WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
RTC2012-Confidence in the Final Geometry – Detailed Coordination, Prefabrication, Multi- Trade Preassembly John Mack Herrero Contractors, Inc.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Introduction to Structural Design
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Please open full screen The new effective way for reducing costs in construction projects.
Skyscraper Construction
| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
The Millennium Science Complex
Lean Construction - Prefabrication
By.
Six Sigma Foundations Continuous Improvement Training
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
INDUSTRIAL & SYSTEMS ENGINEERING
Structural Insulated Panel System Chapter 15. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
Chapter 4: Air Leakage Control: Materials and Techniques
Sutter Medical Center Castro Valley Images from VSM Meetings.
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Construction Project Management: Technology driven answers for schedule and budget savings.
Northside Residence Hall Texas A&M University College Station, Texas Project No Proposal For CMAR Services for.
From balloons frame to CAD-tailored : Japanese precut framing technology comes to the U.S. Presented By: Soad Zaki Abdel-Tawab By: Ted Smalley Bowen Web.
Wall and Ceiling Construction
DRAWING ON EXPERIENCE … BUILDING ON STRENGTH Six Storey Wood-Framed Buildings Unique Structural Opportunities & Challenges Kurt Ruhland, P.Eng. Director,
MAGNA M a g n a D i g i t e c h I n d i a P r i v a t e L i m i t e d STEEL FABRICATTION TO DUCTILE IRON CASTING CONVERSION PROJECT NAME: CHARGE AIR PIPE.
Wall Framing Grimsby Secondary School Technology Dept.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
P2SL-LCI Lean Design Forum “The Rhythm of Project Validation” April 19, 2007 Our Experience With LEAN and Integrated Project Delivery January 8-9, 2009.
Wall and Ceiling Construction
Palomar West Medical Center Segmental Review Brett W. Beekman, S.E. Senior Structural Engineer, Southern California.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Presented by Cameron Mikkelson April 16, 2014 Silverado Senior Living Brookfield, WI Analysis Topics On-site Prefabrication of Interior Wall Panels Installation.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
ME444 ENGINEERING PIPING SYSTEM DESIGN
WALL COMPONENT IDENTIFICATION
Clinical and Translational Science Institute / CTSI at the University of California, San Francisco Clinical Research Services: “The Beat Goes On” CTSI.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
Commissioning HVAC Systems: Lessons learned throughout
The Engineering Design Process
Basic Design & Engineering
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
advices for advancing the productivity of the construction industry:
Installation Walkthrough Image Guide
Operating Room HVAC Waste Reduction Jason Lang, MD, Seema Gandhi, MD University of California San Francisco Carbon Neutrality Initiative Fellowship Introduction.
Memorial Hospital Miramar
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Construction Documents
CONSTRUCTION MASTERS BONUS BONUS
CIFE welcome.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Wrangle Hill Elementary School New Castle, DE
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
Best Interior Designers in Udaipur Kapil Jain Architects
Light Gauge Steel Frame
Module 5: Facilitating Compliance with Prefabrication
CIFE welcome.
Mastering Autodesk Revit MEP 2016
Walt Dubois, PE and CHFM St. Joseph’s Hospital Phoenix, Arizona
Wall and Ceiling Construction
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
DBIA Manual of Practice
Multi-Family Fourplex Apartment
Presentation transcript:

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission Bay

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presenters  Steve Spence: DPR General Superintendent  Dan Casale: DPR BIM Engineer –Project Team: –University of California San Francisco –DPR Construction –Anshen & Allen Architects –Cambridge Group

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Project Background  UCSF Mission Bay Campus –Hospital – 650,000 SF – OSHPD 1 –Outpatient Building – 250,000 SF – OSHPD 1/3 –Energy Center – 20,000 SF  Total Value = $1.68 Billion  Target Budget = $1.58 Billion  UCSF Medical Center at Mission Bay UCSF Medical Center at Mission Bay

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Scope of Work  Produce fully coordinated models that can be used to create OSHPD submittals for the Hospital / OPB and EC  Preconstruction Services Only  Currently over by $100M and team needs to address this  Use BIM / VDC and Lean Principles

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Pre-Fabrication  Ideas: –Brain-storming session. Every idea was analyzed –Identified Constraints

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Pre-Fabrication  Ideas That Work –Industry Standard: Pre-cut Conduit & MC Pre-Punch Panels Pre-fab J-Boxes Trim for Fixtures Bathroom Carriers Pre-Spooled & Jointed Pipe Pre-Section Duct VAV & Attenuator Sections Soffit Drops Box Headers Headwall Units  Ideas that Don’t Work –Pre-Fab Bathrooms Structure Won’t Allow It –Joint Racking OSHPD Won’t Allow It –Pre-Fabbed Electrical Rooms –Med-Gas Rack OSHPD Won’t Allow It

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Pre-Fabrication  Potential Ideas: –Joint Racking for Plumbing & HVAC –Fire-stopping Systems –RE-Bar Cages –Pre-Fabricate Wall Panels

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Drywall/Stud Modeling

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Software  Challenges: –Software Under- Developed Automated Openings Automate Backing Further Develop Shop- Drawings Pre-Fabrication  Benefits: –Much more efficient than traditional placement. –Identify King & Corner Stud Clashes –Identify Constructability Constraints –Facilitate Pre-fabrication Effort

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Panelized Systems  Prefabrication –Currently performing feasibility analysis. What’s the engineering say? Can it be coordinated? How many panels must be pre- fabbed to break even? How big can they be? Optimal height? Schedule Impact? Where should we target? Etc…?

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Panelized Systems  Preliminary Research: –Labor Unions –Pre-Fabrication Site –Engineering Requirements –OSHPD Approval –Machine Proposal  Preliminary Answers: –Labor Unions must work locally –Pre-fab site subject to location constraints –Panels can span 8’ and are stronger than traditional walls –OSHPD is OK –Custom Machine can be built

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Panelized Systems  Hybrid system –Individual Panels –Up to 8’ in length –Target 6” above ceiling –Designed lengths for “layout framing” –Complete with Backing In-wall MEP Top & bottom track

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Panelized Systems  In-fill –Traditional “stick framing” –King studs, infill above 9’6”

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Installation Process  Process: 1.Corner, Kong, & Top Track Placed 2.Panels laid in 3.In-fill framing comes behind. 4.Walls inspected and closed.

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Alternate Installation Process  Process: 1.Corner, Kong, & Top Track Placed 2.In-fill framing. 3.Panels laid in 4.Walls inspected and closed.

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Target Areas  Identify Repetitive Areas of the Floor Plan  Same Rooms= Repeating Panels  10 Different Panels Used 100x’s  Vs.  100 Panels Used 10x’s

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Floor Plan

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Assembly Drawing  Assembly Drawings Contain: –Individual Panels –Matched up –Total Wall Assembly with Infill Framing

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Panelized Systems  Combine panels & infill –Total wall system –Higher Quality –Shorter installation schedule

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Panelized Systems

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Panelized Systems

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Challenges  Models for 3-6 have already been created and coordinated. –30,000SF every 20 days.  Pre-fabrication was not addressed during these phases –Critical studs occur every 4’ in most patient rooms  Schedule Impact –What is the schedule impact? Are we more efficient? What are the productivity rates?  Engineering –Do panels have to match infill above? –How far can we span?

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Advantages  Quality Control  Productivity Rate  Productivity Tracking  Waste Reduction  Schedule Benefits = Cost Benefits

WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort What’s Next  Currently Modeling Critical Studs Prior to Coordination  Subs should be able to coordinate around studs supporting panels.  To