R14701: ME Machine Shop Opportunities.  Goal ◦ Top rated ME program and ME machine shop in the nation and eventually the world.  Objectives ◦ Identify.

Slides:



Advertisements
Similar presentations
Project Scope-Creep Management
Advertisements

Dr. Les Wong President Mr. Gavin Leach, Vice President for Finance and Administration July 9, 2010 Budget and Tuition.
The Pit Crew: Strengthening the M&O and Facilities Parthership APRIL 3-6, 2013, LONG BEACH, CA.
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
INDUSTRIAL & SYSTEMS ENGINEERING
Team Members: Bryan McCormick (ME) Andy Freedman (ME) John Kreuder (ME) Ken McLoud (ME) Jon Holdsworth (EE) Gabriela Santa Cruz (IE) Thermoelectric Module.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
R·I·T Kate Gleason College of Engineering Design of a Tensile Load Frame for a Scanning Electron Microscope Senior Design Project Project Manager.
EDGE™ Concept Level Project Plan P0842X – LED Lighting Technologies Courtney Walsh (ME) Ian Frank (ME) Shawn Russell (ME) Matt Benedict (ME) Naresh Potopsingh.
P /20093 Composites Autoclave Brandon Allen (EE) Matt Brady (ME) Brian Cario (ME) Matt DiFrancesco (ME) John Mink (EE) ‏ Chris DeMinco.
FOUNDATION OF PLANNING
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
©1999, 2002, Joyce Bischoff, All rights reserved. Conducting Data Warehouse Assessments Joyce Bischoff Bischoff Consulting, Inc. Hockessin, Delaware
Presenter: Mike Elsholz Company: Steelcase Inc. History: 25 years experience Engineering Project Management Test Lab Supervisor Model Shop Manager Outside.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
How to Implement, Process and Administer the Preventive Action Process
Preventive Action Training
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
INTRODUCTION TO MANUFACTURING & OPRATIONS MANAGEMENT BY AMAR P. NARKHEDE.
Schreiber High School Middle States Implementation Progress Update.
Layout Strategy.
Office Layout Techniques and Space Requirements
Getting Staff Involved in Assessment at the University of Connecticut Libraries Brinley Franklin 17 August 2009.
สถานการณ์ ท่านดูรับผิดชอบเรื่องการ เตรียมการและตอบโต้ภาวะฉุกเฉิน ของหน่วยงาน ขณะนี้ท่านได้ จัดทำแผนเผชิญเหตุของ หน่วยงานเสร็จเรียบร้อยแล้ว ท่าน ได้รับคำสั่งจากหัวหน้าหน่วยงาน.
Lean Cell Advising Model NACADA 39 th Annual Conference Las Vegas, Nevada Lead Presenter, Jana Jacobs, Associate Director of Advising
R15701: ABVI Project Opportunities Sabrina Caliri, Thomas Visalli, Joseph Lee, Christine Lochner, Ian Nanney, Courtney Smith, Kenneth Wilkinson Voice of.
Do the algebra required to find a simultaneous solutions to these two equations (from last class): 3x 1 + x 2  3 x 1 + 3x 2  5 1.
ME 481 Mechanical Engineering Design Projects Project Management.
2  Mission Statement.  Company’s overall purpose and direction, products, services and values.  Goals.  That accomplish the mission. E.g. 5 year plan.
Mapping the Changing Technological Landscape: Faculty and Student Surveys on Educational Technology Cara Lane, Research Scientist Catalyst Research and.
ME Machine Shop Improvements: R Gap Analysis Rochester Institute of Technology has set a long term goal of having one of the top Mechanical Engineering.
Dragster Project: emphasis on control. Control The dragster project focuses on control Controlling electric motors is the basis for many applications.
Organising Operations. Managing Operations ► Operations managers organise the operations process. ► Communication, leadership and coordination are essential.
MANAGING TEACHER EVALUATIONS EFFICIENTLY TO MAKE INFORMED DECISIONS
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
Principal’s Meeting December 6, Budget Process Operating Budget: Senior Staff will work with Budget Directors to develop listing of system wide.
Bethune Middle School Technology Plan Presented by: William Carter E7801-Instructional Technology Planning and Management Dr. Regina Merriwether.
Module, Course and Unit Evaluations Module, course or unit evaluations give you the opportunity to make your voice heard by giving feedback about your.
Leading Effective Meetings By Jessica Kruse. Key Actions For Leading Effective Meetings  Prepare For a Focused Meeting Prepare For a Focused Meeting.
May 10, 2013P Xerox Bearing Tester Final Project Review.
CAP Strategic Plan CAWG UCC Aug 2015 Col Virginia Nelson.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
PLANT LAYOUT. Definitions In the words of James Lundy, 'Plant layout identically involves the allocation of space and the arrangement of equipments in.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
Pbworks.com How to use it?. In your Classroom Encourage student-centered learning. Even young students can build web pages, embed images & video, and.
Types of Supervisory Skills
Chairman Position Statement and 2016 Strategy and Priorities.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Perkins End of Year Evaluation Guilford Technical Community College.
P08452 Reciprocating Compressor Installation, Revamp, and Interface Installation Designed and prepared the installation guidelines and test cell setup.
Practical Library Assessment Stephen Spohn. About me Academic libraries University of Maryland - George Mason University - Northern Essex Community.
Perkins End of Year Evaluation Craven Community College.
Chapter 4 Assessment.
DEVELOPMENT Assessment Planning Design Reading Blueprints Funding
Describe the responsibilities of financial-information management in an organization
Professional Certificate in Supply Chain Management
Turbomachinery Flow Visualization P08453
The University of Jordan Mechatronics Engineering Department
Xerox Bearing Tester Final Project Review
Way to Determine the Layout of your Warehouse with Efficient Planning
How to Make the Most of your Kitchen with Space Saving Ideas
Community buildings in a changing landscape
ME Manufacturing Lab Renovation
Conducting Self-Inspections
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
P10457: D-R Process Improvement
Vacancies – Frame Assemblers
Final Project Plan P09004 – Eye Movement Tracking Device
Presentation transcript:

