SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.

Slides:



Advertisements
Similar presentations
Current Status of the FDOT SunGuide SM Software Project Robert W. Heller, Ph.D. March 16, 2005.
Advertisements

FDOT Central Office ITS Software Update
Purpose Scope Debriefing is a concept of providing a “Feedback point” to the program manager of the project scope and those who were involved in preparing.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.1 October 14,
IMS Systems Analysis and Design Communication and Documentation: Additional Notes on Written Reports.
Software Configuration Management
SAIC-F QA Internal Process (DRAFT ) Sudha Chudamani QA Team, Frederick National Lab Jan 2, 2013.
Release & Deployment ITIL Version 3
Statewide Transportation Management Center Software Library System Status Meeting February 17, 2004.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Software Development Plan
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Software Configuration Management
1 ITS America Palm Springs, CA June 6, 2007 SunGuide SM Software – Florida's ITS Software ITS America Palm Springs, CA June 6, 2007 Trey Tillander, P.E.
SunGuide SM Software Development Project Status Meeting March 9, 2004.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.0 August 18, 2008 August 18,
SunGuide SM Software Development Project Status Meeting (via teleconference) October 4, 2005 CDRL
Business Systems Development SDLC and introduction to the Microsoft Solutions Framework Team and Process Models.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.
DMS Systems Design Review 3
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting January 11, 2005.
Welcome to the San Bernardino County Coach Quarterly Meeting.
January 11, 2007Map Alternatives Workshop 1 SunGuide SM Map Alternatives Workshop.
May 16, 2007Change Management Board Meeting1 Local: Toll-Free: Ext
July 14, 2010SunGuide SMD Kickoff Meeting1 BDQ69 SunGuide Support, Maintenance and Development Enhancement Contract July 14, 2010 Kickoff Meeting.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting August 27, 2007.
Statewide Transportation Management Center Software Library System (SunGuide SM ) TIM & SunGuide SM Coordination Meeting October 21, 2004 Orlando, Florida.
Statewide Transportation Management Center Software Library System Software Requirements Review (SRR) and Status Meeting January 8, 2004.
SunGuide SM Software: Development Status Robert W. Heller, Ph.D. July 14, 2004.
Software Quality Assurance
SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review.
SunGuide SM Software Development Project Status Meeting December 7, 2004.
SunGuide SM Software Development Project Status Meeting July 13, 2004.
SunGuide SM Software Development Project Status Meeting May 10, 2005 CDRL
SunGuide SM Software Development Project Status Meeting November 9, 2004.
SunGuide SM Software Development Project Administrator Training CDRL
SunGuide SM Software Development Project Release 3.0 Design Review May 2-3, 2007.
SunGuide TM 4.0 Functionality Data Fusion: How Data is Managed June 24, 2008.
SunGuide TM Software Development Project Release 4.0 Kick-off Meeting October 15, 2007.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting October 1, 2007.
RUTGERS INTELLIGENT TRANSPORTATION SYSTEMS INSPECTION AND MAINTENANCE SOFTWARE (RITSIMS) NJDOT TRAINING CASE STUDY.
SunGuide SM Software Development Project Status Meeting April 29, 2004.
SunGuide SM Software Development Project Status Meeting October 13, 2004.
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
December 16, :00 – 2:45. MPM Team Agenda 1.Review of MPM Program and Team 2.Consensus items document 3. Upcoming activities 4. Discussion.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting November 27, 2007.
April 29, 2004 Project Status Meeting Liang Y. Hsia, P.E. ITS Engineer Administrator Florida Department of Transportation.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Quality Assurance at CMM Level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Project Reviews Providing Value to Stakeholders PMI Sacramento Valley Chapter PMO Forum – June 2007 Bob Cutler, PMP Hubbert Systems Consulting, Inc.
SunGuide SM Software Development Project Software Design Review May 12, 2004.
SunGuide SM Incident Management Concepts Robert Heller October 21, 2004.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Software Configuration Management
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:50
SunGuideSM Software: Development Status Steven W. Dellenback, Ph. D
Agenda Time Item Lead 10:00 – 10:05 Introductions Liang Hsia
Chapter 11: Software Configuration Management
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:45
SunGuideSM Software Development Project Status Meeting and Demonstration April 5-6, 2005 CDRL
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005

