Experience of an Indian Refinery

Slides:



Advertisements
Similar presentations
Commissioning Approach Integrated Service Solutions
Advertisements

Preventing Equipment Failures
Kirkland Energy Services Your Logo Here Larry Kirkland President Larry Kirkland President KES.
Development of local content following the results of 2013.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
C2C TechnoSoft Pvt. Ltd. (an ISO 9001:2008 certified company) Concept to Commissioning.
How much do you do?. What is a Boiler? A boiler is a vessel that is is under pressure and is being heated. The boiler will have a National Board # on.
Objectives: Understand importance of utility and maintenance system in industry/plant.
"AIR COOLER" Heat Exchanger
PROJECT MANAGEMENT COLLABORATIONS A HYDROCARBON PERSPECTIVE.
Gas Transmission Pipelines
COMPANY PROFILE PYRAMID ENGINEERING PRIVATE LTD. THE COMPANY The Company was established in 2007, with a small group to provide Plant Maintenance, Small.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Project Phases of an EPIC Contract Pre Project Basic EngDetailed Eng Procurement Long Lead Items MC Prep Installation PC Execute PC and Commissioning Preparation.
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
MC and Commissioning Preparation
The art of Engineering
Equipment Familiarization Amatrol 850 Basic Hydraulic Training System
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
-P&ID- Piping & Instrument Diagram
Oxy Enrich Process for Capacity Enhancement of Claus Based
Jim Baughn K9EOH. Preview Fuel Sources Power Generators Capturing and Using Generated Power Solar Power Expansion Safety Questions.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
KHABAROVSK REFINERY HYDROPROCESSING PROJECT BASIS OF DESIGN APRIL 29th – MAY 3rd 2013, MADRID, SPAIN TRAINING COURSE.
Chennai Petroleum Corporation Limited ( A group company of IndianOil ) EMERGENCY PREVENTION, PREPAREDNESS & MITIGATION.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
HAZARD AND OPERABILITY STUDY
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Floating Head Heat Exchanger
Process Safety Management
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA Procedures FSKN.
1 Global MSD INITIATIVES Global Business Process Standardisation SCITe a) S & OP, b) OCI GAME COE Management Information Refinery Management System MSD.
“Fix Tube Sheet” Heat Exchanger
Produced by: Operations Turnaround Leadership and Integrated Turnaround Planning A. Bobby Singh, President Project Assurance, Houston, Texas.
Introduction to Hazardous Evaluation Techniques Guidelines for Hazardous Evaluation Procedures (1992 by AIChE). Second Edition with Worked Examples. Center.
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Are You Ready for an SIS? What to do before starting on your SIS…and after it’s installed March 24, 2009.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
DESIGN & DETAILED ENGINEERING CONSULTANT
BP AMOCO EXPLOSION MARCH ‘05 15 DEAD 100 INJURED 30 PUBLIC INJURED 8 IN CRITICAL CONDITION.
Stock Prep Summary Stock Prep (HD – Machines) – Phase 1: Secondary refiners to series operation and recirculation Piping, tie ins, order of preparation,
KSP Industrial Group Ltd. Engineering & Manufacturing WHCP, Dosing Pump, CIP & LBV, PLC & Gearbox
1 CHIYODA July Potentials in Iraq -. 2 Copyright © 2012 Chiyoda Corporation. All Rights Reserved. Corporate Vision : Energy & Environment in Harmony.
Project Management Terry A. Ring Chemical Engineering University of Utah.
Hydraulic Torque Wrench, RTJ Machining, Bolt Tensioners, Boltite.com.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
HAZARD AND OPERABILITY STUDY Brainstorming, Multidisciplinary Team Approach Structured Using Guide Words Problem Identifying Cost Effective.
Flow and Control Engineering Supplying Control Valves & Instrumentation to Heavy Industry and Chemical Manufacturing. Multi-Stage Steam & Condensate Control.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Line Blinding/Blanking Options
Arkom Engineering Consultants
Project Execution in Process Industry
Lined Manifolds datapipe MĂGURENI CONSTRUCŢII S.R.L.
Competence of Human Resources for Iran Nuclear Regulatory Authority
SK’s Lube Base Oil Production
Chapter 9 Safety Permit Systems
Fundamentals of PROCESS PLANT PIPING DESIGN
ChE 473K Plant Design R. Bruce Eldridge.
New Reactor Projects as Training Opportunities
Floating Head Heat Exchanger
Suryoday Technologies ISO 9001:2015 Co.
Controlling Project Cost and Schedule
Overarching Commissioning Plan
Piping and Instrumentation for Process Industries
Gas Transmission Pipelines
Presentation transcript:

Experience of an Indian Refinery Project Execution Experience of an Indian Refinery

Now CPCL is a group company of IndianOil Inception CPCL owns two Refineries in southern part of India with 220 thousand Barrels Crude oil processing per Day Company established in 1965 as a JV of GoI, NIOC of Iran & AMOCO, USA 50 thousand bbl / day grass root Refinery near Chennai, commissioned in 1969 in a record time of 27 months Before my collegues on the dias make presentation on Project execution ,let me give you an Indian Refiring Company's experience on project execution. Now CPCL is a group company of IndianOil Slide 2 of 31

