7/17/2002R. Henning -- TRD Gas Slow Control1 TRD Gas System Slow Control at MIT- Cambridge AMS TRD Meeting, CERN, July 2002 U. Becker, B. Demirkoz, P.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

AMS operations on March 5-10 Mike Capell. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada JMDC new program and files (power steps) Cai,
F.R.Spada – INFN Rome I The TRD of AMS-02 on the International Space Station Francesca Spada University of Rome La Sapienza & INFN Rome I for RWTH Aachen,
Results from first tests of TRD prototypes for CBM DPG Frühjahrstagung Münster 2011 Pascal Dillenseger Institut für Kernphysik Frankfurt am Main.
AMS Software Review ACC Slow Control Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining.
Mechatronic Modeling: Pretensioner Mechanism Simulation Analysis as part of a Retractor Mechanism. 04/19/2006 Guillermo Cazares.
Pressure Measurement By Manometer
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
1 Why have we chosen to use the serial port, when it is more complicated and offers fewer connections than the printer port? For a beginners’ course using.
G O D D A R D S P A C E F L I G H T C E N T E R 1 The Trade Between CCSDS and HDLC Framing on Global Precipitation Measurement David Everett and Jonathan.
GC-HR-ToF Instrument overview 7/16/2015 JDC. Instrument Systems.
TRD GAS Refill Version 3, 13th June 2013 K. Andeen, B. Beischer, Th. Kirn, A. Putze, G. Schwering, Th. Siedenburg I. Phys. Institute B 1.
TRD DAQ (U) Software Status TIM CERN May.09 Chanhoon Chung, Mark Millinger, Andreas Sabellek IEKP - Universität Karlsruhe (TH)
16 – 17 Jul 02Andrew Werner TRD Monitor Tube Readout Electronics: Shaping Peter Fisher, Bernard Wadsworth, Andrew Werner MIT 1.
Progress Report on CGSE Control System Project Team of SJTU for AMS-02 Yang Yupu AMS JSC, Jan 8-12, 2007.
7/17/02Reyco Henning -- TRD Box S Component Testing 1 TRD Box S Solenoid Valve Testing AMS TRD Meeting, CERN, July 2002 U. Becker, G. Carosi, R. Henning,
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
Transition Radiation Detector Gas Slow Control System AMS-02 A. Bartoloni a, B.Borgia a, S. Gentile a G. Amelino Camelia a, S. Baccaro b, C. Bosio a, C.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
Topic: Pressure (and Partial Pressure) Do Now: Convert the following units of pressure 249 torr to atm Pa to kPa 2534 kPa to mmHg.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
AMS TIM July, 2008 – CERN 1 AMS 02 –Thermal Control System Design AMS-02 Thermal Control System (TCS)
A.Kounine 13 Jan 2007Flight Software Status1 JSC 13 January 2007 Andrei Kounine / MIT.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
C 3 F 8 detection in N 2 pixel volume environment Rusty Boyd, Martin Doubek, Jan Godlewski Greg Hallewell Sasha Rozanov,Vic Vacek ATLAS ID Sonar Coolant.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Presenter Date Page 1 October 30, 2006 Pre-decisional. Internal Use Only Design Overview Ground Side Flight Side Interface Seal GH 2 Vent Disconnect.
Qualification Test of UFE Board  Schematic diagram of UFE  Board types and current status  Qualification test procedures  VA & UFE test setup 
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
The AMS Transition Radiation Detector and the Search for Dark Matter Gianpaolo Carosi Lab for Nuclear Science, MIT The AMS Collaboration Lake Louise Winter.
UG-crate status AMS TIM - CERN - 15/4/2008 A.Bartoloni, B.Borgia, F.R.Spada* INFN Roma.
TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:
INSE lecture 18 – Embedded systems  what they are  hardware for embedded systems  kernels for embedded systems  building embedded systems  testing.
To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.
09/02/20121 Delay Chip Prototype & Delay Chip Test Board Joan Mauricio – Xavier Ondoño La Salle (URL) 12/04/2013.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Original CPC Box schematic
Overall method Rigorous procedures for reporting and monitoring Set up a complete Budget framework Budget broken down per responsibility - e.g. buyers.
AMS TRD GAS SUPPLY SYSTEM BOX_S Mechanical Structure Corrado Gargiulo* Robert Becker** *INFN Roma1 **MIT CERN, July AMS TRD GAS SUPPLY SYSTEM.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
Date of download: 7/5/2016 Copyright © ASME. All rights reserved. From: New Liquid Transfer Active Balancing System Using Compressed Air for Grinding Machine.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
Evolution of the gas system control for flight
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Energy Level Arrangements
IBBelle: Status & Plans
Magnet cryogenic system update.
Date of download: 11/2/2017 Copyright © ASME. All rights reserved.
AMS 02 Electronics TRD Crate Arrangement
StratoBuoy II Matt Voll Brian Mayernik Pat O’Hara.
(bx•Qb)in Ubx QAWO (AWOx •QAWO)in AWO (bx•Qb)out
Status of muon monitor R&D and construction
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Schematic diagram of the cryogenic system
Status of CC-PC Evaluation Board
Presentation transcript:

