303 Third St, Cambridge, MA Brian Tufts Structures Option Advisor: Dr. Ali Memari 4/14/08.

Slides:



Advertisements
Similar presentations
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Advertisements

Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Thesis 2005 Cira Centre – Philadelphia Structural Redesign of Lateral Force Resisting System Andrew Kauffman Structural Option.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Traci Peterson Structural Option Senior Thesis Presentation The Del Monte Center at The North Shore The Pennsylvania State University Department of Architectural.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Swedish American Hospital Heart and Vascular Center Philip Frederick Structural Option AE Senior Thesis 15 April 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Agricultural Hall and Annex Easting Lansing, MI
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Ryan Johnson - Structural Option
Acterna Headquarters John M Sekel Germantown, Maryland
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

303 Third St, Cambridge, MA Brian Tufts Structures Option Advisor: Dr. Ali Memari 4/14/08

Architecture Overview Urban setting near M.I.T. Must appeal to affluence Technology area Contrast of materials Terra-cotta Metal paneling Creates it’s own world with U footprint and green space centrally located 3 levels of parking below grade Retail on the ground level Apartments start on the ground floor

Building Programming Total Building Area: 830,000 SF Residential Area: 595,000 SF Retail Area: 8,000 SF Parking: 215,000 SF North Building Area: 327,000 SF North Building: 292 Units 41 Studio 650 SF EA Bed 850 SF EA Bed 1200 SF EA 12 3 Bed 1550 SF EA

Overview of Building Systems Structural Composite steel framing 3 ¼ LWC on 3” 16 ga composite metal floor deck Electrical 2 primary power distribution boards (2) 300 kVA transformers provide 120/208V to panels Backup power via 750 kW generator Mechanical 2 cooling towers each for north and south building totaling ~150,000 CFM per building 5 water cooled AC units service lobby and fitness areas 14 rooftop air conditioning units service corridors 4 boilers totaling 23,300 MBH

Thesis Objectives Evaluate an alternative floor framing system using open- web steel joists Compare seismic performance Reduce lateral framing Reduce gravity columns Check vibration performance Explore fireproofing issues Compare cost savings Mechanical Breadth – Building Envelope Efficiency Check envelope performance with Massachusetts Energy Code Propose 2 pane window to increase envelope performance Compare cost of two systems and energy performance

Massachusetts State Building Code Sixth Edition Based on Building Officials and Code Administrators National Building Code – BOCA 1993 Key differences from ASCE 7 ◦Wind – The reference wind velocity for each wind load zone is the “fastest-mile” wind velocity, in miles per hour, at 30 feet about the ground  Pv = 90 mph for Cambridge, MA  Reference wind pressure for Exposure C = 31 psf  Resulting story shear is less conservative than BOCA ◦Seismic - Equivalent Lateral Frame Method – BOCA  R = 5.0 for Concentrically Braced Frames  R = 4.5 for Ordinary Moment Frames  Effective peak acceleration: Av = Aa = 0.12g for all of Massachusetts  Ct = 0.20

Typical Composite Steel Framing Beam Spacing: 12.5’ (Typ) with 18’-1” span Girders typically span 25’

Typical Bay Framing Typical Bay – Composite Steel Typical Bay – Steel Joists

Lateral Frames Along Line E Composite SteelSteel Joists

Lateral System & Gravity Column Comparison Cost: $3500/Ton for steel and erection in Boston, MA

Typical Bay Comparison

Ceiling Sections

Fireproofing

Vibration Analyzed the typical bay for walking excitation and a future office occupancy Typical joist is 12K1 Typical girder is VLH24 Δj = in Δg = in f n = Hz a 0 /g = < 0.005

Depth Study Summary Open-web steel joists would save initial costs in column steel and lateral framing members. Steel joists are also cheaper to frame than composite steel framing. Vibration is not an issue for this application of steel joists as the typical bay is more than adequate for walking excitation. If the 12’ floor-floor height is adequate, alternate fireproofing detail would alleviate issues related to the application of cementitious fireproofing. Open-web steel joists are a viable alternate framing system for 303 Third Street.

Mechanical Breadth Study – Building Envelope Typical Wall Sections

Wall U-Values Calculated using the ASHRAE Handbook of Fundamentals

Energy Compliance Check Specified walls and ¼” clear float glass fail energy compliance check by 30%

Proposed Two Pane Window Increase building envelope efficiency by 14% Cost roughly $45/SF including framing and installation, compared to $35/SF for single pane windows Image courtesy of

Conclusions Open-web steel joists are a viable alternative floor framing system Two pane glass may be necessary to meet minimum energy code and result in a 14% increase in envelope performance for 303 Third Street Increased envelope performance will help obtain LEED points under the Optimize Energy Performance section of the LEED Reference Guide A decrease in window area and an increase in wall insulation will increase envelope performance, but has architectural and apartment rent ability implications.

Thanks McNamara/Salvia Inc. Consulting Engineers - Boston, MA Mark Aho, P.E. John Matuszewski, P.E. Adam McCarthy, P.E. Robert McNamara, P.E., S.E. Joseph Salvia, P.E. William Waterston, AIA - Wiss, Janney, Elstner Associates, Inc. – Cambridge, MA Hank Klein - Extell Development Company –Boston, MA Andrew Copelotti - Equity Residential –Boston, MA Mark Pasciuto - Bovis Lend Lease LMB, Inc.– Boston, MA Woth Ngan - Bovis Lend Lease LMB, Inc.– Boston, MA Martin Turnbull – AHA Consulting Engineers – Lexington, MA The AE Department Friends and Family who supported me while preparing this thesis

Questions?