C. Loomis – Integration Status- October 31, 2001 - n° 1 Integration Status October 31, 2001

Slides:



Advertisements
Similar presentations
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Advertisements

Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
C. Loomis – Status of European DataGrid – May 23, 2002 – 1 Status of European DataGrid Charles Loomis CNRS/LAL NorduGrid Workshop May 23, 2002.
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
NIKHEF Testbed 1 Plans for the coming three months.
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
GRID Workload Management System Massimo Sgaravatto INFN Padova.
Workload Management Massimo Sgaravatto INFN Padova.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
C. Loomis – Testbed: Status… – Sep. 5, 2002 – 1 Testbed: Status & Plans Charles Loomis (CNRS) Sept. 5, th Project Conference (Budapest)
1 Deployment of an LCG Infrastructure in Australia How-To Setup the LCG Grid Middleware – A beginner's perspective Marco La Rosa
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
KNMI Applications on Testbed 1 …and other activities.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
Yannick Patois – Datagrid Repository Presentation- 2001/11/21 - n° 1 Partner Logo DataGrid Software Repository presentation A short presentation of the.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Support for system administrators Feedback from site admins after Testbed1 experience 05/03/2002 4th EDG WS Paris G. Merino, IFAE.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
DataGrid is a project funded by the European Union VisualJob Demonstation EDG 1.4.x 2003 The EU DataGrid How the use of distributed resources can help.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
German Cancio/ WP4 -1 WP4 comments for the TestBed German Cancio / WP4
Budapest, September 5th, 2002 DataGrid Accounting System DGAS Current status & plans Stefano Barale INFN Budapest, September.
GLite – An Outsider’s View Stephen Burke RAL. January 31 st 2005gLite overview Introduction A personal view of the current situation –Asked to be provocative!
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
CEOS WGISS-21 CNES GRID related R&D activities Anne JEAN-ANTOINE PICCOLO CEOS WGISS-21 – Budapest – 2006, 8-12 May.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
DataGRID Testbed Enlargement EDG Retreat Chavannes, august 2002 Fabio HERNANDEZ
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
LCG LCG-1 Deployment and usage experience Lev Shamardin SINP MSU, Moscow
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
Ariel Garcia DataGrid WP6, Heidelberg, 26 th September 2003 Ariel García CrossGrid testbed status Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
Site Certification Process (Round Table) Fabio Hernandez IN2P3 Computing Center - Lyon October
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL DOE/NSF Review of US LHC Software and Computing Fermilab Nov 29, 2001.
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
Tests at Saclay D. Calvet, A. Formica, Z. Georgette, I. Mandjavidze, P. Micout DAPNIA/SEDI, CEA Saclay Gif-sur-Yvette Cedex.
B.Jones– July n° 1 Software Release Testing u Draft document prepared and attached to the agenda page for this meeting u Explains the testing steps.
Testbed Release Criteria and Plans WP8 Loose Cannons & App Representatives.
Andrew McNab - Globus Distribution for Testbed 1 Status of the Globus Distribution for Testbed 1 Andrew McNab, University of Manchester
CERN Certification & Testing LCG Certification & Testing Team (C&T Team) Marco Serra - CERN / INFN Zdenek Sekera - CERN.
Current Globus Developments Jennifer Schopf, ANL.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
Dave Newbold, University of Bristol21/3/2001 (Short) WP6 Update Where are we? Testbed 0 going (ish); some UK sites being tried out for production (mostly.
Testbed: Status & Plans
The EDG Testbed Deployment Details
Andreas Unterkircher CERN Grid Deployment
Testbed Software Test Plan Status
CMS report from FNAL demo week Marco Verlato (INFN-Padova)
Presentation transcript:

C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001

C. Loomis – Integration Status- October 31, n° 2 Monday’s Presentation u Attendance n Approx. 80 people in IT Auditorium n Approx. 25 people via VRVS u Comments n Generally positive comments (“presentation was definitely useful”) n Negative: long day, lots of material, not always well-focused To give site administrators an overview of the capabilities, installation, and configuration of EDG software for Testbed 1 and to introduce them to the available resources.

C. Loomis – Integration Status- October 31, n° 3 Acknowledgements Antony WilsonAndrew McNabEric Fede Anders WaananenPietro MartucciFlavia Donno Marco SerraAlex MartinPiergiorgio Cerello Elisabetta RonchieriCharles LoomisAlessandro Cavalli Yannick PatoisJulian LinfordFranck Bonnassieux Andrea ParriniYannick LegreJean-Phillipe Baud Sophie NicoudNadia LajiliMaite Barroso Shahzad MuzaffarEric Van HerwijnenStefano Barale Daniele MuraFabio HernandezJim Amundson Many thanks for their hard work!

C. Loomis – Integration Status- October 31, n° 4 Legal Issues u Copyright Statement: n Copyright © 2001 EU DataGrid – see u License n Need to put something at link for release. n Is a BSD-style license? True? u Licenses for external packages. n What packages can be used? (BYPASS?) Need policy stmt. (PTB,PMB) n Lack of statement may eventually compromise mission.

C. Loomis – Integration Status- October 31, n° 5 EDG Usage Guidelines Site usage guidelines present logistical problem for EDG operation. u Have official translation from CERN translation service. n Need to “finalize” version before EDG release. n Sit down with a few people to incorporate comments. n Need “official” location for document like license.

C. Loomis – Integration Status- October 31, n° 6 (Frascati) Schedule u October 22 n First beta release of DataGrid (CERN & Lyon) u November 15 n Initial limited application testing finished. n EDG software ready for deployment on partner sites. u November 30 n Widespread deployment. n ITeam machines form development grid. n Testbed 1 open to all applications. u December 25 n Testbed 1 finished. Site schedule to take into account application priorities. Cannot include US sites until acceptable US CA exists.

C. Loomis – Integration Status- October 31, n° 7 Middleware Status u WP1 n RB, JSS, II, UI (being ported to Globus2) u WP2 n RC API, GDMP (tested with Globus2) n SpitFire (tested) u WP3 n Schema MDS/FTree (testing, what tests needed in TB1?) n R-GMA n GRM/PROVE

C. Loomis – Integration Status- October 31, n° 8 Middleware Status u WP4 n Installation/Configuration Tools (tested) n Image Installation (testing) n Information Providers PBS, LSF (testing) u WP7 n Network monitoring (delivered)

C. Loomis – Integration Status- October 31, n° 9 Globus Status u Many EDG releases lately n Alpha9-Alpha12 n Combination of Globus/EDG fixes. n Added Netlogger in latest release. n See severe problems with Globus IO in latest versions. u Aside from problems: n JobManager works with PBS, LSF. n FTree works with information providers (Info. Providers being debugged) n MDS configured. n Job submissions between CERN & Lyon.

C. Loomis – Integration Status- October 31, n° 10 Immediate Plans u Get minimally functional Globus2 distribution. u Incorporate WP1 tools. u Get authorization scheme in place (grid mapfile) u Develop test suite. u Develop documentation n User’s Guide n Installation Guide n Developer’s Guide u Setup CERN machines with PBS, LSF “sites”, with MDS hierarchy. u Let “loose cannons” onto DataGrid. u...