STTC Meeting 12/04/99 Eva Sánchez-Corral 1 ST Year 2000 Preparation Progress report Project Definition Report INB and the Y2K syndrome Actions. Conclusions.

Slides:



Advertisements
Similar presentations
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
Advertisements

Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
OPM Cybersecurity Competencies by Occupation (Technical Competencies) Information Technology Management Series Electronics Engineering.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne, office K115A. –
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
Interface Programming 1 Week 15. Interface Programming 1 CALENDAR.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
STTC 20/08/2002 Eva Sánchez-Corral 1 ST Division W2000 Migration status report Organisation and Management Strategy and Planning Review of experience Status.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Flowers North Development of a Web Site and Online Store for.
The Project Planning Process
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
1 The Initial Report Preparation Guidelines. 2 The Initial Report u Definition of project scope u Project aims and objectives u Initial project plan.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
PRODUCT LOCATOR PresentedBy Richard Raehl November 13, 2001.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
Your university or experiment logo here GridPP Storage Future Jens Jensen GridPP workshop RHUL, April 2010.
Y2K/Focus April 1999 S. Jarp Year 2000 co-ordination AT CERN S.Jarp/IT months left 29 April 1999.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
4/12/2001P. Ninin1 MP STATUS REPORT MP5 a tool for the daily life of the ST division…
ST Workshop 1 April 2003P. Vojtyla - TIS/IE1/10 Interaction of TIS and ST in Environmental Matters P. Vojtyla TIS – Integrated Safety and Environment.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
TIARA Mid-term meeting June 2012 WP3: Accelerator R&D Infrastructures Anders Unnervik 1.
XLIX Engineering Design Firm © 2010 ENGR/ETGR Definition of Project 1 A project is “…a combination of human and non-human resources pulled together.
Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000.
GLM 22/10/2002 E.Sánchez-Corral, L. Symons / ST D. Mathieson /AS 1 AOC Project Progress Report Organization Scope, Strategy, Objectives Status: – specification,
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
RSA in Austria CEDR SG „Road Safety“ Eva M. Eichinger Copenhagen, April, 2004 Road Safety Audit in Austria Eva M. Eichinger, M.Sc., Ph.D. Federal Ministry.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
1 Welcome to ODOT Practical Design Tier 1 Training (Tab 1)
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
External Data and DIP Oliver Holme 18 th January 2008.
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
ADO-PO / TC meeting 1st December 2016
Performance monitoring framework for the technical infrastructure
Operating systems and Internet Infrastructure services
CLIC / ILC Collaboration for CFS works
2. ISO Certification Discussed already at 2015 PoW and several WLCG OB meetings Proposed approach: An Operational Circular that describes the organisation's.
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Team Project Review the background information and project teams on our course site Work with the engineers (4-5) and your PM team member(s) You have.
Final Report of Phase 2 of the Pilot Project
Identifying the Work to Be Done
NSS integrated installation plan workshop Introduction
Fire Emissions Joint Forum
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

STTC Meeting 12/04/99 Eva Sánchez-Corral 1 ST Year 2000 Preparation Progress report Project Definition Report INB and the Y2K syndrome Actions. Conclusions

STTC Meeting 12/04/99 Eva Sánchez-Corral 2 Progress report ST Y2K Web pages –being completed by every group Project Definition Report –Draft issued –Review by ST Y2K Working group Meeting on 13 April 1999

STTC Meeting 12/04/99 Eva Sánchez-Corral 3 Project Definition Report Purpose, scope, objectives –Purpose assure the stable operation of the CERN technical infrastructure systems under ST responsibility through the millennium change –Scope:  Cooling and Ventilation for Accelerators and Sites  Telecommunications (telephones, fax, modem video)  Civil Engineering

STTC Meeting 12/04/99 Eva Sánchez-Corral 4 Project Definition (2) –Scope: Access Control General Safety (gas, fire, evacuation) Heavy Handling and Transport CERN Electrical Distribution –Objectives: To identify problems, prioritise work and propose an action plan per service by June 1999 To provide the ST technical installations with a fully year 2000 compliant environment (hardware, software) by December 1999/April 2000

STTC Meeting 12/04/99 Eva Sánchez-Corral 5 Project Definition (3) Risk management –Identify Risk/Action Plan Work Breakdown Structure –Phase 1: June 99 Inventory (HW, SW), problem investigation, action plan –Phase 2: January 1st 2000 /machine start up April 2000 Corrections, testing and installing

STTC Meeting 12/04/99 Eva Sánchez-Corral 6 Project definition (4) Milestone Plans. Responsibility Chart defines roles and responsibilities to achieve milestones in Milestone Chart

STTC Meeting 12/04/99 Eva Sánchez-Corral 7 INB and the Y2K syndrome Report to be sent to INB in June 99 –Elements to be covered –Questionnaire ST Y2K Action Plan will cover the INB ‘requirements’ –ST Y2K Project Definition Report covers already the INB main points

STTC Meeting 12/04/99 Eva Sánchez-Corral 8 Actions. Conclusions ST Y2K preparation work is in progress –Division and group level Good progress ! ST Y2K preparation will cover the INB requirements