Discussion Topics Construction Contract Administration Other Construction Issues Questions? / Comments (Anytime)

Slides:



Advertisements
Similar presentations
ISTISNA’.
Advertisements

Contract CloseOut.
Procurement Management
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Ensure Vendor/Engineer of Choice Product Quality
2014 Changes in DBE Certification Standards and DBE Final Rule Overview State of Hawai’i Department of Transportation Office of Civil Rights Disadvantaged.
4/13/2017 1:54 PM.
Subcontracts 101 By Mitali Ravindrakumar USC Collaboration between Parties Perform Subcontractor Analysis Sponsor - Fund Project/Subcontr act Negotiate.
772 ESS Lesson Learned Briefing
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Project Procurement Management
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Learn. Perform. Succeed. Protest, Claims, Disputes and Appeals Chapter 7.
Time for a new standard - AS General Conditions of Contract
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Basic Financial Requirements for DoD Government Contracting 2015 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
U.S. Small Business Administration
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Discussion Topics Construction Contract Administration Other Construction Issues Questions? / Comments (Anytime)
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
Compensation events and claims Presented by Prof. Khem Dallakoti.
CONSTRUCTION CONTRACTS – MASTER CHART
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Chapter 15 Payments. Payments typically made monthly. Retainage typically withheld (5% - 10%) Project payment: –series of periodic payments –single final.
Contractor / Engineer Conference 2010 Dispute Resolution Process Dispute Resolution Process.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
Measurement and Payment Module #5 Prepared by Dr. Randy R. Rapp July 2005.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Office of Procurement Services.  Vendor Application Website: 
Measurement and Payment
DISTRICT CONSTRUCTION ENGINEER PANEL DISCUSSION Contract Management: Claim Avoidance and Handling Keith Compton, P.E. District 5 Construction Engineer.
TOPIC-7- PROJECT CASH FLOW
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Simile Billing Process. On the 20 th of the month the Project Administrators monthly billing reminders to all subcontractors that need to be paid.
Subaward - 2 CFR A formal legal agreement between your institution and another legal entity An award provided by a pass-through entity (PTE) to.
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Financial Management
TOPIC-7- PROJECT CASH FLOW
ARCH 435 PROJECT MANAGEMENT
Construction Contract Administration
Financial and Administrative presentation on PARTICULATES project
Directed Change Constructive Change
Diversity management system (DMS)
Presentation transcript:

Discussion Topics Construction Contract Administration Other Construction Issues Questions? / Comments (Anytime)

Non-conforming Materials Subsections and 105.7(1) of Std Specs Engineer-Accepted Nonconforming Work (1) If the work does not conform to the contract, the engineer will determine the circumstances under which that nonconforming work may be accepted and allowed to remain in place… Authority and Duties of Project Engineer (1) The engineer authorizes the project engineer to reject defective material and to suspend all work being improperly performed… CMM Authority of the Engineer

Non-conforming Materials As a general rule – Do not allow non-conforming materials to be incorporated into the work. The engineer has the authority to reject nonconforming materials – the contractor does not have the right to incorporate nonconforming materials into the work at a reduced price.

Non-conforming Materials Price reductions are assessed in situations where nonconforming materials are inadvertently incorporated into the work. If it is decided to allow nonconforming materials to be incorporated – agree on adjusted price prior to utilizing materials in work. If a price adjustment cannot be agreed upon – reject the material.

Nonconforming Materials CMM and Guidance When proposing a significant or controversial price reduction for non-testing or nonconforming materials – BTS and BPD needs to know. Contact Regional Oversight Engineer. Regional Oversight Engineer will advise whether BTS and BPD involvement is necessary.

Issues/Claims The standard specifications prescribe a process to be followed to resolve issues and claims. Subsection addresses issues before becoming a formal claim. Subsection addresses the procedures to follow when an issue is not resolved and has become a claim.

Issues Subsection104.3 If the contractor and department mutually agree, the department will get a third party advisory opinion. Recommendation is not binding. Subsection (3) “If the contractor does not agree with the project engineer’s decision…if the contractor and department mutually agree… the department will get a third party advisory opinion…” Contact Regional Construction Oversight Engineer

Issue  Claim Subsection If the contractor does not agree with the engineer’s decision on a contract change, the contractor may pursue a claim as specified in Prime contractor must certify all claims. Not good enough to have subcontractor certify the claim. Department expects that prime is satisfied with the validity of their subcontractor’s claim.

Issues / Claims Feds request claim information on a regular scheduled basis. Complete Claim Submittal Form (pantry software)  Construction Oversight Engineer.

Contract Modification Does the change affect the controlling item? Does this change affect contract time? If no, say so in the Contract Modification. If yes, provide info as to how new contract time was or will be determined. Always address contract time.

109.4 Price Adjustments for Contract Revisions 1. Contract Bid Prices 2.Minor Contract Revisions Not Covered by Contract Bid Prices (removed in 2014 edition) 3.Negotiated Prices 4.Force Account

Force Account (Std Spec ) Final option for price adjustments of CCO’s. Very specific / detailed procedure to follow. Engineer may direct contractor to perform revised work under force account at any time. Contractor submits proposal – Labor – Materials – Equipment – Work schedule Contractor and inspector compare records at end of each workday.

Force Account Per subsection , the contractor is required to submit a force account proposal. Avoid conflicts/misunderstanding later. Require contractor to submit a force account proposal prior to beginning force account work. Proposal should include: when work will be performed, whether work will be done utilizing OT, classifications of workers, equipment needed or on standby, materials to be used, subsistence, estimated time to complete work, time extensions, etc.

