High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
Advertisements

GLAST LAT ProjectCU Beam Test 11/8/2005 L. Latronico1 Glast LAT Calibration Unit Beam Test at CERN Overview of Tasks 11/8/2005.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectOct. 23, 2003 Page 1 EM-1 I & T Lesson’s Learned Need to define all documents / training required for I&T personnel –LAT-MD ,
LAT-TD GLAST LAT ProjectJune 28, 2006 Mechanical Systems GLAST LAT Mass Properties Test Readiness Review Mechanical Systems GLAST LAT Mass Properties.
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Installation Procedures/Orbiter Level Test Procedures Robert Goeke.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 GLAST-LAT Calibration Unit Shipment to SLAC Plan Review Luca Latronico Alessandro Brez Michele Pinchera
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 3 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Environmental Test Planning
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST LAT System Engineering
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Mechanical/Thermal Systems
Environmental Test Planning Meeting
GLAST Large Area Telescope
Integration and Test Organization Chart
LAT Environmental Test Planning and Design Review
Introduction and Overview
Design Integration and Analysis
Presentation transcript:

High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events

High Bay Operations2 GLAST LAT ProjectMarch 2005 LAT Environmental Test Activities Modal Survey Sine VibeEMI/EMC CL Install Radiators Acoustic L T-CycleT-Bal Remove Radiators Weight, CG Ship to GD CLLM Receive, Unpack L L LL Pack LAT A L Final CPT C Reference CPT Performed at SLAC C Aliveness Limited Performance Comprehensive Performance Muon Survey C A M Non-Test Events

High Bay Operations3 GLAST LAT ProjectMarch 2005 High Bay Operations to Support Non-Test Events Unpacking LAT Instrument from Shipping Container Installation of Radiator onto LAT Instrument Removal of Radiator onto LAT Instrument Packing LAT Instrument for Shipment

High Bay Operations4 GLAST LAT ProjectMarch 2005 Building A-59 - LAT Area of Operations LAT Area – approximately 40 ft x 60 ft floor area for assembly operations and storage LAT Clean Tent – approximately 15 ft x 16 ft floor area for assembly and functional test operations with additional “non-clean” area for EGSE LAT Clean Room – approximately 21 ft x 33 ft floor area T-Slotted Floor Area – approximately 25 ft x 25 ft available floor area for turn-over operations

High Bay Operations5 GLAST LAT ProjectMarch 2005 General Test / Activity Prerequisites Training and certification requirements –Crane operations –Contamination requirements –ESD Hazards Structural Oversight –Proof test of LAT MGSE –MGSE safety review Calibration –LAT EGSE system calibration –NRL data acquisition system calibration QA support and oversight Safety reviews and oversight

High Bay Operations6 GLAST LAT ProjectMarch 2005 Unpacking/Packing LAT Instrument Location – Building A-59 –LAT Area –LAT Clean Tent GSE Requirements –Overhead Crane (capacity 20,000 lbs) –Forklift (NRL) –LAT Lift Fixture (SLAC) –LAT Grid Perimeter Ring (SLAC) –LAT Test Interface Plate (SLAC) –LAT Test Base (SLAC) –Personnel Platforms (NRL and SLAC) –Facility Ground (NRL) Mechanical Configuration –LAT Instrument will be oriented with the Z-axis vertical (+Z up) throughout this operation Electrical Configuration –EGSE required for Limited Performance Testing following unpacking –EGSE required for Aliveness Testing following packing

High Bay Operations7 GLAST LAT ProjectMarch 2005 Unpacking /Packing LAT Instrument - continued Potential Obstacles –None Facility-Specific Issues –Overhead Crane (20,000 lb) will be used to support the unpacking operation –LAT Instrument must be protected from dust and particles before it is placed inside the LAT Clean Tent –LAT GSE can be stored in the LAT Area –EGSE can be stationed anywhere in the LAT Area adjacent to the LAT Clean Tent Issues –None

High Bay Operations8 GLAST LAT ProjectMarch 2005 Installation/Removal of LAT Radiators Location – Building A-59 –LAT Clean Tent –T-Slotted Floor Area GSE Requirements –Overhead Crane (capacity 20,000 lbs) –LAT Lift Fixture (SLAC) –LAT Dust Tent (SLAC) –LAT Grid Perimeter Ring (SLAC) –LAT Test Interface Plate (SLAC) –LAT Transport Cart (SLAC) –LAT Spacer/Test Stand for rotation (SLAC) –Personnel Platforms (NRL and SLAC) –Facility Ground (NRL) Mechanical Configuration –LAT Instrument will be oriented with the Z-Axis horizontal (+X up) while the radiators are being installed/removed onto/from the LAT Instrument Electrical Configuration –EGSE required for Limited Performance Testing and is stationed outside of the LAT Clean Tent

High Bay Operations9 GLAST LAT ProjectMarch 2005 Installation of LAT Radiators - continued Potential Obstacles –None Facility-Specific Issues –Both trolleys of the Overhead Crane (20,000 lb) will be used to support rotation of the LAT Instrument in conjunction with the LAT Spacer/Test Stand –Overhead crane will also be used for radiator installation –LAT Instrument must be protected from dust and particles before it is placed inside the LAT Clean Tent Issues –Need to develop rotation procedure by running pathfinder activities with the LAT Spacer/Test Stand and a mass simulator of the LAT Instrument in conjunction with the NRL crane