Grant Community High School District 124 Fox Lake, Illinois High School Additions OWP/P | Cannon Design 2010 Exhibition of School Planning and Architecture
Grant Community High School District 124 Main Exterior Image
Grant Community High School District 124 Main Site Diagram
Exterior with Students Community/Planning: OWP/P | Cannon Design has served Grant Community High School District 124 since This series of additions and renovations has created a fresh identity for Grant High School and enabled the district to deliver third millennium teaching and learning.
Interior of Fieldhouse
Interior of Fieldhouse Lobby Learning/Physical Environment: The team relocated the school's existing library by creating a new 13,360 sf addition to house a Learning Resource Center, computer labs and several classrooms. High ceilings and low shelving provide openness in the resource center. Smaller learning spaces were created through organization of furniture and fittings. The resource center accommodates casual seating for individual learning, large movable tables for group or class collaboration and technology spaces. The design also maximizes the benefits of natural light. North-facing glass in combination with an eastern exterior sun-shading device minimize glare and create an inviting interior. (Continued on previous page.)
Exterior Day Learning/Physical Environment : (Continued from previous page.) The team also designed new educational wings for a science and art expansion. These additions added approximately 62,000 sf of classroom space to accommodate increased student enrollment. OWP/P | Cannon Design further expanded the campus with the addition of a 60,000 sf field house that serves as the new home for varsity athletics and physical education. The field house is accompanied by a plaza that serves as a gathering area and connection among all sports facilities, including a new synthetic turf sports field with bleachers.
Exterior in Shade
Interior of Learning Resource Center
Exterior at Dusk
Interior of Learning Resource Center
First Floor Plan
Second Floor Plan
Exhibition of School Planning and Architecture 2010 Project Data Submitting Firm :OWP/P | Cannon Design Project RoleArchitect/Engineer Project ContactRick Dewar, AIA TitleProject Director Address111 W. Washington Street, Suite 2100 City, State or Province, CountryChicago, IL Phone Joint Partner Firm:n/a Project Role Project Contact Title Address City, State or Province, Country Phone Other Firm:n/a Project Role Project Contact Title Address City, State or Province, Country Phone Construction Firm:IHC Construction Companies, LLC Project RoleConstruction Manager Project Contact Title Address1500 Executive Drive City, State or Province, CountryElgin, IL Phone
Exhibition of School Planning and Architecture 2010 Project Details Project Name Grant Community High School District 124 City Fox Lake StateIllinois District NameGrant Community High School District 124 Supt/PresidentJohn N. Benedetti, Ed.D., Superintendant Occupancy DateJanuary 1, 2010 Grades Housed9-12 Capacity(Students) 1,750 students Site Size (acres)n/a Gross Area (sq. ft.) 135,360 sf Per Occupant(pupil) 77 sf/student gross/net please indicate n/a Design and Build?Yes If yes, Total Cost:$30,700,000 Includes: Project costs If no,n/a Site Development: Building Construction: Fixed Equipment: Other: Total: $30,700,000