R14701: ME Machine Shop Opportunities

 Goal ◦ Top rated ME program and ME machine shop in the nation and eventually the world.  Objectives ◦ Identify characteristics of top rated university machine shops (i.e. capabilities, layout, procedures, usage trends). ◦ Identify potential areas for improvement based on these characteristics.

 ME Faculty/Staff ◦ Dave Hathaway, Rob Kraynik, Jan Maneti ◦ Machine Shop Committee ◦ Dr. Hensel  ME Students ◦ Graduate and Undergraduate ◦ Senior Design ◦ Clubs

Need #CategoryImportanceDescription CN1 Safety CriticalAll equipment and machines need to meet safety standards to avoid injuries. CN2CriticalMachine shop access needs to be limited to certified users to ensure user safety. CN3Important There needs to be enough professionally staffed hours to ensure the safety of the students and to give them adequate work time in the shop. CN4 Accessibility Important There needs to be time slots allocated for RIT clubs to work so that their time doesn't cut into that of other users. CN5Important There needs to be a readily available schedule that shows the availability of the machine shop so that users know when they can have access to the machine shop. CN6Critical There needs to be a way to limit the access of the machine shop to certified users so that non-certified users do not cut into the limited time that the shop is available. CN7 Layout Important Storage and assembly spaces need to be allocated for MSD teams to minimize clutter within the shop and maximize work space for each team. CN8ImportantThe flow of work through the machine shop needs to be efficient so that users' time isn't wasted. CN9 Capabilities Desirable There needs to be equipment and machines that expand the capabilities of the machine shop, allowing for a broader scope of projects (i.e., water-jet, vacuum forming, 3-D printing). CN10Important Students need to be taught on up to date equipment and machines to enhance their capabilities and have up to date skills. CN11Critical Increase the number of machines with CNC/ProtoTRAK capabilities so that students can learn modern techniques used in industry. CN12Critical The machine shop has to support both undergraduate and graduate needs which include class projects, senior design and research. CN13 Usage/Procedures ImportantUsage trends need to be better tracked to aid in scheduling and planning. CN14DesirableThe procedures for work requests needs to be more formal to better allocate machinists' time. CN15Critical A method for tracking individual machine usage needs to be put in place in order to determine what new equipment may need to be purchased.

 Changed focus to students ◦ Committee is focusing on faculty perspective.  Interested in helping? ◦ Please post on the discussion board with any comments or ideas.