1 Water Budget Update ESHMC Meeting November 22-23, 2010 S. Taylor, B. Contor.

Slides:



Advertisements
Similar presentations
Hydrologic Analysis for CAMP Environment, Fish and Wildlife Working Group Briefing for ESHMC May 6, 2008.
Advertisements

February Offerred by: C.E. Brockway Brockway Engineering Jim Brannon Leonard Rice Engineers, Inc John Koreny HDR Inc Willem Schreuder Principia.
1 Recharge on Non-irrigated Lands ESHMC 8 January 2008 B. Contor.
1 One-month Stress Period Considerations Presentation to ESHMC 8 January 2008 B. Contor.
Perched River Seepage ESHMC Meeting January 13-14, 2009 Stacey Taylor.
Using the Best Science to Estimate Consumptive Use March 12, 2010.
Restructuring the contract: The Nez Perce and Strawman proposals & modeling Snake River socioeconomic tradeoffs Richard Slaughter, Richard Slaughter Associates.
2006 Idaho Climate and Water Resource Forecast Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
Idaho Water Resources Research Institute
World Wide Web1 Applications World Wide Web. 2 Introduction What is hypertext model? Use of hypertext in World Wide Web (WWW) – HTML. WWW client-server.
Chapter One Hydrologic Principles Flashlight and globe.
Idaho Climate and Water Resource Forecasts for the 2005 Water Year October 26, 2004 Sponsored by: The Climate Impacts Group (CIG) at the University of.
ESHMC Meeting 6 May 2008 Stacey Taylor. Overview Model river representation in ESPAM 1 What data is available to make changes for the new stress periods.
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
Water Budget Status Report ESHMC Meeting September 13, 2011 Presented by Stacey Taylor.
Snake River Plain Model Upgrade Base Case Scenario Donna M. Cosgrove Idaho Water Resources Research Institute University of Idaho.
Thesis and Publication Style Statistical Editor, Journal of Oral and Maxillofacial Surgery, Statistical Editor, Journal of Oral and Maxillofacial.
Water Use and Management WHO – 1,000,000,000+ people lack access to fresh water 10,000,000+ people die annually from water- related diseases.
Integrated Water Management Modeling Framework in Nebraska Association of Western State Engineers Spring Workshop Salt Lake City, Utah June 9, 2015 Mahesh.
Digital Data Collection Training April 7, Abt Associates | pg 2 Contents Preparing Your Computer Protecting Data Entering Data Into Forms Saving.
Return Flows Discussion Continued ESHMC Meeting 6 May 2008 Stacey Taylor.
Honorable Eric J. Wildman, SRBA District Court Chris M. Bromley, Deputy Attorney General* * All opinions expressed herein are those of the presenter and.
Summary Utility ESHMC August 2008 B. Contor. Background ESPAM.exe produces intermediate text files –*.celmodel cell dimensions & status –*.cnlcanal leakage.
Management Application: Volume of Water in Storage (An Ogallala Example with Applicability to All Aquifers in Texas) Judy A. Reeves, Ph.D. Hydrogeologist,
January 29, 2013 Lake Diefenbaker Reservoir Operation Proposed Operating Manual Development.
Understanding Ground Water Modeling Gary Johnson Donna Cosgrove Idaho Water Resources Research Institute University of Idaho Idaho Falls.
Eastern Snake River Plain Comprehensive Aquifer Management Plan (CAMP) Progress Report ESHMC January 13, 2009.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
1 New Scenario: "Current Policy" or "Continued Changes in Practice" ESHMC Meeting 13 November 2007 B. Contor.
Snake River Plain Model Upgrade Donna M. Cosgrove Gary S. Johnson Idaho Water Resources Research Institute University of Idaho.
