Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

Open Procurement Process Gauteng Provincial Treasury Process Mapping 30 th October 2014.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Event Management for the RAF National Sports Day Compulsory Briefing Session 2 September 2013.
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session 05 August 2013 The Road Accident Fund.
Construction Industry Development Board development through partnership “Towards Uniform Conditions of Contract and Specifications in South Africa” South.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 12 Integration Management Practising a common, coordinated.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Compulsory Briefing Session 4 October 2013 Branding and Promotional Materials.
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
S/W Project Management
State Information Technology Agency Presentation to Portfolio Committee on Home Affairs.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Compulsory Briefing Session 13 September 2013 Brand Activation Agency.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
1 Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 18 August 2010.
AUDITOR-GENERAL Presentation to the Public Service and Administration Portfolio Committee on the appointment and utilisation of consultants Report of the.
1 Mpho Mathabathe: Researcher Portfolio Committee on Correctional Services Analysis of DCS Annual Report (2011/12)
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Divisional Managers Commitment to the Diagnostic and Unit Rate Study Consultancy Services for Monitoring of Contractors/Consultants Performance And Establishment.
1 DEPARTMENT OF PUBLIC WORKS P RESENTATION TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE ADMINISTRATION 23 FEBRUARY 2011.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
1 PROGRESS REPORT ON RECAPITALISATION FET COLLEGES DATE : 21 JUNE 2006.
Standing Committee on Appropriations Quarter 4 Expenditure 2012/ June 2013 The Presidency Department of Performance Monitoring and Evaluation.
Department of Correctional Services NEW GENERATION CORRECTIONAL CENTRES BRIEFIENG SYNOPSIS DEPARTMENT OF CORRECTIONAL SERVICES.
1 DEPARTMENT OF PUBLIC WORKS Presentation to Portfolio Committee Disposal Strategy Facilities Management Contract 14 June 2005.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
DEPARTMENT OF EDUCATION EDUCATION INFRASTRUCTURE PROGRAMME OF ACTION Portfolio Committee Presentation Cape Town 15 February 2005.
11 PUBLIC HEARINGS ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE 2008/2009 PARLIAMENT 27 AUGUST 2008.
DPW PRESENTATION TO PORTFOLIO COMMITTEE ON CORRECTIONAL SERVICES 09 FEBRUARY 2010.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
1 Mpho Mathabathe: Researcher Portfolio Committee on Correctional Services Analysis of SONA (2012)
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
PRESENTATION TO PORTFOLIO COMMITTEE ON SPORT AND RECREATION SPORT INFRASTRUCTURE.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
I P M 1 City of Fort Worth City Council Presented by Doug Rademaker, Deputy Director, PMO Ken Hall, IPM Program Manager, CH2M HILL October 6, 2009 I n.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Presenter: Igna Visser Date: Wednesday, 18 March 2015
Project Management – PTM712S
Brand Activation Agency
Standing Committee on Appropriations Quarter 3 Expenditure 2012/2013
Offsite Storage RAF/2013/00023 Compulsory Briefing Session
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
DCS PORTFOLIO COMMITTEE PRESENTATION NEW CORRECTIONAL CENTRES
Evaluation Grids Evaluation Grids.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Office Alterations RAF/2012/00027 Compulsory Briefing Session
TechStambha PMP Certification Training
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
2nd QUARTER ANALYSIS REPORT FOR THE 2017/18 FINANCIAL YEAR
Pre-contract Planning and Practice
Sales Process March 2017.
Department of Sport, Arts and Culture
OCPS CCNA SELECTION COMMITTEE TRAINING
Progress on the Bucket Eradication Programme
European Spallation Source ERIC Procurement
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional Services 5 September 2012

Purpose To respond to observations made by the DCS Portfolio Committee during their meeting of 22 February 2012 regarding the procurement of the contractor and details of the contract for both Ceres and Van Rhynsdorp Correctional Facility. 2

Projects Initiation & Professional Team DCS requested provision of additional accommodation for administration and inmates to address congestion in various prisons in the Western Cape and in the Country. Hence VAN RHYNSDORP AND CERES PRISONS were registered as projects by DPW. Registered Departmental Project Manager was appointed to lead the professional team which comprises of Private Engineers, Architect and Quantity Surveyor. 3

Projects Initiation & Professional Team - continues The appointment of the professional team was done through routine assignment of consultants – Roster Each project had a dedicated professional team in order to maximize performance and focus The professional team members involved on the project are registered with their relevant professional councils 4

Observation: PROCUREMENT PROCESS: VAN RHYNSDORP DPW advertised this tender on open procedure on 27 July Procurement Strategy included inter alia the following requirements: –CIDB grading of 8GB or 8CE –Minimum Contract Participation Goal percentage of 20% was required 5

Observation: Procurement Process: Van Rhynsdorp continue Cost analysis and pre tender estimates were done by professionally registered Quantity Surveyor Pre-tender Estimate was R 219,989, –The estimate was based Kimberley Prototype –Contract Price Adjustment was included Tender Amount R 192,876, Variance is R 27,112,

