Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Issues of stability and ground motion in ILC Andrei Seryi SLAC October 17, 2005 Selected pages from: Full talk at
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
July 7, 2008 SLAC Annual Program Review Page 1 Andrei Seryi, SLAC American Regional Team leader for BDS Deputy of ATF Spokesperson for ATF2 Global Design.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
February 26, 2007 Global Design Effort 1 Most recent in Beijing BDS/IR talk, February 4, 2007:
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
Global Design Effort BDS updates SLAC 1:30 Monday meeting Andrei Seryi November 5, 2007 Previous update – August 20, 2007.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
ILC MDI Andrei Seryi JAI with input from many colleagues working on MDI IWLC
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Design Effort Beam Delivery System design and EDR, Introduction Andrei Seryi, SLAC BDS Kick-Off meeting, October 11-13, 2007.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
November 07, 2006 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei.
February 05, 2007 Global Design Effort 1 Beam Delivery System R&D S4 Task Force Chris Damerell, Hitoshi Hayano, Marc Ross Deepa Angal-Kalinin, Andrei Seryi,
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
March 3-6, 2008 Global Design Effort 1 BDS way forward summary for GDE-BDS Andrei Seryi, SLAC Thanks to all participants of GDE-BDS and ACFA-MDI sessions.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Global Design Effort Beam Delivery System Summary Andrei Seryi, SLAC ALCPG/GDE meeting October 25, 2007.
Beam Delivery system design and plans Andrei Seryi SLAC on behalf of BDS design team ILC08 and LCWS08 17 November 2008 Illustration of beam dump with double.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Beam delivery and ATF2 Andrei Seryi SLAC October 1, 2008.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
Status of GDE BDS Design Talk based on several talks presented by BDS area leaders Andrei Seryi, Hitoshi Yamamoto, Deepa Angal-Kalinin at and after Vancouver.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
SLAC 1:30 Monday meeting June 18, 2007 A.Seryi
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
Accelerator R&D for the Super-B Factory
CLIC-ILC BDS & MDI work.
Beam Delivery System Schedule at ILC2010
Andrei Seryi Materials for discussion TILC-08
BDS EDR Discussion EDR Organisation? Discussion of WP distribution
Presentation transcript:

Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto and for BDS group

June 2, 07 Global Design Effort BDS 2 Work at this meeting ATF2 Project meeting on May 31 –~20 presentations focused on various aspects of hardware status and commissioning BDS and MDI reports (~30) –summary of MDI part to be reported tomorrow by Brett Parker And discussion of EDR plans

June 2, 07 Global Design Effort BDS 3 Focus of EDR work EDR planning – focus on cost uncertainty reduction, & performance uncertainty reduction: –design of systems at appropriate level of details –build & test critical prototypes to ensure performance Major focus in EDR phase will be on system engineering, integration and value engineering Schedule: take full schedule into consideration (~3year for EDR, two years for Approval phase and 7 years for construction) –continue optimization and final design after EDR and during earlier years of construction

June 2, 07 Global Design Effort BDS 4 Interfaces & specs Definition & optimization of interfaces is very important part of EDR work and of the overall optimization Interfaces & specs for technical systems –performance –connections –functionality … Interfaces for beam parameters

June 2, 07 Global Design Effort BDS 5 Interfaces for beam parameters These are interface beam parameters This list is not complete and also may not have corresponding match in the linac outgoing beam parameters Standard list of interface beam parameters need to be developed, made consistent, and optimized at the overall level

June 2, 07 Global Design Effort BDS 6 BDS – CFS optimization Clarification & optimization of requirements and interfaces with CFS design will be the major focus of EDR work –sizes, volumes, length, T stability, air, water, penetrations, etc.

June 2, 07 Global Design Effort BDS 7 Reviews Overall project reviews –reviews of the BDS within the overall ILC –is a tool for overall optimization –driven by Project Manager Reviews within BDS area –reviews of BDS technical subsystems => to verify maturity of design and directions of design optimization –reviews of interfaces => overall optimization –driven by area managers

June 2, 07 Global Design Effort BDS 8 Environment: EDMS The new workspace is oncoming Should be effective tool to store documents, drawings, tables of interface parameters, will allow to control the work-flow, to make assignments of the tasks, and so on example of possible flow of a document in EDMS

June 2, 07 Global Design Effort BDS 9 Balance of R&D and engineering Integrated design of IR, development of IR superconducting magnets, build engineering prototype of FD magnets, design study to ensure IR mechanical stability, design of push-pull arrangements development of crab cavity systems, test phase control system with two single cell cavities, build single multi-cell cavity design, construction, commissioning and operation of ATF2 test facility develop laser wires for beam diagnostics, prototype laser wires at ATF2 development of intra-train feedback, prototype at ATF2 develop beam dump design & study of beam dump window survivability develop collimator design, verify collimation wake-fields & beam damage development and tests of MDI type hardware such as energy spectrometers, IP feedback BPMs, beamcals, etc. and the design work, which does not involve hardware development but use results of the above listed work (hardware in italic) from S4 & RDB report Increased engineering efforts in all these activities, plus overall system engineering and integration of BDS

June 2, 07 Global Design Effort BDS 10 Overall tentative schedule of EDR work in BDS

June 2, 07 Global Design Effort BDS 11 QD0 partQF1 part door central part Should allow switch of detectors and opening on beamline without disconnection Concept of cryo configuration For IR integrated design, the goal, in a nutshell, is to evolve from cartoon-concept level schemes like the one above, to detailed 3d drawings of the system

June 2, 07 Global Design Effort BDS 12 IR integration, a start new force neutral antisolenoid (old location)

June 2, 07 Global Design Effort BDS 13 FD & IR cryo design, start Service cryostat & cryo connections BNL

June 2, 07 Global Design Effort BDS 14 Workshop on ILC Interaction Region Engineering Design SLAC, September 17-21, 2007 Goal: To review and advance the design of the subsystem of the Interaction Region of ILC, focusing in particular on their integration, engineering design and arrangements for push-pull operation. … goal is to make progress on the design of the ILC IR through focused preparation before and during the workshop… The International Program and Advisory Committee is being formed. Its charge includes organization of preparatory work before the workshop and production of conceptual solutions and drawings that could be further discussed and reviewed at the workshop… –this is an attempt to align the organization of the workshop with EDR organization

June 2, 07 Global Design Effort BDS 15 IR Eng. workshop: tentative working groups Group A Overall detector design, assembly, detector moving, shielding. Detector design for on-surface assembly and underground assembly procedures. Beamline pacman shielding, detector shielding design. Group B IR magnets design and cryogenics system design. Cryogenic system design, connections, flexible cryo lines, safety issues. IR magnet engineering design, support, integration with IR, masks, Luminosity & Beam calorimeters, deign of IR vacuum chamber, connection to elements, assembly-disassembly procedures, integration of near IR masks and overall integration of crab cavity. Group C Conventional construction of IR hall and external systems. Lifting equipment, IR electronics hut, cabling plant, services, shafts, service caverns, utilities, movable shielding; design solutions to meet alignment and vibration tolerances Group D Accelerator and particle physics requirements. Including masking, collimation, shielding requirements, image charges, wakes, external radiation, accelerator physics & optics design and constraints on IR engineering design, on alignment tolerances and stability for the IR components and IR hall floor. Working groups are to study the issues in advance of the workshop

June 2, 07 Global Design Effort BDS 16 Summary EDR work in BDS will focus on cost uncertainty reduction, and performance uncertainty reduction Major focus in EDR phase will be on system engineering and value engineering The major breakdown of Work Packages become clearer and the fine structure being worked on