DELIVERING BT’S 21 ST CENTURY NETWORK INDUSTRY WORKING GROUP ON MSAN ACCESS & INTERCONNECTION 22 October 2004.

Slides:



Advertisements
Similar presentations
Carrier Pre-Select Meeting BT Systems Interface Roadmap
Advertisements

Migration Considerations and Techniques to MPLS-TP based Networks and Services Nurit Sprecher / Nokia Siemens Networks Yaacov Weingarten / Nokia Siemens.
BTs Plans for its NGN EU Open Workshop on NGN Policy and Regulatory Issues 22 June 2005 Ittai Hershman Director, 21CN Commercial Development BT Wholesale.
BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Application-Based Network Operations (ABNO) IETF 88 – SDN RG
A Possible New Dawn for the Future GÉANT Network Architecture
GMI 2006 Carrier-Driven Interoperability February 2006.
Broadband and Wide Area Network Services Carrier Gigabit Ethernet Multi Protocol Label Switching Vs. IP VPNs T-1 & T-3 SIP Trunks Security Network Topology.
21CN: Thriving in the global economy Tim Hubbard Head of Technology and Platform Introduction.
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
Geoff Hammond Head of Revenue Assurance. Agenda Revenue Assurance & CRAB Focus PPC Circuit Validation PPC Radial Distance Validation Questions.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
Alcatel IP Network Division — 1 - Next Generation Services for IP/MPLS Core Networks- Iulian Costea Project Manager - IP Network Division
Thank you.
Doc.: IEEE /0407r0 Submission Andrew Myers, BT Slide 1 March 2004 WLAN Backend System Security and WLAN Interworking Security Andrew Myers British.
ZIGZAG A Peer-to-Peer Architecture for Media Streaming By Duc A. Tran, Kien A. Hua and Tai T. Do Appear on “Journal On Selected Areas in Communications,
Networking and Internetworking Devices Networks and Protocols Prepared by: TGK First Prepared on: Last Modified on: Quality checked by: Copyright 2009.
Peer-to-peer Multimedia Streaming and Caching Service by Won J. Jeon and Klara Nahrstedt University of Illinois at Urbana-Champaign, Urbana, USA.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
21CN Network Inventory Service Availability & Network Inventory Datasets 15 th September 2009 Paul Reed Owen Gardner Peter Davis.
Lucent Technologies – Proprietary Use pursuant to company instruction 1 3GPP2 Workshop MMD IMS Architecture June 28, 2005 Anne Y. Lee IMS Systems Engineering.
Next Generation Networks – delivering competitive advantage Neil McArthur Chairman, TalkTalk Technology.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
What is the PSBA Network? PSN Workshop Edinburgh January 21st, 2011 Andy Williamson – Office of the CIO Welsh Assembly Government.
Going faster and staying in control - Building the world’s biggest NGN Tim Hubbard Head of Technology Futures.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
Operation of vDLE concept Revised C&W proposal. Background C&W continue to believe that in the “virtualised” situation CPs should pay connection & rental.
Anthony Stephens 21CN Customer Engagement 1 21CN High Level Consultation Plan The following plan provides a four month view of key consultation themes.
MIGRATION PROPOSAL: CONSULTATION FRAMEWORK Dave D’Arcy This Presentation provides a generic view of feedback received from Communications Providers during.
NGN Interconnect Update JOINING THE THREADS 25 May 2005 FOR WG DISCUSSION ON 3 JUNE.
Equal Access: Space, Power & Common Infrastructure – LLU and 21C Gary Williamson Openreach LLU Business Improvement Manager January 2006 Queries to
BT Wholesale Customer Roadmap 1 st July 2008 Welcome Chris Booth Business Improvement Programme Graham Crane Consult21.
Narrowband & IP Strategy Steve Wickenden & Dave Hughes 12 November 1999.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Rajeev Bansal DGM (GSM & 3G), ALTTC, Ghaziabad
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Director Industry Development Jo Upward FORWARD LOOKING STATEMENTS – CAUTION ADVISED Certain statements in this presentation are forward-looking and.
Introduction to 21CN Resilience Tim Hubbard Head of 21CN Solutions Strategy.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
Interconnect Policy & Contract
Mazlan Sulong Department of Statistics MALAYSIA Census Data Capture MALAYSIA Population Census 2000 vs Population Census 2010 (proposed solution)
1 EBC Workshop Introduction and Welcome.
Pathfinder update webcall 15 th May 2009 Welcome to the BT's 21CN programme is subject to consultation and further development. Dates and other details.
Cloud of Clouds for UK public sector. Cloud Services Integrator.
PTCL Training & Development
1 FRIACO OFTEL INTERNET FORUM - 11 December 2000 Geoff Brighton JanWillem van den Bos.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 | © 2015 Infinera Open SDN in Metro P-OTS Networks Sten Nordell CTO Metro Business Group
CONSULT 21 Broadband and LLU Working Group BROADBAND AND LLU PRODUCTS - MIGRATION TO 21CN Ynyr Roberts BTW 16 th June 2005.
Consult 21 Update - Agenda Consult21 Steering Board Remit Membership Detail Recent and Future Meetings Programme Plans Nigel.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 14 – 03 November 2008 Information.
COS 420 Day 15. Agenda Finish Individualized Project Presentations on Thrusday Have Grading sheets to me by Friday Group Project Discussion Goals & Timelines.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Information in this presentation is subject to change NEXT GENERATION BROADBAND UPDATE Thursday 3 April 2008 Delivered over BT’s 21 st Century Network.
MSIL Discussion with Industry Steve Wright/Doug Harrison 11 th January Issue 1.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
1 EBC Conference Introduction and Welcome.
Introduction to Telecommunications, 2/e By M.A.Rosengrant Copyright (c) 2007 by Pearson Education, Inc. All rights reserved. Figure 28–1 A next generation.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005.
For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information.
INTERCONNECT WORKING GROUP 28 JANUARY 2005 BT’s Thinking about Next Generation Interconnect in 21CN DARYL DUNBAR HEAD OF 21CN CUSTOMER SOLUTIONS The information.
COR1000 Telecoms Project UK Link Committee Update May 2013.
Tim Wright BT’s 21st century network TRIS - TISPAN WG4 workshop on NGN Interconnection and Numbering Copenhagen 18 January CN Principal Consultant.
ETSI/TRIS Workshop on NGN Interconnection Effects of incumbent migration to NGN on competing networks Paul Rosbotham 18 th January 2006.
Presentation transcript:

DELIVERING BT’S 21 ST CENTURY NETWORK INDUSTRY WORKING GROUP ON MSAN ACCESS & INTERCONNECTION 22 October 2004

AGENDA INTRODUCTIONS PURPOSE OF THE WORKING GROUP BACKGROUND, VIEWS SO FAR, ISSUES DISCUSSION SUMMARY OF ACTIONS / NEXT STEPS

BACKGROUND BT’s POSITION TO DATE INITIAL INDUSTRY FEEDBACK ­ Metro-only interconnect could disadvantage PNOs who have built out ­ Pressure for MSAN interconnect BT’s DISCUSSIONS WITH VENDORS QUESTIONS ­ MSAN access or MSAN interconnect? ­ voice-only or broadband only? ­ all 5500 sites or just the 300 DLE sites? ­ how many PNOs? EQUIVALENCE ­ LLU ­ broadband dial-tone

MSAN Metro ConcDLE Tandem ~120 sites ~5500 sites ~70 sites ~300 sites ~5500 sites Neither At other POC sites At NGS Sites For discussion purposes only. No implementation assurance implied or intended

MSAN Metro ConcDLE Tandem ~120 sites ~5500 sites ~70 sites ~300 sites ~5500 sites For discussion purposes only. No implementation assurance implied or intended

MSAN Metro ConcDLE Tandem ~120 sites ~5500 sites ~70 sites ~300 sites ~5500 sites MSAN Metro ~120 sites ~5500 sites MSAN For discussion purposes only. No implementation assurance implied or intended

THE FOLLOWING SLIDES SHOW SOME POSSIBLE ACCESS AND INTERCONNECT SCENARIOS. THEY ARE FOR DISCUSSION PURPOSES ONLY AT THE WORKING GROUP LEVEL AND ARE NOT PROPOSALS.

NETWORK CHANGES BT’s MPLS core MSAN Metro Node Data Centre location Intelligence Call agents Mgt Local Conc TandemLocal Tandem Conc PNO Metro Node Ofcom request For discussion purposes only. No implementation assurance implied or intended

PoP MSAN Metro Node Metro Node APPROACH 1 - IP CONNECT AT MSAN PoP Other operator’s network Key: Physical BT Signalling PNO Signalling Media PNO signalling passed to BT CA. Media direct to MSAN LGW BT’s MPLS core MSAN Data Centre location Intelligence Call agents Mgt BT control of H.248 Gateway For discussion purposes only. No implementation assurance implied or intended

PoP MSAN Metro Node Metro Node APPROACH 2 - TDM CONNECT AT MSAN PoP Other operator’s network Key: Physical BT Signalling PNO Signalling Media BT’s MPLS core MSAN Data Centre location Intelligence Call agents Mgt MSAN MSAN sites which were formerly Concs parented on DLE are grouped together For discussion purposes only. No implementation assurance implied or intended

NETWORK TOPOLOGY – DLE EQUIVALENT Metro Router MSAN Lead MSAN at DLE (Non- Metro) site providing PNO Interconnect. PNO MSANs at “Child” Conc sites. Network may be subtended anyhow (in some cases, if cheaper – or needed for resilience). Subtending would be required in “DLE replace” cases. BT’s MPLS core Data Centre location Intelligence Call agents Mgt Call Server partitioned to match DLE. (Needed anyhow for migration & OSS support ?) For discussion purposes only. No implementation assurance implied or intended

PoP MSAN Metro Node Metro Node IP CONTROL OF H.248 GATEWAY ? PoP Key: Physical BT Signalling PNO Signalling BT’s MPLS core MSAN Data Centre location Intelligence Call agents Mgt PoP Other operator’s network For discussion purposes only. No implementation assurance implied or intended

DELIVERING BT’S 21 ST CENTURY NETWORK THANK YOU