MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.

Slides:



Advertisements
Similar presentations
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Advertisements

2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
Line Efficiency     Percentage Month Today’s Date
7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Software and analysis Malte‘s Garfield isochronal Lines.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Calibration Malte‘s Garfield isochronal Lines and drift.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Overview of the MEG * CDCH * one of the following ( MEG UP MEG2 MEG + ) Marco Grassi on behalf of the CDCH Group.
Jan 2016 Solar Lunar Data.
FSC status and plans Pavel Semenov IHEP, Protvino

T1 status (a selection from EDR presentations)
IHEP group Shashlyk activity towards TDR
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Preparation of the CLAS12 First Experiment Status and Time-Line

Laboratory Directed Research and Development (LDRD) Proposal
Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com

Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16

Step 3 Step 2 Step 1 Put your text here Put your text here
Jan Sun Mon Tue Wed Thu Fri Sat
MEG DC HV supply preamplifier noise and DRS Input attenuation
m -> eg Drift Chambers

Electricity Cost and Use – FY 2016 and FY 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC.

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of the  target position e)schedule

DC gas Bag gas Sbag2 Sbag1 Vbubbler bubbler p bag p DC XRXR XLXL YOYO XL,XRXL,XR Y O,X R +X L P bag,P DC P bag -P DC Hood foil stability test a).1 mm not reached at flux changes b) V-bubbler successful c) X R,X L,Y O correlated  Larger forces on the foil  „vertical forces“, stabilize chamber width DC report june_04,J.E.

a)Larger forces on the frame  larger deformations b)How to get „vertical forces“ Control of the HV to avoid damages during quench a)Quench is relatively slow :  > > 1 sec b)To fast switch off (chamber HV) is also dangerous : RC(chamber) ~ 10  s c)  switch off time ~ 100  s We think about ways to test the behavior to quenches, as soon as the Al-frame full size prototype will be completely available DC report june_04,J.E.

Mounting of Cathode foils c) Cut foil  vertical miniforce on the foil Also z-stability better (^  expansion coef  b) Position (.1 mm) stretched foils and glue them on frame and ROHACELL DC report june_04,J.E. a) Stretched carbon fibers(1000x d=6  m) and deformed ROHACELL Pretension forces on frame to simulate carbon fibers and foils, glue fibers

Mounting of Hood foil Largest height Not disturbing the cell To do better: Stretch „vertically“ and fix the width a)Modify the shape of the hood to have a larger flat surface to glue b)Machine a foam structure in ROHACELL 30 c)Adapt the cathode foil procedure Only minor modifications to the previously designed tools DC report june_04,J.E.

Stesalit 110 mm 199 mm331 mm basis wings Carbon fibers Frame shape a)fix dimensions of foils  order b)Only wing print + built in LV supply cable c)carbon fibers solution (  ) and price d) modify frame shape to correct in first order for: basis shape ( first cell) frame height (foil height) edge angle (gluing) tested DC report june_04,J.E.

 target position a)Without knowing the exact spectrometer resolution build a target with holes of different sizes b)Knowing the exact spectrometer resolution optimize the size of a series of holes and slits on the target to clearly see the holes without loosing too much intensities Since the non stopped  seem to have a larger probability to contribute to the background, the edge of the target will not be sharp enough. DC report june_04,J.E.

Test Milestone AssemblyDesignManufacturing Full Prototype Medium PrototypeCharge division & Cosmics Full Detector (18 DC) Drift Chamber Full Prototype Beam test Full Prototype Charge division & Cosmics Medium Prototype Full Detector (18 DC) outside inside COBRA Inside COBRA Full Size Prototype

Mod tools Test Milestone AssemblyDesignManufacturing Drift Chamber outsideinside COBRA Inside COBRA Feb Mar Apr Mai Jun jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Mai Jun Jul Aug Order Delivery Foil frames tests Other Prints1 Print anode1 Simul,design Preamp cable Full Size Prototype,Al Tests anode Full prototype Full Detector (18 DC) Beam,quench support Inside COBRA calibration DC report june_04,J.E. cosmics beam

2004 JFMAMJJASOND Beam Time MEG Prac MEGGotta COBRA Calibration (Wed) Beam Line Commiss. Part 1 Platf. Drift Chamber Proto type Timing Counter Test Mechan. Matching LPT Neutr. BG PM + Src Inst Pi- Beam Test Liq. Purif. Full Calorimeter Trigger DAQ Test

JFMAMJJASONDJFMA Beam Time ShutdownMEGGotta?MEG Shutdown COBRA Field Map Beam Line BTS Test Commiss. Part 2 Full Beam Line Test Drift Chamber Mounting Mounting & Testing Timing Counter BG Test BG Test Inst LPT PMT testing + calibration Full Calorimeter Cryo. Installation Crane+ Tent Assembly Studies (Wed + remote) Test Trigger Inst DAQ DC Electr. Inst