7/17/2002R. Henning -- TRD Gas Slow Control1 TRD Gas System Slow Control at MIT- Cambridge AMS TRD Meeting, CERN, July 2002 U. Becker, B. Demirkoz, P. Fisher, R. Henning, B. Monreal.

7/17/2002R. Henning -- TRD Gas Slow Control2 Overview Help Design and Build Control Systems for TRD Gas System Prototype and Flight Systems. 1.Prototype System oTested Mixing Program for Prototype Box S using USCM V02. 2.“Commercial Version” oTest Software and Electronic Prototypes (Roma) for Whole Gas System using USCM V03 3. Flight System

7/17/2002R. Henning -- TRD Gas Slow Control3 TRD Gas System Overview TRD 300 Liters Manifolds Box C Box S CO psia psia Mixing Vessel 200 psia Figure 1: Schematic Arrangement of the TRD gas system. All pressure are given at 25 o C. Xe 1550psia

7/17/2002R. Henning -- TRD Gas Slow Control4 Prototype System (1) USCMV02 Box S Prototype RS-232 DOUT Currently Used in Closed System Test (B. Monreal) ADC Power Drivers

7/17/2002R. Henning -- TRD Gas Slow Control5 Prototype System (2)

7/17/2002R. Henning -- TRD Gas Slow Control6 Electronics for Commercial System 2 x USCMV03 EPP Koutsenko CAN Interface + Guido Board CAN LVDS UGBS UGBC, etc. (Roma) Commercial Gas Systems Under Construction Develop Flight Software Control Commercial Gas Systems Mixing Program

7/17/2002R. Henning -- TRD Gas Slow Control7 Box S Electronic Simulator Roma

7/17/2002R. Henning -- TRD Gas Slow Control8 JMDC Power Emergency Operations AMS/ISS Operator USCM Crate Electronics CAN LVDS Mixing Program -Simple Operations -Continuous Monitoring Gas System Flight System

7/17/2002R. Henning -- TRD Gas Slow Control9 - Mixing Program On Ground and JMDC - Following Sequence: 1.Start with Known Mixture in D Vessel. Vent D if mixture unknown. 2.Fill required partial pressure of CO 2 3.Fill required partial pressure of Xe. 4.Vent to Box C when required. - Minimize ground communication -Gas Transfer Controlled by Time Valve is Open. -Timing of Valve operations performed by UGBS, not USCM! Mixing Operation

7/17/2002R. Henning -- TRD Gas Slow Control10 We Appreciate the Help of: Volker Commichau Klaus Hangarter Clemens Camps Alexei Lebedev Vladimir Koutsenko

7/17/2002R. Henning -- TRD Gas Slow Control11 Box S Signals and Power

7/17/2002R. Henning -- TRD Gas Slow Control12 TTT Xe Bottle : 1550psia CO 2 Bottle 940psia V10a V1a V20a V3a V4b V4a V5 V3b V2a V20b F3a P1a V2b V1b P2b RV3-300psi V10bD Vessel (Mix) F1a O1a 60cc 30cc P1b T P2a 7 liters per day to Box C O1b F2a F3b F2b15cc 30cc VG1a VG1b F1b Figure 2: Box S Diagram RVG1b-1200psi RVG1a-2800psi CO 2 Xe Ground Equipment V17a V17b O2a O2b

7/17/2002R. Henning -- TRD Gas Slow Control13 Box S Pinout

7/17/2002R. Henning -- TRD Gas Slow Control14 TRD Segment n n =1 to 41 From Gas System To Gas System PMnB PMnA VMnAVMnBVMnCVMnD 430 cu. in (7 liters) OMnAOMnB Manifolds

7/17/2002R. Henning -- TRD Gas Slow Control15 Monitor Tube CO 2 Analyzer P5 RV4 – 29psig P3 CP2CP1 V8BV8A RV5-200psig P4 To Manifold From Manifold Figure 3: Box C From Box S (From V4a) From Box S (From V4b) V18aV18b V6bV6a V9a V9b