If a RUC committed resource alters its fuel type of fuel consumption ratios, should any associated changes to fuel costs be accounted for in resettlement?

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 8 Verifiable Cost Manual 5. (cont.)  Is it appropriate to apply the logic of RUC-decommitments to SPS actuation events? Specifically: 1. Should cost recovery be capped at startup costs? 2. Should recovery be unavailable to resources that planned to be offline during the operating day? 3. Would it be more appropriate to allow recovery of all costs incurred as a direct result of the SPS actuation and then uplift those costs on the basis of Load Ratio Share?