Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public Utility Commission of Texas for the 2013 ERS Program Year.

Slides:



Advertisements
Similar presentations
Welcome to SMD Installed Capacity Market with UCAP & GADS.
Advertisements

January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
ERS Update Presented to: Demand Side Working Group December 5, 2014.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
NERC LTRA Update / CDR Capacity Counting Issues
Proposal to Modify ERS Time Periods 2014 DSWG Goal #10 Presented to: Demand Side Working Group.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
ERCOT Emergency Interruptible Load Service EILS Technical Workshop Commissioners Hearing Room, PUC July 17, 2009.
Retail Market Subcommittee Update to COPS Kathy Scott July 16,
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
EILS Update DSWG ERCOT Staff October 9, EILS Update to DSWGOctober 9, 2009 Contents Procurement results: Current & historical Price comparison:
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
ERCOT Demand Response Spring 2015 ERCOT Operator Seminar.
ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.
ERCOT Staff Demand Integration Update to DSWG 3/08/2013 DSWG Meeting.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
March 7, 2013 Technical Advisory Committee (TAC) meeting update to RMS Kathy Scott March 20, 2013TAC Update to RMS 1.
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
DSWG – March 9, 2015 Four-CP Response in ERCOT Competitive Area Carl L Raish.
EILS Cost Comparison WMS Jan. 28, Background ERCOT procures Emergency Interruptible Load Service three times annually by Contract Period –February-May.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
ERS Update – DSWG Presentation September 21, 2012.
Long-Term Congestion Rights (LTCR) Weekly Testing Call January 5, Project Pinnacle.
Dow Jones U.S. Style Indexes Returns Recalculation August 31, 2001.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
1 EILS Technical Workshop 2.0 February 16, Agenda  Introduction  June – September 2010 Procurement Schedule  EILS Submission Form  Review.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
DSWG Update to WMS 12/2/2015. NPRR738 ERS Performance Calculations During TDSP Outages A utility outage can prevent ERS Generators from exporting to the.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
1 TDTWG March 4, 2009 Performance Measures Overview.
ERS Overview of Upcoming Changes.  Procedure Changes – ERS Generator Resources  Reporting Requirements – ERS Load Resources with Back-Up Generators.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
EILS Improvement Subgroup January 21, © CONSTELLATION ENERGY GROUP, INC. THE OFFERING DESCRIBED IN THIS PRESENTATION IS SOLD AND CONTRACTED.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
RMGRR058 Overview RMS Meeting – August 15, Background / Reference PUCT Substantive Rule 25.43(n)(8) Protocol Customer Billing Contact.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
ERS Update – Highlights Associated with NPRR745 DSWG 4/22/2016.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Draft NPRR Weather Sensitive ERS Loads December 2012.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
EILS Update Paul Wattles, ERCOT Staff DSWG Meeting April 29, 2011.
Compliance Report to ERCOT BOD December 2006
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Emergency Response Service Baselines
ERS Document Changes Associated with New SAS Implementation
ERS Update Mark Patterson, ERCOT Demand Side Working Group
Time Sheet Training Enrichment Classes.
Accreditation Questionnaire Timeline
Presentation transcript:

Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public Utility Commission of Texas for the 2013 ERS Program Year Project No Attachment B

Contents 10/26/2015 ERS Annual Report 2 Procurement Summary Capacity (MW) offered and procured Number & Average Size of ERS-10 Resources Cumulative Individual Sites Participating in ERS-10 Suspensions Due to Availability or Load Test Failures Settlement Summary Detailed procurement results by Standard Contract Term Fleet Level Summary for January 6, 2014 EEA Event

Standard Contract Terms & Time Periods 10/26/2015 ERS Annual Report 3 ERS is procured 3 times annually for 4-month Standard Contract Terms February through May June through September October through January Participants may offer to provide ERS for one or more Time Periods: Business Hours 1: 8AM to 1PM Monday-Friday* Business Hours 2: 1PM to 4PM Monday-Friday* Business Hours 3: 4PM to 8PM Monday-Friday* Non-Business Hours: All other hours *Except ERCOT Holidays Time Periods are designed to allow flexibility for customers during traditional business hours Time Periods have been in effect in current form since the June-September 2008 EILS Contract Period

ERS-10 Capacity Procurement Trends (Business Hours 1) 10/26/2015 ERS Annual Report 4

ERS-10 Capacity Procurement Trends (Business Hours 2) 10/26/2015 ERS Annual Report 5

ERS-10 Capacity Procurement Trends (Business Hours 3) 10/26/2015 ERS Annual Report 6

ERS-10 Capacity Procurement Trends (Non-Business Hours) 10/26/2015 ERS Annual Report 7

Procurement Trends (number & avg. size of Resources) 10/26/2015 ERS Annual Report 8

Cumulative Individual Sites Participation 10/26/2015 ERS Annual Report 9

Suspension History 10/26/2015 ERS Annual Report 10 ERS Resources suspended during the 2013 program year due to availability failures, two consecutive load test failures, or event failures Suspended Resources may regain eligibility only after submitting a corrective action plan and successfully completing a load-shed test administered by ERCOT

Settlement Summary 10/26/2015 ERS Annual Report 11 *Adjustments may be made for the following reasons: availability, event performance, disputes, data corrections.

Demand Integration Update to DSWG 2013 Results by Standard Contract Term

February-May 2013 Standard Contract Term 10/26/2015 ERS Annual Report 13 Total Adjusted Cost for this Standard Contract Term: $ 9,617,304.07

June-September 2013 Standard Contract Term 10/26/2015 ERS Annual Report 14 Total Adjusted Cost for this Standard Contract Term: $ 12,042,160.85

October 2013-January 2014 Standard Contract Term 10/26/2015 ERS Annual Report 15 Total Projected Cost for this Standard Contract Term: $ 12,744,451.58

Demand Integration Update to DSWG Summary for January 6, 2014 EEA Event

January 6, 2014 EEA Event Timeline 10/26/2015 ERS Annual Report 17

Fleet Level Performance for 1/6/2014 Event 10/26/2015 ERS Annual Report 18 Graph is based on 15-minute interval data. Performance is based on a prorated obligation for the 1 st partial interval and one full interval. 1 Resource had prescheduled unavailability from HE on the day of the event (14.6 MWs)

10/26/2015 ERS Annual Report 19 This document is provided for informational purposes only. Procurement and settlement data are subject to revision.