November 1, 2005SunGuide TRR Meeting 2 Agenda TimeItem Lead 1:30 – 1:35Introductions Liang Hsia 1:35 – 1:40Logistics Steve Dellenback 1:40 – 1:55Testing Process Test Procedures Steve Dellenback / Robert Heller 1:55 – 2:00Hot Wash-up Meeting Steve Dellenback 2:00 – 2:15Questions / Comments All

November 1, 2005SunGuide TRR Meeting 3 Introductions

November 1, 2005SunGuide TRR Meeting 4 Agenda TimeItem Lead 1:30 – 1:35Introductions Liang Hsia 1:35 – 1:40Logistics Steve Dellenback 1:40 – 1:55Testing Process Test Procedures Steve Dellenback / Robert Heller 1:55 – 2:00Hot Wash-up Meeting Steve Dellenback 2:00 – 2:15Questions / Comments All

November 1, 2005SunGuide TRR Meeting 5 Logistics Test location: –FDOT Lab Meetings: –Conf Room: B block Break: –C2C Lab Lunch –SwRI Cafeteria Internet: –Available in the lobby (100baseT connection)

November 1, 2005SunGuide TRR Meeting 6

November 1, 2005SunGuide TRR Meeting 7 Document Status Documents delivered to FDOT over the last month: –Software Requirements Specification (SRS) –Software Integration Plan (SIP) –Software Integration Case Procedures (SICP) –Database Design Document (DBDD) –Software User’s Manual (SUM) –Version Description Document (VDD) –Training Plan (TP) Other deliverables: –Rational RequisitePro database –Source CDs –Installation CDs Outstanding Deliverable: –Software Design Document (SDD)

November 1, 2005SunGuide TRR Meeting 8 Agenda TimeItem Lead 1:30 – 1:35Introductions Liang Hsia 1:35 – 1:40Logistics Steve Dellenback 1:40 – 1:55Testing Process Test Procedures Steve Dellenback / Robert Heller 1:55 – 2:00Hot Wash-up Meeting Steve Dellenback 2:00 – 2:15Questions / Comments All

November 1, 2005SunGuide TRR Meeting 9 Purpose of TRR Purpose: –Review preparations for testing –Walk through the test procedures at a very high level and determine if anyone has any comments Ground Rules: –Testing will not depart from the written procedures –Any requested “ad hoc” testing will occur after the formal testing process Approvals: –FDOT/SwRI will witness each test case (on “Master SICP”) –At the conclusion, FDOT will sign SICP cover page to acknowledge all tests were executed as written/noted in the “Master SICP”.

November 1, 2005SunGuide TRR Meeting 10 Schedule for Testing Date / TimeItemLead November 1 1:30 – 2:00 Test Readiness Review (TRR) Meeting:  Discuss testing process  Review test procedures Steve Dellenback November 1 2:00 – 6:00 Testing using the Software Integration Case Procedures document (“rolling” breaks) SwRI Team November 2 8:30 – 5:00 Testing using the Software Integration Case Procedures document (1 hour lunch and “rolling” breaks) SwRI Team November 3 8:30 – 2:00 Testing using the Software Integration Case Procedures document (1 hour lunch and “rolling” breaks) SwRI Team November 3 2:00 – 3:30 Retest of any previously identified test failuresSwRI Team November 3 3:30 – 4:30 Hot Wash-up Meeting (to discuss testing results) Steve Dellenback / Robert Heller “Free Play” in the lab if we are done early

November 1, 2005SunGuide TRR Meeting 11 Test Case Example

November 1, 2005SunGuide TRR Meeting 12 Release 1.1 Integration Cases IC-1: Core Processes: –User (AS) –Status Logger (SL) –Executive Handler (EH) –Data Distribution (DD) –Operator Map (OM) IC-2: Dynamic Message Sign (DMS) IC-3: Video (CCTV) IC-4: Transportation Sensor Subsystem (TSS) IC-5: Incident Management (IM) General Requirements