Intro to Google Docs Table of Contents Video What is Google Docs? What can you do with it? Creating a new document Uploading an existing document.
Idaho Water Supply Outlook IDWR State Water Supply Meeting Jan 12, 2012 Current Conditions & New Normals Maybe new normals also means new peaks and new.
Presented By: David Richards Idaho Falls Water Superintendent MUNICIPAL WATER RIGHTS A LOOK AT HOW THE CONJUCTIVE MANAGEMENT RULING IMPACTS TODAY’S MUNICPAL.
ESPAM2 Water Budget Status ESHMC 21 September 2010 B. Contor.
RIV61 RIVER PACKAGE The purpose of the River Package is to simulate the effects of flow between surface-water features and groundwater systems. For each.
Analytic Vs Numeric Ground Water Models Ray R. Bennett, PE Colorado Division of Water Resources.
South Platte Decision Support System Colorado Water Conservation Board and Division of Water Resources.
Adjusting Supply and Demand: Technical Analysis to Support the ESPA Management Plan Idaho Water Resource Board Meeting May 17, 2007.
Mountain Home Plateau Ground Water Conditions and Management Activities Presented to the Idaho Legislature Natural Resources Interim Committee By Helen.
The Theory of production
Return Flow Discussion ESHMC Meeting 6 March 2008 Presented by Stacey Taylor 1.
How to Map Irrigated and Non-Irrigated Land on the Eastern Snake Plain Aquifer Quickly, Easily, and Well How to Map Irrigated and Non-Irrigated Land on.
Prioritization Review ESHMC August 2008 B. Contor 1.
CENG 476 Projects 2014 (10’th November 2014) 1. Projects One problem for each student One problem for each student 2.
Final Project I. Calibration Drawdown Prediction Particle Tracking
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
College of Engineering/ College of Agricultural and Life Sciences Department of Biological and Agricultural Engineering Historic Irrigation in the Snake.
WEAP Demand Management
1 Canal Seepage ESHMC 8 January 2008 B. Contor. 2 Outline Current treatment of Canal Seepage Review of Recharge Tools PEST Possibilities Implications.
Use of groundwater modeling to support aquifer management and conjunctive administration in Idaho Presented at 2015 Association of Western State Engineers.
Surface-Groundwater interactions on the Eastern Snake River, ID.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Colorado Public Meeting
Update on EAA Groundwater Modeling Initiatives Presented by: Geary M
Presented by Jon Traum, P.E.
River Stage and Bottom Elevation
Creating a Generalized Hydrologic Water Budget for Cache Valley, UT/ID
ERO Portal Overview & CFR Tool Training
SUNY Pre Award and Compliance Systems Institutional Review Board (IRB)
Regional Hydraulic Model for the City of Austin
To the ETS – Encumbrance Online Training Course
Welcome! To the ETS – Encumbrance Certified Copy of Encumbrance
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
Welcome! To the ETS – Encumbrance Certified Copy of Encumbrance
Word: References & Workflow Participation Project
To the ETS – Encumbrance Online Training Course
Chapter 5 Sources and Sinks
How to add a photo gallery in html/css
Systems and Components – A Process for Developing the Total Water Budget Handbook for Water Budget Development - With or Without Models CWEMF 2019 Annual.
State of Calibration for California Central Valley Groundwater-Surface Water Simulation Model (C2VSim) CWEMF 2019 Annual Meeting Folsom, CA Presenter:
Presentation transcript:

1 Water Budget Update ESHMC Meeting November 22-23, 2010 S. Taylor, B. Contor

2 STATUS OF DESIGN DOCUMENTS

3 Documents Completed and Posted: –Canal leakage (*.cnl) “Representation of Recharge from Canal Leakage for Calibration of Eastern Snake Plain Aquifer Model Version 2, As Built, Revision 1” Link: mentation/ESPAM2_Canal_Leakage_Design_Doc_ASBUILT_Rev1_ pdf –Perched river seepage (*.pch) “Estimating Perched River Seepage in the Big Wood River, Little Wood River, Big Lost River, Little Lost River, Birch Creek, Medicine Lodge Creek, Beaver Creek, and Camas Creek for Calibration of the Eastern Snake Plain Aquifer Model Version 2” Link: mentation/Perched%20River%20Seepage%20design%20doc%20final.pdf –River cells “Representation of MODFLOW-2000 River Cells for the Snake River above Milner Dam and American Falls Reservoir for Calibration of the Eastern Snake Plain Aquifer Model Version 2; As Built” Link: mentation/Final%20River%20Stage%20ESPAM%202%20Design%20Doc%20AS%20BUILT.pdf

4 Documents Completed (but not posted): –Stress Periods “Decisions on Stress Periods to be Used in Calibration of Eastern Snake Plain Aquifer Model Version 2” Link: Unable to find on website as of and “ESPA Model Files” appears to currently have a broken link. –Irrigation Sources “Determination of Source of Irrigation Water for Calibration of Eastern Snake Plain Aquifer Model” Link: Unable to find on website as of and “ESPA Model Files” appears to currently have a broken link.

5 Documents currently being reviewed by IDWR: –Diversions and returns (*.div) –ET on irrigated lands (*.eti), Entity file/ET adjustment factors (*.ent) –Sprinkler fractions (part of *.ent) –Fixed point pumping (*.fpt) and Offsite pumping (*.off) –Irrigated lands (*.iar); also incorporates RED –Tributary underflow (*.trb) –Soil groups (*.sol) –Precipitation (*.pre)

6 Design documents to be written by IDWR: –Model grid/boundary (*.cel) –MKMOD: irrigation efficiency parameters (*.eff), model specification file (*.mdl) –Non-irrigated recharge (*.nir) ??

7 NEW DATA

8 New Data E100910A –First “non preliminary” water budget E101014A –New ibound (one cell different) –Remove out-of-bounds Fixed Points –Restore 1986 irrigated lands (correct problem above rim) –Add new 2002 irrigated lands data set This is where we left off last mtg.

9 New Data (cont.) E101027A –New ET Adjustment Factors E101028A –Discarded E101028B –Formatting correction to *.cel file Allan may be using a version of E101027A that he corrected himself; it would be identical in function and water budget content to E101028B

10 MKMOD

11 TOOLS FOR MKMOD INPUT FILES MODFLOW TARGETS Basic Data MKMOD PEST Tools Uniform Input Files

12 Generation I: ESPAM1.1 Google Images

13 Limitation: 255 Stress Periods

14 Generation II: ESPAM2 “Fix” (Contor et al) Google Images

15 Generation II: ESPAM2 “Fix” (Contor et al) Google Images

16 Generation III: ESPAM2 Ad Hoc/Pet Grade methods Google Images

17 Generation IV: IDWR Professional-Grade Stand Alone Tools Google Images

18 Status: Tools will preserve existing file formats. IDWR has a full set of test input data. IDWR has a full set of sample output data. IDWR is working on the first tool in the suite.

19 TRAINING

20 Goals Full transparency on Water Budget How to make Input Files How run MKMOD How to run MODFLOW How to extract results from MODFLOW How PEST does its Magic

21 Goals Full transparency on Water Budget How to make Input Files How run MKMOD How to run MODFLOW How to extract results from MODFLOW How PEST does its Magic

22 Goals Full transparency on Water Budget How to make Input Files How run MKMOD How to run MODFLOW How to extract results from MODFLOW How PEST does its Magic IWRRI January 2011

23 Goals Full transparency on Water Budget How to make Input Files How run MKMOD How to run MODFLOW How to extract results from MODFLOW How PEST does its Magic IWRRI January 2011 Primarily IDWR. Awaiting Tool Completion

24 Input Needed January 2011 training piggy-back onto ESHMC training? One day live, in person? GoToMeeting followup, if needed?

25 ESPAM2.0 FINAL REPORT

26 ESPAM1.1 Final Report: 1 5/8 inches, 3 1/2 pounds.

27 Plan for ESPAM2.0 Final Report Use ESPAM1.1 report as a foundation Update and change only what needs to be changed IWRRI will do the first draft Review protocol to be determined by IDWR Final publication as IDWR product

28 Presentation Format Product 1: “Track Changes” version Product 2: “Changes Accepted” version

29

30

31

32 Status About halfway through first draft of main body –Selected invitations for input/review of particular sections –Anyone who wants to wade through it all is welcome Not started on Tables Not started on Figures Not started on Appendices

33 DISCUSSION