Pixel Heaters Refurbishment 22.01.2014 A.Bitadze.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
A.Nichols CLRC1 SCT HEX PRR ( ) Layout & Installation of Barrel off-detector HEX circuits From barrel cooling loop to PPB1 l Barrel Hex is a plain.
Russ Rucinski, FNAL VLPC Cryocooler cryostat Status – June 7, 2006.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
High Sensitivity Smoke Detection
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Tracker Thermal Control System 1 AMS Tracker Thermal Control System (TTCS) Phase II Safety Presentation SRII meeting, 21 May 2007, Houston Johannes van.
IBL cooling status Pixel week 15 October 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Claudio Bortolin, Piotr Gach, Artur Szlachcic, Olivier Crespo.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
Activities Status and Plan for the week D. Giugni Monday Meeting
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Feedback on transfer line sizing and flow calculations for UT
Service channels between Tracker and PP1
Rosario Turrisi INFN Padova
Service channels between Tracker and PP1
DCS: Temperature Probes
DCS: Temperature Probes
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
VELO Thermal Control System
Tracker cooling loop “check out” draft for discussion
Teleconference ACS – FREIA 17th October 2017
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
Teleconference ACS – FREIA 31st October 2017
IBL activities ATLAS Meeting Milano, 14 May 2012 S. Coelli,
Radiation Laboratory Meeting
ROD assembly and test in US
ATL-IC-ES new version available - approval starts
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Instrumentation
ICARUS Internal Cryogenic Sensors
Presentation transcript:

Pixel Heaters Refurbishment A.Bitadze

Work done: Core resistance measurements (for the heating element). Isolation resistance measurements. Measurement are done every month to monitor changes Inspection of the control, interlock and C31/C32/C33 temperature sensors and connectors. Relabeling temperature sensor cables and connectors. Checking existing spare heaters. Created existing spare heater inventory (Twiki page). Ordered 16 Spare heaters from THERMOCOAX. Created EDMS folder for documentation. 2/14

Work done: Core resistance measurements. Design Resistance: Barrel/Opto Ω Discs Ω 3/14

Work done: Core resistance measurements. Design Resistance: Barrel/Opto Ω Discs Ω 4/14

Work done: Core resistance measurements. 5/14

Work done: Isolation resistance measurements.  Measured isolation resistance for the Heater on Loop 084 was 450 MΩ. Measurements in were showing O.L. in GΩ range. Measurements in were showing 450 MΩ. Measurements in were showing O.L. in GΩ range. Measurements in are showing O.L. in GΩ range. All other heaters show O.L. for the isolation resistance in GΩ range  Measured isolation resistance for the Heater on Loop 005 is 0.11 MΩ. Measurements in were showing O.L. in GΩ range. Measurements in were showing O.L. in GΩ range. Measurements in were showing 0.11 MΩ. Measurements in are showing 0.11 MΩ. 6/14

Work done: Inspection of the control, interlock and C31/C32/C33 temperature sensors and connectors. Envelope # 1 Q1AProblem with TC_AProblem with TC_BProblem with C2Problem with C31Problem with C32Problem with C33Action 3 No Bad connector Change connector for C3, repeat test Envelope # 2 Q1CProblem with TC_AProblem with TC_BProblem with C2Problem with C31Problem with C32Problem with C33Action 19 No Resolder or exchange TC#2A, then test C non stable Envelope # 3 Q1AProblem with TC_AProblem with TC_BProblem with C2Problem with C31Problem with C32Problem with C33Action 18 No Nothing Envelope # 4 Q1CProblem with TC_AProblem with TC_BProblem with C2Problem with C31Problem with C32Problem with C33Action 20 No Nothing Damaged sensor/connector inventory: Damaged:5 Thermocouples 19 NTC 1 Connector (for C33 sensors) 7/14

Work done: Relabeling temperature sensor cables / connectors. 8/14

Work done: Checking existing spare heaters. Created existing spare heater inventory (Twiki page). DetectorTypeN of SparesN of low I.R. PixelBarrel91 PixelDisk40 SCTBarrel30 SCTEndCap82 DetectorType & Series NBatch NResistanceCommentImagesCustom made Coil connector Power connector (Lemo) Thermocaple and cable connector Inlet Connector CoreIsolation (at 250V) PixelATLICSC_0006/0137.2OLSerto is missing. No heatshrink on CC 16INNp PixelATLICSC /11-OLIn SR1 Gppp PixelATLICSC_0006/0919.6OLSerto is missing.1313, 14, INNp PixelATLICSC_ /0719.8OLLemo damaged. No thermocoupls. 11, 2, 323GDNp PixelATLICSC_ /2219.9OLwriten on pipe: "shorted" 44, 55DDDp PixelATLICSC_0006/1018.6OLIn SR1 connected to test stand writen on pipe: "short" 6,7,8,96,7,8,9Gppp PixelATLICSC_0006/0237.5OLSerto missing. No heatshrink on CC 1010,11,121112IGNp PixelATLICSC_ /3019.3OL (11MΩ at 500V) writen on pipe: "heater shorted" 1717,1818DDDp 9/14

Work done: Ordered 16 Spare heaters from THERMOCOAX. 16 Assemblies CHF 10/14

Work done: Created EDMS folder for documentation. ID Evaporative Cooling System Heater Refurbishment 2013 EDMS Id: and sub-documents for: PIXEL Heaters EDMS Id: SCT Heaters EDMS Id: Spare Heaters EDMS Id: Presentations / Meeting minutes EDMS Id: This EDMS folder contains all documents (Drawings, Measurement Data, Plots, Presentations, Meeting minutes…) related to the heater refurbishment activities. 11/14

On-going activities and plans:  Fixing Broken Sensors (5 TC, 19 NTC, 1 Connector).  Solder Lemo Connectors on control sensor cables (2x88 in SR1 + 2x88 in pit = total 352).  Attach TC sensors instead of C33 NTC sensors (33 sensors). Solder Lemo Connectors on these control sensor cables.  Endescope inspection for 20% of heaters.  Pressure Test at 7bar abs. Parts are ready: Manifold, Pressure Sensors, Readout box, PC, Labview program.  Leak Test. 12/14

Timetable : 13/14 PIXEL installation flow-chart JanFebMarchAprilMayJune 2014 Week ################## PP2, Opto system commissioned pixel cabling C side pixel cabling A side C3F8 distribution rack final & tight heater connectors X X√ heater installation/ connection C side heater installation/ connection A side Pixel conncection to heater leak check C A Dry wrapping of exhausts/Nose area Pixel trial operation SCT trial operation IBL installation IBL connection IDEP close

THANK YOU FOR YOUR ATTANTION 14/14