Force Account Common for contractors to add 1% to force account total. Provisions do not provide for a separate markup for the contract bond and should not be paid.

Force Account Equipment on standby If equipment is on site for FA work, but not in operation, do not pay in-operation rate – pay standby. If a truck is idle, it is not in-operation and should only be paid as standby. If equipment is idle it is not consuming fuel, oil, grease or experiencing wear and tear. Standby is intended to pay for a portion of ownership costs only not operating costs that are being incurred.

Force Account Work by subcontractors – Prime contractor allowed markup on work performed by subcontractor Markup 10% on first $10,000 Markup 2% on work in excess of $10,000 – Markup does not apply for first tier subs or lower tier subcontractors – only the prime receives the prescribed markup. These specific markups only apply to Force Account work. Negotiated prices for contract revisions includes “a reasonable allowance for profit and applicable overhead”.

Force Account Read CMM 2.46 Force Account Work – Provides good info for documenting and tracking costs. – Provides example of contractor’s itemized statement of actual costs. – Provides an example of cost breakdown for CCO’s. READ Std Spec Force Account

Cost Reduction Incentives (CRI’s) FHWA has asked Department to track CRI’s – Types – Acceptance (Approved or Denied) – Costs Send copy of ALL CRI’s to Construction Oversight Engineer. Include (cc) in response. Some CRI’s are NOT true CRI’s (little or no info being provided in contractor concept and/or proposal to evaluate). Also, if conditions are different than those anticipated when developing the plans which leads to changes – not a CRI. Please contact the Regional Oversight Engineer concerning significant CRIs.

Buy America In addition to item specific BA certification required, an umbrella (Blanket) certification is now required upon completion of project. “ Upon completion of the project certify to the engineer, in writing using department form WS4567, that all steel, iron, and coating processes for steel or iron incorporated into the contract work conform to these "Buy America" provisions...”

ASP 4 – Prompt Payment 10 days per tier to pay subcontractors. “Just Cause” required within10-day window if contractor intends to withhold payment. Department no longer needs to provide approval. Prime contractor to certify that all subcontractors have been paid in full (includes release of retainage) prior to submittal of final estimate. “Within 30 calendar days of receiving the semi-final estimate from the department, submit written certification that subcontractors at all tiers are paid in full for acceptably completed work and that no routine retainage is being withheld.”

Maintenance and Repair of Haul Roads We always pay the item. Contractor may incur costs when employing mitigating measures to limit damage to haul road instead of making physical repairs.

Finals Process for Let Project Closeout Finals Process for Let Project Closeout Developed to provide step-by-step guidance for staff involved in the Final Process for Let Project Closeout. Goal - increase the number of regional and local program projects that closeout within six months.

Finals Process for Let Project Closeout Finals Process for Let Project Closeout PROCESS DEFINITION The Finals Process includes the process steps required to close out a construction contract within 6 months, beginning when the department determines that work under the contract is Substantially Complete and ending on the date the department approves the Final Estimate for payment.

Finals Process for Let Project Closeout Finals Process for Let Project Closeout Assigns roles and responsibilities. Provides standard definitions for terms utilized in the finals process. Assigns timeframe to complete distinct process steps in the finals process. Flow chart – Responsible parties, tasks, and process steps. Includes tracking system.

Finals Process for Let Project Closeout Finals Process for Let Project Closeout Snapshot at end of June (fiscal year) Goal – 45% of projects finaled within 6 months of substantial completion.

Progress Schedules CMM Acceptance of Progress Schedules – Answers to questions must be YES to accept contractor’s schedule. CMM Progress Payments – No progress payments (except materials) until schedule is accepted. Updates – Important to administration of contract – Important in claims

CMM

Significant Changes

Altered work typically involves Directed Changes Changed Quantities involve variations from estimated quantity due to inherent quantity variations (not due to a directed change)

Significant Changes Altered Work vs Changed Quantities (Quantity Variations) If the work is altered by a directive, quantity variation thresholds do not need to be met. Exceeding a quantity threshold alone does not establish entitlement to additional compensation.

Eliminated Items Subsection Eliminated Items is mobilized when work is eliminated through a directive, not due to an inherent quantity variation. A quantity variation does not trigger unless the variation is due to a directed elimination of work.

Changes If in doubt how to categorize the change – contact the Regional Construction Oversight Engineer for assistance.

Pile Quantity Variations Most piling quantity variations are not subject to the altered work clause but may be subject to the quantity variation clause of Quantity variation must meet the applicable thresholds in order to be considered as a significant change eligible for a price adjustment. If quantity variation meets thresholds, contractor must be able to demonstrate that there was an increase in cost due solely to the quantity variation – typically would be due to under-recovered fixed costs. Mobilization would not be considered – costs should be in the mobilization item.

Timely Decision Making Line of Communication Designated Materials Person 3-Week Look-ahead Schedule Request for Information (RFI) Evaluations

Timely Decision Making Expectation is that projects will employ the tools incorporated into the Timely Decision Making Guidelines. Guidelines can be found at:

Start Notice / Notice to Proceed Subsection states, “The department will issue a written notification to begin or resume work for all … contracts. Do not begin or resume work before receiving the engineer’s notification.”

Conditional Start Notice FDM Factors Influencing Contract Time Exclusions from Contract Time Charges include, but are not limited to: Construction Staking, initial layout before grading work begins. Move-in of equipment by the contractor. Delivery, installation and removal of temporary traffic control devices.

??? QUESTIONS ???