Observation: Procurement Process: Van Rhynsdorp Continued 3 Tenders were received on 12 September tenderer was declared non-compliant due to not meeting the minimum points for quality 1 tenderer was disqualified as they did not have the required CIDB grading 7

Observation: Procurement Process : Van Rhynsdorp Highest point scored tenderer was recommended as the bid adhered to all requirements set and the tenderer had the required cidb grading. –Cidb grading 8GBPE –Contract Participation Goal Percentage tendered 47.41% Tender recommendation was accepted by the Bid Adjudication committee and tender was awarded on 12 October 2007 The site was handed over to the contractor on 7 November

Van Rhynsdorp - Cost Analysis Actual Tender Amount is R 192,876, Current ExpenditureR Variance between tender Amount and Expenditure to date R 82,818, (30.04%) Costing model applied by was based on Historical Information(Kimberley) and Cost for Resources The variance increased due to the following: Additional work requested by the User Department, outside the original scope of works. Change of specifications for materials to meet client needs and enhance compliance, post sign-off of project deliverables. Failure to account for topography and geographical location of facilities 9

Observation: Procurement Process : Ceres DPW advertised this tender on open procedure on 25 April Procurement Strategy included inter alia the following requirements: –CIDB grading of 8 GB –Minimum Contract Participation Goal percentage of 20% 10

Observation: PROCUREMENT PROCESS: CERES - Continue Cost analysis and pre tender estimates were done by professionally registered Quantity Surveyor. Pre-tender Estimate was R 212,646, –The estimate was based Kimberley Prototype –Contract Price Adjustment was also included Costing model applied by Historical Information (Kimberley) and Cost for Resources Actual Tender Amount R Variance is R

OBSERVATION: PROCUREMENT PROCESS: CERES CONTINUED 7 Tenders were received on 28 May Tenders were disqualified as they did not have the correct cidb grading Highest point scored tenderer was recommended as the bid adhered to all requirements set and the tenderer had the required cidb grading. 12

Observation: Procurement Process: Ceres continued –CIDB grading of 8 GBPE –Contract Participation goal percentage tendered 43.7% Tender recommendation was accepted by the Bid Adjudication committee and tender was awarded on 11 July 2008 The site was handed over to the contractor on 5 August

Ceres - Cost Analysis Actual Tender AmountR Current ExpenditureR Variance between tender Amount and Expenditure to date R (5.44%) The variance increased due to the following: Additional work requested by the User Department, outside the original scope of works. Failure to account for topography and geographical location of facilities 14

Form of contracts Details of contracts Most of the activities on both projects related to buildings and civil works. The form of contract found to be suitable and relevant to both projects was: Standard JBCC 2000 Edition 4.1 March 2005 – this document is not part of the documentation, but is referred to as the basis of the contract Special conditions of Contract DPW 04 EC 15

Shortcomings identified in contracts and how to overcome in future Shortcomings in processes have been identified –Sketch plan approval was duly obtained before tenders were invited; user client changes still occurred due to the fact that these facilities were of the first new generation facilities to be built and lessons learnt at Kimberley was incorporated in the building during construction phase –Enough time must be allocated for the planning phase of a project –Risk assessment of tenders to be comprehensive as the cidb grading is correct, but experience in a specific field may be limited 16

Planning Phase Challenge : Time frame between approval of sketch plans and tender documentation is often too short. Often due to pressure to get on site and show an expenditure. The result is detail planning must be done during the contract Proposal : Realistic time frames must be set and communicated. Expectations must not be created where delivery cannot take place. 17

Planning Phase Challenge : The geotechnical survey completed at the beginning of the planning was not comprehensive enough to indicate problems on soil conditions resulting in delays and extras due to rock, high water table levels, etc. Proposal : The DPW must ensure a comprehensive geotechnical survey and increase the amount of trial holes required in order to ensure that surprises in site conditions do not occur. 18

Planning Phase Challenge : The standard drawings and documents that existed were not comprehensive enough to allow planning without changes required. The lessons learned from Kimberley was incorporated during the construction phase Proposal : The DPW with assistance of DCS must develop comprehensive standard drawings and specifications that must only be adapted to suite a specific site. 19

Procurement Phase Challenge : At time of the evaluation of these tenders the method of risk assessment of contractors implemented was restrictive mainly based on the CIDB grading of the contractor and quality criteria set that did not include for all issues Proposal : The DPW has introduced a risk assessment concentrating on technical and contractual ability as well doing a commercial risk in line with the CIDB prescriptions. This must be further enhanced by developing of quality (functionality) criteria that are fair and objective 20

Procurement Phase Challenge : Contractors that are responsive in all criteria and will pass a risk assessment, but can be over committed if too many projects are simultaneously awarded to such companies. Proposal : A difficult challenge to resolve! The DPW to engage with National Treasure and the CIDB to develop criteria that can be used to ascertain if a proposed contractor will be over committed if more projects are awarded 21

THANK YOU 22