NLC MAC Meeting 6-8 Nov. 2002 Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,

Slides:



Advertisements
Similar presentations
NLC - The Next Linear Collider Paul Czarapata Engineering Test Facility What is it and what does it do?
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
Issues of stability and ground motion in ILC Andrei Seryi SLAC October 17, 2005 Selected pages from: Full talk at
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
Linac Girder R&D C. Boffo – F. Le Pimpec Slide 1 LINAC GIRDER R&D C. Boffo (FNAL) - F. Le Pimpec (SLAC)
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
F D. Finley / Fermilab FARDOG / January 4, FARDOG 04JAN01 Discussion of FY01 Budget and Goals for RF Structures.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
Measurements of stray field in the NLCTA area Josef Frisch, Peter Tenenbaum, Tor Raubenhemier.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
Harry Carter 05/10/02 Slide 1 NLC - The Next Linear Collider Project Linac Girder Studies and Plans NLC MAC Meeting May 9-11, 2002 Linac Girder Studies.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Update of master schedule and report from SLAC G. Riddone
Next Linear Collider 8-Pack Project D. Atkinson System Review, April 3 The 8-Pack Project at NLCTA An overview of the status and schedule for the project.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
ILC Damping Rings Mini-Workshop, KEK, Dec 18-20, 2007 Status and Plans for Impedance Calculations of the ILC Damping Rings Cho Ng Advanced Computations.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
Next Linear Collider 8-Pack Project D. Atkinson MAC Review, May 2002 The 8-Pack Project at NLCTA An overview of the schedule and budget for the project.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
Gravity load on SAS – comparison between real and mock-up April 13 th, 2016.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
Real-Time FOS monitor DEPFET PXD and SVD Workshop in Göttingen E. Currás, D. Moya, I. Vila, A. L. Virto. Instituto de Física de Cantabria (CSIC-UC ) G.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Jaak Lippmaa HIP, Helsinki University
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Complementary ISTC Projects #3888, 3889p
Module roadmap to end of 2017
Performance of an Automated Water Based Cooling System for CBM MuCh
WP1 Metrology & Alignment
Gingin Advisory Committee Meeting 08 Dec 2009
Beam-Based Alignment Results
LARP Rotatable Collimators for LHC Phase II Collimation
ILC Main Linac Superconducting Splittable Quadrupole
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
Undulator Integration Test Status
Fixed Support Design & Testing
Physics Requirements for Conventional Facilities
Alignment Diagnostic System Status
Presentation transcript:

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab, Technical Division RF Technology and Development Group

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 2 OUTLINE  Strongbacks for NLCTA  First delivery (FXB001/2)  Near future plans (FXB003-12)  NLC Girders development  Stability Measurements  Vibrations – HLS – Movers – FEM/FEA  Schedule & Budget

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 3 Strongbacks For FXB002/3  SLAC Style  Fit up to 2 structures or 1 structure + instrumentation  Maintain the same beam line length as SLAC strongbacks in NLCTA

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 4 Strongbacks For FXB002/3 Mockup Instrumentation from SLAC Shipping supports

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 5 Strongbacks ->NEXT STEP  Extend the strongback to accommodate 3 structures with the minimum impact on the NLCTA setup  Reduce the length of the drift pipes; add bellows to compensate for thermal deformations (3 mm) ~94” FXB004FXB005FXB006 eyelet Available space 89”

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 6 NLC Girder Development  Stability measurements  Vibration measurements  Motors and gears  HLS  FEM / FEA Simulations

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 7 Stability measurements (SM)  Study the effect of thermal cycles on the girder assembly. (started in 1998 C. Adolphsen) GOALS Investigate about the sensitivity of the girder + structures complex to thermal variations due to the water cooling and heat generation.

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 8 SM Single station test

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 9 SM Mockup in MP8 In the process to: Calibrate and align the sensors. Connect the water system. Test the electronics and DAQ. Mockup in MP8 Wire connection Water connections PLANS Reproduce SLAC measurements and improve the setup by substituting: actual tubes -> dummy structures with disks with the same Inertia as C type actual 4.5 m support -> 6 m long girder

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 10 Long term plan: Upgrade this mockup by steps in order to create a real girder “NLC style” fully instrumented to perform all needed tests SM Mockup in MP8

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 11 Vibrations Collaborate with SLAC (Seryi, Le Pimpec) to: Perform vibration measurements on the Girder complex. Determine effect on stability due to water cooling system on FNAL structures. Transmission of vibrations to quads Hardware: Geophones DAQ system Software: SLAC Labview applications

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 12 Motors and movers Build a complex of 2 cams system to: Understand the limits of the application Perform tests on hardware Perform tests and familiarize with controls Actual quote: 2 stepper motors$ 5000 x 2 2 gear boxes$ 2500 x 2 control system$ 1000 $ 16,000

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 13 Hydrostatic Level System Contacts with groups at FNAL and SLAC that use HLS to monitor ground motion in tunnels. Need to build know-how in adapting the devices to work on girders COSTS: Sensors (4) $ 2,500 / each Software $10,000 $20,000

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 14 SIMULATIONS Create solid model of structure on strong back using TD resources Involve FNAL PPD group for finite element analysis Perform thermal and mechanical stress analysis Perform vibration modes analysis As soon as we converge on a design for Girders extend simulations on the full complex Verify FEA results with experimental data where possible PLANS No work as been pursued in this direction yet. Need to generate a solid model first in order to begin the process. STATUS

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 15 ACTIVITIES AND BUDGET FY03 Budget for girders and strongbacks $50K Stability measurements $ 10K (5K) Movers$ 20K HLS$ 20K Strongbacks production$ 10K (2K) Simulations ? Spent

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 16 SCHEDULE NLCTA STRONGBACKS: Build and deliver strongback for FXB003 01/03 Design and build strongback for FXB004/5/6 04/03 Build and deliver strongback for FXB007/8/9 07/03 Build and deliver strongback for FXB010/11/12 10/03 SLABILITY MEASUREMENTS: Complete calibration and start routine measur. 01/03 Implement FXB dummy structures 04/03 Implement 6m long “static” girder 07/03 VIBRATION MEASUREMENTS: Start measurements on dummy structures 01/03 MOVERS – HLS – SIMULATIONS: Depending on FUNDING and TIME availability

NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 17 SUMMARY Work on girder development has begun at FNAL Just as everyone else we are experiencing funding limitations. Time and engineering resources are limited due to the involvement in other projects. Future work on NLCTA strongbacks for the 8 pack test will not require significant engineering resources.