November 1, 2005SunGuide TRR Meeting 13 Release 2.0 Integration Cases IC-6: Subsystem Updates: –Graphical User Interface (GUI) –Closed Circuit Television (CCTV) –IM IC-7: Trailblazer IC-8: Safety Barrier (SB) IC-9: Roadway Weather Information System (RWIS) IC-10: Highway Advisory Radio (HAR) IC-11: Ramp Metering Subsystem (RMS) IC-12: Center-to-Center (C2C) IC-13: Web Server (WS) IC-14: Emergency Evacuation (EE) IC-15: Inventory and Maintenance Subsystem (IMS) IC-16: Data Archiving (DA) IC-17: Travel Times (TvT) General Requirements (not attributed to any one IC)

November 1, 2005SunGuide TRR Meeting 14 Questions About Test Cases?

November 1, 2005SunGuide TRR Meeting 15 Computer Layout

November 1, 2005SunGuide TRR Meeting 16 Documents Available in the Lab Paper: –Concept of Operations (ConOps) –Software Requirements Specification (SRS) –Software User’s Manual (SUM) –Functional Configuration Audit (FCA) –Software Integration Plan (SIP) –Software Acceptance Test Plan (SATP) –Software Integration Case Procedures (SICP): master copy and individual copies for all participants –Contractual Documents (Scope of Services, Requirements, ECO #1, draft ECO #1.1) Electronic: –All

November 1, 2005SunGuide TRR Meeting 17 Next Steps… (after this week) Deployment to District 6 –Scheduled to start the week of Nov 7 th –Training during the week of Nov 15 th and/or 21 st based on D6 staff availability –Factors to simplify installation: Recent milestone demonstration overcame a number of communication issues SunGuide SM D6 database is fairly mature Future development –Based on FDOT approval –Planned enhancements will be 2.x (no formal FAT)

November 1, 2005SunGuide TRR Meeting 18 Test Preparation Document cleanup –Published final versions of Release 2.0 documents Prepared VSS and Clear Case repository of Release 2.0 software (source code and installer) to the FDOT Central Office Test director led several dry runs through the SICP –Anomalies within the SICP corrected –Anomalies within the Release 2.0 software corrected

November 1, 2005SunGuide TRR Meeting 19 Project Factoid Development activities (25 months): –Began October 7, 2003 –Ended November 3, 2005 –Initial project schedule requested by FDOT: 25 months –Staff time: 48,577 hours Costs: –Release 1: $4,335,554 (spent $4,321,459) –Release 2: $2,732,303 (projected $2,307,432) –Development under-run: $225K Lines of code: 925K SLOC (generic framework saved SLOCs)

November 1, 2005SunGuide TRR Meeting 20 Agenda TimeItem Lead 1:30 – 1:35Introductions Liang Hsia 1:35 – 1:40Logistics Steve Dellenback 1:40 – 1:55Testing Process Test Procedures Steve Dellenback / Robert Heller 1:55 – 2:00Hot Wash-up Meeting Steve Dellenback 2:00 – 2:15Questions / Comments All

November 1, 2005SunGuide TRR Meeting 21 Hot Wash-Up Meeting Purpose: –Anomalies identified during testing are discussed and everybody agrees on what happened –Results are captured in a Hot Wash-Up minutes (one set of minutes for the entire week of testing) After the testing period, SwRI will develop a Software Test Reports which contains: –Summary narratives of the test results –Identification of problems or failures –Recommended resolutions of anomalies observed –Copies of witnessed data sheets

November 1, 2005SunGuide TRR Meeting 22 Agenda TimeItem Lead 1:30 – 1:35Introductions Liang Hsia 1:35 – 1:40Logistics Steve Dellenback 1:40 – 1:55Testing Process Test Procedures Steve Dellenback / Robert Heller 1:55 – 2:00Hot Wash-up Meeting Steve Dellenback 2:00 – 2:15Questions / Comments All

November 1, 2005SunGuide TRR Meeting 23 Questions / Answers