Rosa Mitsumasu Rebecca Wagner Jonathan Steffens Kevin Harvey.

Slides:



Advertisements
Similar presentations
P14421:Smart PV Panel Team Leader: Bobby Jones Sean Kitko Alicia Oswald Danielle Howe Chris Torbitt.
Advertisements

Solar Sausage for Desalination Sponsor:FAMU-FSU College of Engineering Advisors: Dr. Michael Devine Dr. Shangchao Lin Instructors:Dr. Nikhil Gupta Dr.
P11462: Thermoelectric and Fan System for Cook Stove Jared RuggProject Manager (ME) Brad SawyerLead Engineer (ME) Jeff BirdMechanical Engineer Tom GorevskiElectrical.
P10057: Delivery and Scale-Up of a Monitoring Device for Human Smoking Behavior Ryan Miller – Project Manager Chris Oxley – Lead Engineer Ryan Enyeart.
Project Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T MSD I Project Review Objectives of the Project Review Proposed Review Structure.
LFTB Proprietary Information 1 Fuser test bed ™ R I T MSD1 Project Review February 22, 2007 Fuser Test Bed P07501 IE TEAM Justin McMillan – Project Lead.
P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
P08456-LED Lighting for an Underwater ROV Jeremy Schiele-Project Manager Jonathan Lent-Mechanical Engineer Ryan Seeber-Computer Engineer Justin VanSlyke-Mechanical.
Software Engineering General Project Management Software Requirements
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
Project Status Update R10004: OS/OA Low Energy Printing Mechanical Engineers: Dean Culver Shawn Hoskins Derek Meinke Tim Salter.
Automatic Home Medication Dispenser Project # P07009 Team Guide - Dr. Daniel Phillips Project Sponsor - Dr. Michel Berg Team Members Alan StrandburgChris.
P07007: Adapted Home Entry Sponsor: National Science Foundation Wenbo Chen Project Manager, EE Tanvir Rasel EE Meklet Kidane EE Faculty Mentors: Dr. Elizabeth.
Detailed Design Review of Magnetic Field Centering Device Project # P08028 “Develop a Design and Methodology to Ensure the Concentricity between the Magnetic.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
HISTORY MARKET The Development of Concept Companies into Entrepreneurial Business SEED STAGE & EARLY STAGE VENTURE CAPITAL Funding Mentoring UNIQUENESS.
Pharos University. جامعه فاروس Faculty of Engineering
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
DESALINATION. MEANING THE TABLE GIVEN BELOW IS THE LISTS OF THE CONCENTRATIONS OF SEVEN SUBSTANCES THAT TOGETHER COMPRISE MORE THAN 99 PERCENT OF THE.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
Wave Energy Desalination System By: Michael Casebier Vincent Fiamengo Kenny Se Ericson Capitulo Wilfred Salvador Dr. Josh Hamel Group 11.
Nizar Kammourie General Manager SAWACO Water Desalination
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
Motor Assisted Wheelchair Design Review 09/10/15.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
Feb 7, 2012 Term 8 Senior Design Project Sustainable Water Desalination Tuesday February 7, 2012.
High Temperature Waste Pasteurizer Brian Kilger Kyle Cohn Kyle Weston Stephanie Mauro Parabolic curve P13411.
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
Carl Vance Combustion Air Pre-heater Design Review Presentation ME 486 3/13/03.
P07108: METEOR Instrumentation Recovery System. Team Bash Nanayakkara – Project Manager (ISE) Scott Defisher – Fuselage Design (ME) Mike Kochanski – Software.
Product development Engineering & Regulatory Raj Agrawal InnAccel.
FLOW Assessment Systems Milestone Presentation April 9, 2002 Philip Beddow Adam Franzen Marcus Diehl Garth Gillespie Rhoda K. FarrisElizabeth Lighthart.
P08401: Solar water desalination for the developing world Rosa Mitsumasu Heredia (ISE – Project Manager) Rebecca Wagner (ME) Kevin Harvey (ME) Jonathan.
Capstone design for environmental engineering Fall, 2010 JiHyang Kweon
Solar Power. The sun provides the energy for 5/6 of all the electricity used in the world. But most of it is second- hand. Fossil fuels—coal, petroleum,
By Mark Oxley and James Robeson.  More than 85% of the energy used in the United States is supplied by fossil fuels [1].  Our project’s goal is to create.
Information Tool Making Complex Data Useful Ara Design Ltd. Tiit Paabo, 5. April 2016, Opening seminar User-Centered Approach.
Detailed Design Review Friday, February 20 th, 2009 Customer: FSNM, contact: Debbie Conway Guide: Brian Thorn P09453.
“UV Tube” Water Disinfection P07402 Project Review 23 February 2007 Sponsored by Dr. Andres Carrano and Dr. Brian Thorn of the KGCOE ISE Department.
Project: P08371 Portable Command Post Rick Chadwick ME Harith Wijetungage IE Scott Pudlewski EE Sponsors: Technet Global Services DiLorenzo Electronics.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
MOBILE CAMERA CONTROL SYSTEM. Team Members Ruth Ayalon – ME Ruth Ayalon – ME Erin Gillespie -ME Erin Gillespie -ME Claudia Forero –ISE Claudia Forero.
EPA Solar Water Pasteurizer with Integral Heat Exchanger
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Final project review presentation MSD P Visual and Auditory Object Recognition testing apparatus & objects Andrew Chorney- Project Manager Michael.
Team Members Shawn Russell Project Manager David Eells
Rochester Institute of Technology P17487: KonTiki Kiln Heat Recovery
P07203 Dynamometry Laboratory Infrastructure
Software Myths Software is easy to change
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
P08351: Automated Oiling System
P08002-Automated Parallel Bars
HEMODYNAMIC SIMULATOR II P09026
P07021: Instrument to Detect Thromboemboli
1) Project Outline/ Assignment Sheet 2) Project Grading Rubric
Project Review P07442: Thermoelectric Demonstration Test Bed
P08424 Residential Energy Savings
Chapter 15 SEction 9 How is Water Purified?
Floating Desalination System: A Fully Solar Powered Method to Aid Water Shortages Statement of Problem With the newly developed technologies, is it possible.
Team P08404: Solar Pasteurizer Concept / System Design Review
Chapter 15 SEction 9 How is Water Purified?
Detailed Design Review (Phase 4)
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
Detailed Design Review
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
Market Test the Offer.
Presentation transcript:

