G J Hirst Central Laser Facility Status of the CTF3 Photoinjector Laser at CCLRC Central Laser Facility G J Hirst, M Divall, G Kurdi, W L Martin, I O Musgrave,

Slides:



Advertisements
Similar presentations
Photoinjector Lasers for Ultra-Bright Electron Sources
Advertisements

Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
LEReC Laser Controls & RF Requirements Brian Sheehy 10/31/13 Laser timing Laser design RF and Control Needs.
Simultaneous Four-Hall Operation for 12 GeV CEBAF Reza Kazimi November 2012.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
CNMFrascati 12/01/061 High Power Laser System for Advanced Virgo C.N.Man Design goals Present technology Other activities in the world Virgo+ and Laser.
CTF3 Laser Status Massimo Petrarca CLIC January
Fiber-Optic Communications
DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Linac Marx Modulator Update Trevor Butler 7/22/2015.
Motivation Yang You 1, Jinghong Chen 1, Datao Gong 2, Deping Huang 1, Tiankuan Liu 2, Jingbo Ye 2 1 Department of Electrical Engineering, Southern Methodist.
CTF3 lasers Marta Csatari Divall Eric Chevallay, Valentine Fedosseev, Nathalie Lebas, Roberto Losito, Massimo Petrarca, CERN, EN-STI CTF3 Collaboration.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
30. Nov I.Will, G. Klemz, Max Born Institute: Optical sampling system Optical sampling system for detailed measurement of the longitudinal pulse.
Servos Servos are everywhere. Elements of servo System -- to be controlled Sensor or detector -- measure quantity to be controlled Reference -- desired.
A fast RF kicker for the MEIC electron cooler Andrew Kimber Amy Sy 31 st March 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DMP Product Portfolio Femtosecond Lasers Trestles Ti:Sapphire lasers …… fs; nm, mW Mavericks Cr:Forsterite lasers
A 5 fs high average power OPCPA laser system for attosecond pulse production Philip Bates, Yunxin Tang, Emma Springate and Ian Ross Central Laser Facility,
Lasers for CTF3 and outlook for CLIC Marta Csatari Divall Eric Chevallay, Andras Drozdy, Valentine Fedosseev, Nathalie Lebas, Roberto Losito, Massimo Petrarca,
Linac Marx Modulator Update Trevor Butler 5/20/2015.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
CTF3 Collaboration meeting – CERN, January 2007 Laser system schematic 22 44 1.55  s 200  s, 5-50 Hz 15 kW 10  J 270  s ~2332 pulses 370.
Femto-second Measurements of Semiconductor Laser Diodes David Baxter
Travelling Wave Tube For Broadband amplifier helix TWTs (proposed by Pierce and others in 1946 ) are widely used For High average power purposes the.
LLRF for EUCARD Crab Cavities Graeme Burt (on behalf of Amos Dexter) Paris May 2011.
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Phto-injector laser chain NEWS Massimo Petrarca & Marta Divall.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Laser System Upgrade Overview
Phase Coding System tests at Milano CTF3 Technical meeting CERN 20/1/2008 I. Boscolo*, S. Cialdi, D. Cipriani.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Photonic Components Rob Johnson Standards Engineering Manager 10th July 2002 Rob Johnson Standards Engineering Manager 10th July 2002.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Oleksiy Kononenko CERN and JINR
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
An H- stripping laser using commercial, diode-pumped Nd:YAG amplifiers Russell Wilcox Laser Stripping Workshop, April 11, 2011.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
FLASH. Free-Electron Laser in Hamburg TTF/FLASH: Injector Performance Dark Current Video ‘flags’ Comments based on Desy visit, 5 th May, /19/2010Desy.
FUNCTION GENERATOR.
Preamplifier R&D at University of Montreal for the drift chamber J.P. Martin, Paul Taras.
Status of the SPARC laser and “dazzler” experiments
The ISIS Dual Harmonic Upgrade
The PHIN Photoinjector for CTF3
ILC/ATF-2 Laser System Sudhir Dixit (JAI, Oxford)
Steering algorithm experience at CTF3
Califes Laser Optical design
An X-band system for phase space linearisation on CLARA
Operation of the High-Charge PHIN RF Photoinjector with Cs3Sb Cathodes
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
history, status and upgrade
Nd:YAG Solid Laser 3-2 / A-1 on the ground
Phto-injector laser chain NEWS
CLIC Drive Beam Klystron Modulators
CLIC Drive Beam Stabilisation
Measurements, ideas, curiosities
RF-Gun for Phase-II RF Gun 10, June, 2016.
Laser Source for the g-g Collider Presented to: Snowmass 2001
ATF project meeting, Feb KEK, Junji Urakawa Contents :
CLIC Feasibility Demonstration at CTF3
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
Presentation transcript:

G J Hirst Central Laser Facility Status of the CTF3 Photoinjector Laser at CCLRC Central Laser Facility G J Hirst, M Divall, G Kurdi, W L Martin, I O Musgrave, I N Ross, E L Springate

G J Hirst Central Laser Facility Plan Laser system requirements Design overview Time structuring and stabilisation Status of system components Deliverable schedule Summary and issues

G J Hirst Central Laser Facility Requirements CTF3 will deliver 141 ns long trains of electron bunches at 15 GHz – 2120 pulses in total The CTF3 photoinjector, and hence the laser, will operate at 1.5 GHz. So (with an extra 212 pulses) the macropulses from the laser will be 1.55  s long The electron bunch frequency is increased in two combiner rings, the first of which needs the micropulses to be phase coded (333 ps delayed) Optimum operation of CTF3 requires very low bunch charge variation (~0.1% rms) Probe Beam 30 GHz High Gradient Test Stand Two-beam test stand Test Beam Line Combiner Ring and Transfer Lines

G J Hirst Central Laser Facility Laser requirements Photocathode materialCesium Telluride Laser output wavelength (UV)262 nm Laser fundamental wavelength (IR)1047 nm Laser materialNd:YLF Electron bunch charge2.33 nC Laser pulse energy (UV at cathode) 0.37  J Laser pulse energy (IR from final amp) 10  J Average IR laser power in macropulse15 kW Laser macropulse rate5 Hz – 50 Hz

G J Hirst Central Laser Facility Beam modulating components 22 44 1.55  s 200  s, 5-50 Hz 15 kW 10  J 270  s ~2332 pulses 370 nJ/pulse ~2332 e - bunches 2.33 nC/bunch Beam conditioner 1.5 GHz Nd:YLF oscillator 400  s, 5-50 Hz Diode pump 18 kW pk 3 kW 2  J 3-pass Nd:YLF amplifier x300 CW preamp 3 pass Nd:YLF amplifier x5 200  s, 5-50 Hz Diode pump 22 kW pk Optical gate (Pockels cell) Energy stabiliser (Pockels cell) Feedback stabilisation Phase coding Layout

G J Hirst Central Laser Facility Modulator requirements LASER POWER HANDLING: Quasi steady-state operation means gating must happen after Amp 2. Thermal limits mean it must happen before the doubler. The gating modulator must therefore handle the highest laser power Fast, periodic coding means fibre-modulation, with a power limit of ~1 W Voltage limits at high slew-rate require the stabilisation modulator to follow Amp 2. Feedback using the full 270  s macropulse (if implemented) would require the modulator to handle the highest laser power PHASE AND AMPLITUDE NOISE: These must be minimised SPEED: The gating can rise and fall in a few pulses The coding must take place between 1.5 GHz pulses i.e. very quickly The stabilisation should be as fast as possible, but will be limited by signal processing hardware

G J Hirst Central Laser Facility Fibre coding Fibre modulation, based on telecoms technology, is fast but lossy and limited in average power Measurements on the High Q system suggest 10dB loss before the preamp results in <3dB output reduction Issues include few ppm delay stability, operating point maintenance and polarisation preservation EO Modulator 140 ns macropulses Variable delay Variable attenuator 140 ns delay 320 mW in from oscillator ~30 mW out to preamp

G J Hirst Central Laser Facility Gating AO deflector could reduce power loading by >80% for most of the macropulse Pockels cell aperture is a compromise between speed and power handling Choice of Pockels cell material affects “ringing” (fluid-damping not possible at these powers) AO Deflector Output to doubler Pockels cell Input from Amp 2 RF Driver Pockels Driver

G J Hirst Central Laser Facility Pockels cell ringing KDP is a stable, sensitive EO material but is prone to crystal lattice motion (ringing) which causes birefringence oscillations BBO rings less, but has limited aperture and needs high drive voltage RTP rings the least, but is an “experimental” material, needing DC biasing and tight thermal control 1  s20  s Switched at 1064 nm Measured at 532 nm

