AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
EUDET FEE status C. de LA TAILLE. EUDET annual meeting 6 oct 08 cdlt : FEE statrus 2 EUDET module FEE : main issues 2 nd generation ASICs –Self triggering.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
Scintillator Tiles and Test Beam Plans Calice Collaboration Meeting – Casablanca 2010 Christian Soldner Max-Planck-Institute for Physics.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
Organization for Micro-Electronics desiGn and Applications Ludovic Raux OMEGA microelectronics group Ecole Polytechnique & CNRS IN2P3
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
CALICE/EUDET FEE status C. de LA TAILLE. 31 aug 2009 EUDET SC meeting Status of JRA3 Front End Electronics 2 ILC front-end ASICs : the ROC chips SPIROC.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
CALICE/EUDET FEE status C. de LA TAILLE. 16 jun 2009 TB meeting FNAL ASICs for CALICE/EUDET 2 First generation ASICs Readout of physics prototypes (ECAL,
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
LED notched fibre system short HBU0 party with QMB6
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
HCAL task status report
Testbeam Timing Issues.
Scintillator HCAL readout
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
STATUS OF SKIROC and ECAL FE PCB
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Scintillator HCal Prototype
Presentation transcript:

AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 2 Outline > Hardware Status  New AHCAL Modules  Surface Mount HBU (SM_HBU)  Scintillator ECAL-BU (EBU) > Testbeam Preparations  Multichannel Gain Equalization  Autotrigger Threshold  Time (TDC) measurements in SP2b  Power Pulsing (optional) Assembled tiles below HBU2

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 3 New AHCAL Modules > 6 new HBUs realized: 4 testbeam, 1 SPIROC2c, 1 spare module > 10 new DAQ setups (CIB, POWER2, DIF2, CALIB2) realized. > 4 HBUs equipped with tiles and in steady operation. Modules work fine!

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 4 New AHCAL modules (CERN testbeam specific) Side Interface Board and Testbeam Extender Module > 4 SIBs and 4 Extenders realized. > Extender tested: OK! > Full setup including SIB can only be tested in final testbeam cassette: Foreseen end Sept. Extender SIB

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 5 Surface Mount HBU (SM_HBU) > Idea: MPPC is part of the HBU: Easy assembly in one step. > Scintillator has curvature: Improvement of light uniformity. > NIU – DESY collaboration. SM_HBU

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 6 Surface Mount HBU (SM_HBU) Idea Reality

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 7 Surface Mount HBU (SM_HBU) SM_HBU backsideSM_HBU front-side > 2 SM_HBUs realized: 1 works fine, 1 has a broken SPIROC (to be replaced) > 12 MPPCs on MPPC Adapter available (from NIU), 1 assembled > Setup for SM_HBU with DAQ allocated, Scintillator not equipped.

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 8 Scintillator ECAL-BU (EBU) > 4 EBUs in production (boards ready, in assembly at DESY). > Commissioning at DESY with AHCAL HBU DAQ and Labview software. > Assembly of MPPC strips and scintillators afterwards. > Foreseen for electron testbeam at DESY in October (Shinshu Univ.). MPPC flexlead strips (Shinshu Univ.)

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 9 Testbeam Preparations Testbeam at CERN beginning of Nov > 4 HBU2s in 1 layer. > Labview DAQ. > Details: See AHCAL session (Benjamin). > 4 HBUs equipped with 2 batches of tiles: gain of 3 HBUs: gain of 1 HBU : > Due to the large gain spread: Channel gain equalization necessary.

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 10 HBU2 Channel Gain Equalization > Step 1: Measure the Single Pixel Spectra (SPS) of each channel with the integr. LED system. Extract from the SPS the channel (SiPM*Preamp) gains. > Compare with the ITEP gain measurements (results correlated?). Gain equalization: Oskar Hartbrich

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 11 HBU2 Channel Gain Equalization > Step 2: Adjust the SPIROC2b preamplifier gain per channel (trade-off between SPS resolution and dynamic range in high-gain mode). > Step 3: Check results by additional LED calibration run. > Gain equalization works fine for all 4 modules.

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 12 Autotrigger Threshold and Noise > In autotrigger mode, a trigger threshold (DAC) must be defined for SPIROC2b, which is aimed to be set to a signal amplitude (ADC) of ½ MIP. > Relation: trigger threshold DAC setting to ADC signal amplitude: > The ADC-DAC relation depends on the SPIROC2b preamplifier (PA) setting and the input pulse shape. Difficult to define a single trigger threshold setting for all channels of one SPIROC2b. Preliminary: MIP~500 ADC tics, Pedestal ~240 ADC tics  ½ MIP ~ 370 ADC tics  Trig. threshold ~ 250 DAC tics DESY testbeam data

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 13 Time measurement (TDC) in SPIROC2b Charge Injection Setup and prepared Operation Modes: > ILC Mode: Clock = 5MHz, achieved resolution (single channel): ~ 350ps > Testbeam Mode: Clock = 250kHz, resolution (single channel): ~ ns > For details: See report from Eldwan Brianne “Studies of the front-end electronics of the Analog HCAL”

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 14 TDC: Time Walk and Channel-to-Channel Spread > SPIROC2b channels show significant amplitude-dependent time-shifts and channel-to-channel differences. > Difficult to parameterize because of different behaviours. Channel-wise TDC calibration necessary as for ADC (MIP calibration)?

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 15 TDC: Considerations > Use integrated LED system for channel-wise TDC calibration. High statistics needed! To be analyzed. > Use em-shower. > For CERN testbeam use Testbeam Mode:  Smaller TDC dead-time (<2% instead of 30% in ILC mode),  event validation (rejection of noise trigger) is only possible in Testbeam Mode,  TDC ramp-to-ramp spread is negligible.

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 16 Power Pulsing (PP) > Aim: Switch on as short as possible before data taking starts (initial idea: 20µs). > Single-Pixel Spectra measurements show a reduced amplitude with PP. For this PP measurement, the filter capacitors on the SPIROC2b bias points were still in. Results without capacitors will follow.

Mathias Reinecke | CALICE meeting Cambridge | Sept 18th, 2012 | Page 17 Conclusions > 6 new HBUs have arrived, 4 are assembled with tiles and are in operation. Preparation for testbeam at CERN ongoing. > 2 SM_HBUs are ready for operation. 12 MPPC modules available. > EBU vertical is in the last steps of production. > SPIROC2c is assembled to one HBU, but still not working. Bad slow-control programming assumed. > CALICE DAQ development is interrupted, we await eagerly the publication of the new software framework. SPIROC2c on HBU2