Rosa Mitsumasu Rebecca Wagner Jonathan Steffens Kevin Harvey

Problem Statement Clean drinkable water, the main source of life, is becoming a scarce resource. Currently, 50% of communities in the developing world are exposed to polluted water sources. Coastal communities have an abundant source of water in the ocean. However, this great source is not commonly utilized for the production clean, consumable water.

Project Description Low cost, easy to reproduce device that uses solar energy to desalinate and purify water using the ocean as the primary source. Target Market: Coastal communities in Peru.

#The ProductNeeds toImp 1The device will Meet EPA Surface Water Treatment Standards 9 2The device willDesalinate Water9 3The device willFilter Contaminants9 4The device will Supply enough water for a consumption for a family 9 5The device will notUse electricity9 6Materials will beCorrosion Resistant9 7Materials will beTemperature Resistant9 Needs Assessment Water Quality and Output Energy SourceMaterials Quality

Needs Assessment Availability & Cost User friendliness Safety & Robustness #The ProductNeeds toImp 8Materials will beLocally Available9 9Materials will beLow Cost9 10Assembly will beLow Cost9 11Use will beLow Cost9 12Maintenance will beLow Cost9 13Use will beUser Friendly3 14Assembly will beUser Friendly3 15Maintenance will beUser Friendly3 16The device willNot Burn3 17The device willNot have sharp edges3 18The device willRobust3

Engineering Specifications #NeedsMetricImpUnitsValue 11, 6Salt Concentration9mg/l* 22BOD concentration9mg/l** 33VOC Concentration9mg/l*** 43Mineral Concentration9mg/l500 54, 15Water Output Quantity9liters/day19 69, 10Cost per Unit9$ < Usage Cost9$0 812Maintenance Cost9$< 5 97, 8, 9Temperature Resistance9CY 1018Material Yield Strength3MPa> Sharp edges exposure3-No 124, 9, 14, 15,Unit Size1sq. meter<3.5

Concept Description Solar Distillation Solar Distillation Upward Wicking Upward Wicking Materials Desalination / Purification Availability and Low Cost in Product Lifecycle

Design Concept 1. Housing 2. Wick Hanging Mechanism 3. Upward Wicking 4. Top Feed 5. Output Collection Rails 6. Reflectors (optional)

System Architecture Contaminated Salt Water BASIN HOUSING WICK Faster Evaporation Condensation Clean Drinkable Water EvaporationSalts and Contaminants

High Risk Assessment Output: The expected output is 19 liters of clean, drinkable water per day. Evaporation on wick is difficult to model Unit size based on ideal heat transfer scenario and materials to optimize performance.

Current Design State Current design meets all the customer needs Engineering Analysis is still being completed One week behind schedule Engineering Analysis is not complete Bill of Materials is not finished

Budget ComponentMaterialQtyUnit Price Extended Price Housing Rectangular SidesAcrylic Sheet Housing Triangular SidesAcrylic Sheet Output CollectorsAcrylic Sheet Top Feed CollectorAcrylic Housing BaseAcrylic Wick Hanging RodPP19.03 WickWoven Polyester BasinAcrylic SealantSilicone HingesSteel HosesRubber TOTAL 1 (WITHOUT REFLECTORS) (US$) Reflecting SurfaceTinfoil Reflector SupportWood “legs”Wood--- ManualPaper < TOTAL (INCLUDING REFLECTORS) (US$)

Timeline - Progress MSDS IMSDS II Phase 0: Planning Phase 1: Concept Development Phase 3: Detailed Design Phase 2: System Level Design Current State of Development Finished Prototype

MSD II Project Schedule Milestones March 17 th (week 2): Design finalized and all parts on order. April 18th (week 6) : Functional alpha prototype (full featured) Design verification testing complete, initiate design, revisions May 9 th (week 9): Design Verification Testing Results Complete Documentation Finalized: DHF, Formal Paper, Poster May 16 th (week 10): Project Review - Phase 4 Completion

Testing Plan Wick Materials – For absorptivity Housing – Assembly improvement Output – Contaminants concentration

Questions?