G J Hirst Central Laser Facility Stabilisation  s 200  s, 5-50 Hz 15 kW 10  J ~2332 pulses 370 nJ/pulse ~2332 e - bunches 2.33 nC/bunch Beam conditioner 1.5 GHz Nd:YLF oscillator 400  s, 5-50 Hz Diode pump 18 kW pk 3 kW 2  J 3-pass Nd:YLF amplifier x300 CW preamp 3 pass Nd:YLF amplifier x5 Phase coding Optical gate 22 44 Pulse energies are sensed after Amp 2 Signal is amplified, offset and used to drive an EO stabiliser after the gating cell Stabiliser transmission is set to allow linear correction The average error corrects the Amp 2 pump diode current An arbitrary waveform generator (AWG) corrects reproducible dynamic errors e.g. Pockels cell ringing ADVANTAGES Scheme is simple and compact, so could be fast Sensing before the gate minimises switch-on transients Laser power at the stabiliser can be low DISADVANTAGES No automatic correction of residual error towards zero Manual tuning of gain & offset Elements after the sensor do not have their noise corrected 200  s, 5-50 Hz Diode pump 22 kW pk Energy stabiliser Stabilisation electronics Arbitrary waveform gen

G J Hirst Central Laser Facility Stabilisation  s 200  s, 5-50 Hz 15 kW 10  J ~2332 pulses 370 nJ/pulse ~2332 e - bunches 2.33 nC/bunch Beam conditioner 1.5 GHz Nd:YLF oscillator 400  s, 5-50 Hz Diode pump 18 kW pk 3 kW 2  J 3-pass Nd:YLF amplifier x300 CW preamp 3 pass Nd:YLF amplifier x5 Phase coding Optical gate 22 44 200  s, 5-50 Hz Diode pump 22 kW pk Energy stabiliser Arbitrary waveform gen Stabilisation electronics ADVANTAGES Bunch charge sensing covers all elements and has high sensitivity Sensing after the stabiliser allows full feedback correction DISADVANTAGES No correction signal until the macropulse begins Long signal paths mean slow response and increased EM noise pickup More sophisticated control electronics required

G J Hirst Central Laser Facility Status – Oscillator/Preamplifier Delivered, installed and commissioned in Q Has met all specifications Seems capable of accommodating coding hardware

G J Hirst Central Laser Facility Status - Diodes Amp 1 and Amp 2 diodes delivered Amp 1 diode chiller delivered and installed Water connected and tested to one Amp 1 diode stack Diode wiring designed with shielding to satisfy Low Voltage Directive Amp 1 drivers delivered and tests under way

G J Hirst Central Laser Facility Status – Amplifiers Designs complete All Amp 1 components delivered Amp 2 components in procurement or delivered (diode chiller outstanding) Amp 1 mechanical assembly tested Amp 1 diode plumbing, wiring and interlocking under way to Amp 2 ~6 ps 1047 nm 2  J/ micropulse ≤50 Hz macropulse rate Amp 1

G J Hirst Central Laser Facility Status – HG and Thermal Lensing Lensing will be compensated at 5 Hz macropulse rate Original plan: diagnose lensing and correct after Amp 2 testing Updated plan: a) model the lensing process to establish limits b) procure mounts and a range of lenses c) validate with Amp 1 measurements d) implement correction and confirm HG HG design complete – 2  and 4  based on Type 1 BBO Crystals ordered Thermal transients, particularly in 4  crystal, still uncertain (rotated crystal pair will be tested against single crystal for 4  Option for Type 2 2  in KTP for polarisation multiplexing to 3 GHz

G J Hirst Central Laser Facility CCLRC Deliverables Currently scheduled dates for deliverables are: 3.1.1Report on laser oscillator design Justification of commercial option 30/05/04 26/07/ Laser oscillator test results Testing complete and written up with High Q 20/12/04 10/06/ Report on laser amplifier Design report 30/05/05 TBD 3.1.4Report on UV conversion crystal comparison Crystal choice and specifications 20/06/05 23/12/ Amplifier test results Amp 1 test results 30/09/05 03/03/ Laser system test results and delivery to CERN31/03/06 02/06/06

G J Hirst Central Laser Facility Summary and Issues SUMMARY Oscillator and preamplifier commissioned Power Amplifier 1 under test and most Amplifier 2 components either delivered or in procurement Gating, coding and stabilisation subsystems planned and in pre-procurement or procurement HG crystals ordered and thermal lensing compensation begun Control and interfacing under development ISSUES Stabilisation control architecture to be decided Stabilisation system may need optimising in final environment Tight procurement will be needed to maintain delivery date Recovery of coding system losses

G J Hirst Central Laser Facility

G J Hirst Central Laser Facility X2 combiner ring 333 ps 1.5 GHz Deflector