ADAZI LSA AT/FP FOLLOW UP VISIT 6 & 7 JUNE. ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE.

Slides:



Advertisements
Similar presentations
Report # Downed powerline inhibits fire attack. Report Number: Report Date: 11/13/ :35.
Advertisements

Authenticity Attraction Zoning Fort Jesus, Mombasa, Kenya Public Use Planning, Module 4 World Heritage Sites of Portuguese Origin.
/0403 Copyright ©2004 Business and Legal Reports, Inc. BLRs Safety Training Presentations Transportation Security TrainingPart II 49 CFR
PROPOSED SECURITY MEASURES David Gourley Elementary.
Seven Bar Safe School Presentation Jan. 15, 2013.
M3 - 1 The Road to Skilled Driving April 2006 Chapter 2 Signs, Signals and Roadway Markings.
Second Phase Metropolis Towers Chromium Cleanup Presentation to Residents September 4, 2013.
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Fleet Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental.
Utility Vehicle Safety
Chapter 7 Negotiating Intersections
Instructor SSG JOHNSON
Chapter 10: Negotiating Intersections
ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER.
Fire Marshal & Medical Emergency Training Please Sign In
But fines vary depending upon location. WHY ARE THOSE CHAIRS THERE?
NORTHFIELD COMMUNITY SCHOOL Elementary School Entrance Cedarbridge Road Side NORTHFIELD POLICE NJ 1.
Contractor Safety Training] Contractor Safety Training What's New – What's Hot.
TAPA BARRACKS AT/FP EVALUATION 5 JUNE 12.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
UKATA EMERGENCY PROCEDURES These slides are designed to assist UKATA members in the delivery of Category A – Asbestos Awareness Training when dealing with.
(Smart Loop System) Installation Guide. Rev B Shipping Box Contains Everything that is included in the box being shipped to a customer should contain.
Walking Surfaces Paving the Way to Success. Where the Sidewalk Ends…  Thousands of employees, guests and tenants are injured each year by a trip & fall.
WHAT TO DO IF PULLED OVER BY AUTHORITIES IN THE UNITED STATES.
Three Lines of Defense Presented by the Arapahoe County Sheriff’s Office.
AMARI AIR BASE AT/FP EVAL 9 JUNE (No photos taken due to tight security)
Highway Incident Safety For Emergency Responders
Fog and Smoke Crash Response Dangers. Motorist Dangers Obscures: Road Surface (ahead) Lane Markings Traffic Queue (stopped vehicles) Crashed Vehicles.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Scene Safety – Apparatus Positioning at Roadway Incidents Procedure: –4.1 Safety Premises Emergency personnel are at great risk while operating.
HOMELAND SECURITY ADVISORY SYSTEM. Established after the terrorist attacks on America September 11, 2001.
Let’s have a quiz! Let’s see how much you know about the volunteer team? (Li) Traffic Guidance Group.
Student(s) Drop Off and Pick Up Our goal is to make the school community safer.
Heath and Safety Contractor Induction. AUTHORISATION TO WORK I On arriving at site, please contact your host via Reception Your host will provide a full.
Range Exercise Schematics Layout / Description. Preparation of the Student Deliver briefing on each exercise to be performed and learning outcomes. Establish.
UNCLASSIFIED 1 AS OF: 7 June 2012 UNCLASSIFIED “Strength Through Partnership” MG Piggee COL Sirel UNCLASSIFIED US National.
 Ensure the scene is setup for a safe successful outcome  Request the necessary resources  Access and extricate the injured  Transport all patients.
Site Layout constructionsite.
Southampton Boldrewood Innovation Campus Event Management Process Are you a member of Engineering and the Environment No Yes Booking rooms as a Non Faculty.
Tennessee Baptist Site Security Training Course 3 Copyright Permission obtained from original author Gerald T. Aitken of Maybrook NY
Animal & Bylaw Services Community Clean Up Events.
This is…. $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 LawsVH PolicySignsPotent Potables.
NC State Highway Patrol (SHP) In Highway Scene Management.
Aircraft accident investigation immediate response presentation First response has, by its very nature, a dichotomy of purpose, and agenda, among those.
Safety Signs. Traffic Light Ahead Slow down and prepare to stop.
Riders Who Act and Behave as Vehicles Fair Better Road Riding Procesures EVVEMA Bike Team.
Workplace Examinations. Daily Workplace Examinations Who is responsible for making workplace examinations?
Conformal Coat Quality issues Update of November 3, 2004.
Incident Management Assistance Patrols (IMAP) In Highway Scene Management.
CPNZ Basic Training 011 – Vehicle Accident ‘Crash Plan’
2016 Contractor Safety Training What's New – What's Hot.
Fireground Operations: Staging Union County SOG 3.24.
VEHICLE SAFETY. INTRODUCTION VEHICLE MEANS ANY MOTORIZED EQUIPMENT USED FOR THE TRANSPORTATION OF A PERSON / PEOPLE OR CARGO. INCLUDES CARS, TRUCKS, BUSES,
Montana Driver Education and Training Traffic Control Devices and
2014 Contractor Safety Training What's New – What's Hot
ELECTRICAL CIRCUITS AND OHM’S LAW
To do your best you must…
IPLOCA HSE Workshop July 01, 2015
Post Trip Inspection (Delivery)
WHAT TO DO IF PULLED OVER BY AUTHORITIES IN THE UNITED STATES
Why we need post construction cleaning? By TODAY’S.
August Safety Tips James Madison University
Visitor Management at Fossil Creek
Signs, Signals and Roadway Markings
MOT Training for Incident Responders in Florida
WHAT TO DO IF PULLED OVER BY AUTHORITIES IN THE UNITED STATES
Science of Crime Scenes
Workplace Examinations
Observers of the Month July 2013 Restricted.
Science of Crime Scenes
Training Presentation Truck Controller- Surfacing
Presentation transcript:

ADAZI LSA AT/FP FOLLOW UP VISIT 6 & 7 JUNE

ADAZI LSA AT/FP ISSUES NOTED ON 2 JUNE: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER TRASH PILE SMOLDERING APPROX 65’ FROM FUELLER – PILE CONTAINS CANISTERS AND OTHER DEBRI FUEL TRUCK FOUND UNATTENDED OUTSIDE THE WIRE MOTOR POOL OUTSIDE THE WIRE, WITH ONLY 3 SIDES C WIRE – OPEN TO LOCALS NO GUARDS POSTED AT MOTOR POOL RUN-DOWN RESIDENTIAL AREA IN THE VICINITY OF THE LSA & MOTOR POOL DERELICT/ABANDONED BUILDINGS IN THE AREA, OUTSIDE THE PERIMETER LSA IS OUTSIDE OF MAIN INSTALLATION AND EASY TO APPROACH FROM ALL SIDES

FOLLOW UP: BOXES AND DEBRI ON ROAD TO LSA – POTENTIAL IED PLACEMENT ________________________________________ Boxes were still there. The site ATO was informed of the need for HN to remove the boxes.

BOXES NEED TO BE REMOVED

FOLLOW UP: MULTIPLE HOLES & BREACH POINTS IN ALL SIDES OF PERIMETER ______________________________________________________________________ C wire was unavailable. It will arrive around 15 June (too late). Engineer tape was placed across holes & breach points as a deterrent. HN stepped up patrols around the LSA. HN stated they would fill the holes and breach points. U.S. personnel began daily perimeter inspections. Lights were emplaced around the perimeter. Interior perimeter was cordoned off with engineer tape as a deterrent.

LIGHTS & ENGINEER TAPE

FOLLOW UP: TRASH PILE SMOLDERING APPROX 65’ FROM FUELLER – PILE CONTAINED CANISTERS AND OTHER DEBRI ________________________________________ Trash pile was removed by HN, and the area was cleaned up.

FOLLOW UP: FUEL TRUCK FOUND UNATTENDED OUTSIDE THE WIRE ______________________________________________ Fueller was moved away from the trash pile area on 2 June. On 6 June, it was again found unattended, and this time, ungrounded. This was brought to the attention of on-site Commander. On 7 June, the fueller was found attended and grounded. Note: now that the trash pile has been removed, the fueller will be moved back to original location.

FOLLOW UP: MOTOR POOL OUTSIDE THE WIRE, WITH ONLY 3 SIDES C WIRE – OPEN TO LOCALS NO GUARDS POSTED AT MOTOR POOL ________________________________________________________________________________ Motor Pool found in the same condition on 6 June. None of the vehicles were locked. The on-site Commander had locks issued by 7 June. C wire not yet available

FOLLOW UP: RUN-DOWN RESIDENTIAL AREA IN THE VICINITY OF THE LSA & MOTOR POOL DERELICT/ABANDONED BUILDINGS IN THE AREA, OUTSIDE THE PERIMETER LSA IS OUTSIDE OF MAIN INSTALLATION AND EASY TO APPROACH FROM ALL SIDES ________________________________________________________ HN increased patrols in the LSA & Motor Pool areas. On-site ATO placed derelict/abandoned buildings off- limits. On-site ATO developed an in-processing brief to inform Soldiers of AT/FP issues at the site.

FOLLOW UP: INCIDENT UNKNOWN PERSON(S) AT AN UNKNOWN TIME ACCESSED THE INTERIOR OF THE LSA AND SPRAY PAINTED GRAFFITI ON ONE OF THE TENTS. DISCOVERED DURING WALK AROUND THE PERIMETER ON 2 JUNE. ________________________________________ It was determined the graffiti on the tent was old. The tent did not belong to the U.S. This is no longer considered to be an incident.

ADAZI MAIN INSTALLATION AT/FP ISSUES: MAIN GATE: HAS ONLY DROP BAR BARRIER POV’S PARKED IMMEDIATELY OUTSIDE THE GATE NO SERPENTINE TO SLOW TRAFFIC NO SEPARATE VEHICLE SEARCH LANE INTERIOR: ORDINANCE USED AS DECORATION THROUGHOUT THE INSTALLATION

FOLLOW UP: MAIN GATE: HAS ONLY DROP BAR BARRIER POV’S PARKED IMMEDIATELY OUTSIDE THE GATE NO SERPENTINE TO SLOW TRAFFIC NO SEPARATE VEHICLE SEARCH LANE ________________________________________ The gate remains the same, however, parking in the lot by the gate has been limited.

FOLLOW UP: ORDINANCE USED AS DECORATION THROUGHOUT THE INSTALLATION ________________________________________ There is an EOD school on the base. On 7 June, they were conducting training with K-9 and robots. The ordinance was inert, and used for training purposes.

FOLLOW UP DIRECTION TO ON-SITE ATO: Immediately request HN remove the boxes near the motor pool. Follow up on HN fixes to the perimeter holes. Request HN post “KEEP OUT” signs around the LSA and Motor Pool in local language. Ensure Fueller is grounded & attended. Ensure Motor Pool is guarded & vehicles locked. *Provide a daily report to AT/FP at Tapa by 0930hrs.

Contact information for AT/FP SFC White: Local cell: Personal cell (German) Or