Major secondary processing Panorama of Growth Year Capacity MMTPA Major secondary processing units 1969 Initial Capacity 2.5 Lube ,Cat Reforming,Diesel Desulphurisation,Vis Breaker 1980 Debottlenecked 2.8 1984 Doubled (Refinery-II) 5.6 FCC ,Wax 1985-88 Value Addition Projects Propylene,Food Grade Hexane 1993 Debotllenecked 6.5 CBR Refinery 7.0 2002 Debottlenecking-CBR 7.5 2004 3 MMTPA Expansion at Manali 10.5 Hydro Cracker, Cat.Reforming,Soaker Visbreaker CPCL has grown from a small 2.5 MMTPA refinery in 1969 to a Refining capacity of 10.5 MMTPA now. Its Manali Refinery is one of the most complex refineries in the country It’s the first refinery in the country to have two major secondary units i.e. FCC and Hydrocracker , coupled with mega LOBS production capability of several grades. It may be noted CPCL has cracked into the prestigious list of S & P . CPCL is one amongst the seven companies from India in the Global list of 300. CPCL has also leap fogged into rank no 6 from a position of 20 in 04 of Dun and Bradstreet amongst Oil and Gas sector .

Panorama of Growth Refining capacity expanded by revamp of plants and addition of new units In 2004 Capacity expanded from 130 to 190,000 Bbls/day by addition of new Crude Distillation, Hydro-Cracker, Cat.Reforming, Soaker Visbreaker Units Slide 4 of 31

Green Power Generation ENERCON Suzlon RRB Vestas NEC Micon Pioneer Asia GE, India Project was completed in 6 months from order

Water Management Projects In 1991, commissioned a 2.5 MGD City Sewage Reclamation plant In 2001, commissioned RO Rejects Recovery plant Additional City Sewage Treatment Project Capacity: 2.5 MGD Project cost : Rs. 46.68 Cr Commissioned : Dec ’06 Sea Water Desalination Project Capacity: 5.8 MGD Project cost : Rs. 231.34 Cr Scheduled completion: Dec ’07 Slide 6 of 31

Refinery Expansion Cum Modernisation Project 2004 A success story in Project Execution Licensor Selection Implementation Strategies Commissioning

Process Licensor Selection

Associated Utility & Offsite facilities

Implementation Strategies Project executed on a combination of Conventional and LSTK basis CDU / VDU, OHCU and U&O executed on conventional basis Hydrogen, NHT / CRU, VBU & SRU executed on LSTK basis Entire LSTK (200 M US$) bidding process completed in 99 days

Major Contractors Associated with the Project Bridge & Roof Petron Spicgel Nicco EPIL EIL BHEL BHPV L&T Punj Lloyd / Petrofac

Safety Management Safety features were incorporated right from design basis stage itself and during Finalization of P&ID & process package, Detailed engineering, 3 D modeling review, Hazop review etc. Safety was given top most priority during construction and commissioning.

3D Model & Hazop Review 3D Model (Plant Design Software package) was reviewed by CPCL in two stages. After the completion of 50 % & 100 % of engineering Interference checks were carried out Approach to equipments and valves for operation and maintenance After Engineering, Hazop review was carried out extensively in the presence of Licensor, PMC, CPCL team comprising of experts from Operations, Process, Engineering and Contractor.

Human resources Developing the trained manpower Operators with experience in high pressure units were positioned one year ahead. Blend of experienced operators from with in the refinery and new recruits. Class room training for two weeks. On the job training for two weeks in similar units. Simulator training for panel engineers. Interactive sessions for atleast one hour in a day. Pre-requisite for smooth commissioning is placing engineers right from beginning Operators with experience in high pressure units were recruited one year ahead. Blend of experienced operators from with in the refinery. (40:60)

Pre-commissioning Chemical Cleaning and Pickling Pressure Relief Valve Registration, Tagging, and verification of Relief Pressure Rotary Equipment & Instrument Checklist Check on Fire protection & Safety system Construction Safety Audit External Safety Audit by OISD team Construction area Turnover Chemical cleaning – pickling for compressor suction lines Construction safety audit – CPCL IOC Team

Pre-commissioning Special Concerns unique to High Pressure Units Makeup Hydrogen System RGC & Auxiliary Systems HP system - Reactor Internals PEG and RTJ Flanges Furnaces HP Loop Leak Test Interconnecting piping must be chemical cleaned and flushed thoroughly with nitrogen. Keep the RGC Dry Gas Seal System CLEAN Availability of spare MUG Reliable Recycle Gas compressor

High Pressure Reactors Pre-commissioning Important checks done Reactors expand several feet when heated – interference from piping and instrumentation Reactor internals marked before removing for easy reinstallation Levelness and tight fit of internals. Deviation can cause mal-distribution and poor radial spreads Coat the nuts and bolts with high temperature anti-seize compound Installation of quench piping Positioning of Temperature instruments inside Catalyst loading

Focus on High Pressure circuit Protocol established to check all flanges in HP circuit Healthiness of flange face Right gasket in place Torque tension values PSV Setting and validity Spring support release HP flange box-up Orifice plate Control valve stroke check Direction of High pressure valves PSV setting & validity Spring support release Vessel box up Column internals & Seal pan test Exchanger bundle pulling (Random

CPCL commissioned the entire process units without any setback and in a safe manner within stipulated time. Hydro cracker unit was commissioned in 35 days smoothly from pressure test of HP system in line with the process licensor schedule

Chevron Report on Commissioning ……This was a very successful and smooth commissioning. The entire CPCL staff should be credited for the many hours of hard work and preparation that went into this successful startup. When rating Commissioning of Hydro-crackers this one would be rated at the top and would be considered “WORLD CLASS”

Thank You