STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.

Slides:



Advertisements
Similar presentations
Solomon William KAMUGASA
Advertisements

Silvia Zorzetti. PACMAN CLICScientific ProjectThe Team PACMAN (Particle Accelerator Components Metrology and Alignment to the Nanometer Scale) Ph.D. training.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
H. SCHMICKLER Alignment challenges for a future linear collider.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
STABILIZATION ACHIEVEMENTS AND PLANS FOR TDR PHASE CLIC MAIN BEAM QUADRUPOLE MECHANICAL STABILIZATION K. Artoos, C. Collette, P. Fernandez Carmona, M.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
PACMAN Error Inventory OUTLINE The PACMAN task The Inventory of contributors The Evaluation Method Critical Areas Outcome 08/10/2015 by Iordan Doytchinov.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
Introduction to the PACMAN project A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific goals.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
PACMAN : technical objectives Hélène Mainaud Durand.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Permanent Magnet Dipole Feasibility Proposal
ALIGNMENT OF THE NEW TRIPLETS
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Stages for the SSW translation system for PACMAN
Ddd 4-Slides Challenge Silvia Zorzetti.
WP1 Metrology & Alignment
List of changes and improvements for the next generation CLIC module
Need for Alignment Position of off-momentum proton w.r.t. beam
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Alignment challenges for a future linear collider
Presentation transcript:

STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand

2 Meetings on the final PACMAN bench integration -Launched beginning of May -See Indico: -Objectives: -to agree on a general concept of bench, -to prepare the data needed for the designer, -to prepare the compatibility tests needed, -To define a clear schedule and the associated responsibilities. -To launch the design & procurement

3 What we want to reach Preparation of the bench: -P1: To fix the BPM on the MB quadrupole in its linearity range, through a rigid link -P2: To support the MB quadrupole + PBM on the nano-positioning system -P3: To equip the common support with sensors interfaces and fiducials, as foreseen in CLIC -P4: To pre-align the whole assembly within 5 DOF at a micrometric resolution, within a few mm, manually

4 What we want to reach Bench measurements: M1: To power & cool down the magnet (if needed: results known in month) M2: To determine the magnetic axis of the quadrupole and the electromagnetic axis of the BPM, using a CuBe wire dia. 0.1 mm o By displacing the wire o By displacing the whole assembly (possible on a very small stroke: few µm) M3: To determine the relative position of the magnetic axis, w.r.t the electromagnetic of the BPM, via CMM measurements M4: To determine the position of the magnetic axis of quad and electromagnetic axis of the BPM w.r.t. external fiducials, via CMM measurements M5: To characterize the environment M6: To perform additional tests (using the nano-positioning system) as: o Determining the resolution of the BPM o Determining the resolution of the determination of the magnetic axis o Repeatability measurements of the determinations

5 What we want to reach Bench measurements: M7: FSI and µ-triangulation measurements (TBC) M8: characterization of the environment with a seismic sensor Compatibility tests between the systems will be organized ASAP. The whole system will be assembled and tested in the ISR8 before being displaced in the metrology lab. Measurements in the metrology lab as fast/effective as possible

6

7 Requirements (metrology lab) Leitz Infinity: Volume of measurements: 700 mm (height) x 1000 mm (width) x 1250 mm (length). In addition, the table is longer by 25 mm on each side. There is a possibility to screw on the CMM table a longer plate that would support the PACMAN test bench, but there could be some issues concerning vibrations. The CMM table has got threaded holes that could be used to clamp the wire stages. Maximum load admissible: 1 t (but there are some possibilities to go up to 2 t) CMM table Measurement room Outside the measurement room Measurement room: Limited T° dissipation

8 Requirements (magnetic measurements) Outside the measurement room

9 Requirements (magnetic measurements) Displacement tables: NI M605 (current one): 0.2 µm of bidirectionnal repeatability, travel 50 mm Newport VP 25X: ± 0.7 µm, travel 25 mm Determination of the magnetic axis by interpolation & scaling from different measurements The wire is put in place according to the offsets obtained from the interpolation, using the displacement tables. The wire is measured at different positions, and its final position is obtained by interpolation (as the magnetic axis). Open points: Replacement of opto-coupler (small range of measurements) Lock-in amplifier? Improvement of the tensioning stepper motor

10 Requirements (BPM measurements) CMM table Outside the measurement room To be shared with Domenico (and David?)

11 Requirements (BPM – MB quad interface) BPM requirements: The flanges are not brazed on both sides and can be adapted. The BPM can be mounted on the two sides, with a preference to attach the dipole mode cavity directly to the quadrupole, as the measurements will be performed with that cavity. On the dipole mode cavity, 90° adaptors on the 4 guides could ease the access Definition of the linear zone: ± 300 µm around the electrical zero (valid only with that wire). Taking into account the manufacturing tolerances, the electrical zero and the mechanical axis should not be far away: within ± 5 µm. (to be cross-checked via measurements) Nano-positioning requirements: The BPM shall not vibrate with modes below 100 Hz and should be attached to the quadrupole via a support bringing high stiffness. A flexural stiffness of 50 N/µm has been computed by David (with a safety factor of 10).

12 Requirements (BPM – MB quad interface) Design of the interface: Solution proposed by Iordan integrated a flange + pipe around the wire that is no more needed, and was hyperstatic The vacuum pipe foreseen for CLIC will have a butterfly shape. It could be replaced for PACMAN by a “standard” pipe. Given the distance between the BPM and quadrupole, we could have quite an important angle between both components axes. Different designs could be proposed: o A BPM + a long vacuum pipe that would be inserted inside the quadrupole, and then holds using an external fixation o Use of pins to fix the BPM on the magnet, with a kind of shim to put in place the BPM, that would be removed afterwards o Use of a kinematic mount to attach the BPM The different options will be pre-studied by Kurt with the help of Raphaël Leuxe and presented in the next integration meeting.

13 Requirements pre-alignment interface Requirements: Manual adjustment according to 5 DOF of the MBquad assembly, with a resolution of a few µm Existing design: Open points: Upper plate to be adapted to the nano-positioning system Is the resolution sufficent (will not cover the stroke of the nano-positioning system)? Details drawings to be finished

14 Compatibility with CMM requirements No problem of weigh No problem concerning the width Height to be checked Length is a concern  optimization concerning the marble supporting the stretching devices displacement tables

15 Next steps Gather the last requirements: Micro-triangulation & FSI system Seismic sensor Pre-alignment sensor support & fiducials Propose a concept of the interface MB quadrupole – BPM Define & organize the compatibility tests needed, Define a clear schedule and the associated responsibilities Launch the design & procurement