Job Performance Requirement 10-25 Modified Gasner Bar Pack.

Slides:



Advertisements
Similar presentations
Tent Pitching.
Advertisements

Wildland Progressive Hose Packs The Original made NEW !
FIREFIGHTER I LESSON 12A. FIRE HOSE TERMS Expansion-ring gasket Expansion-ring gasket — Gasket used at the end of hose where it is expanded into coupling.
The Cleveland Load.
Loading the SAC-METRO pack. Coil the hose with the male coupling to the inside. Using a winding table or a Gnass Hose Winder to simplify this operation.
Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading.
Ropes and Knots Skill Drills.
HOW TO MAKE A RICE STRAW HAT BIBLIOGRAPHY CHINESE-STRAW-HAT.HTML.
Getting Wet Stuff to the Red Stuff For 300 Years
How to make a paper monkey plane By: Nicole Hall.
Blackwood Fire Company TL84 LDH Deployment/Restoration Training Module.
Job Performance Requirement Hoisting Ladders by Rope.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
Is My Tractor a “Low Profile Tractor”? December, 2010.
Water Pump Obstacle Creative Inventions and Robotics Click to see Video.
How to Change Windshield Wipers. Why is it that we never seem to remember to change our windshield wipers? You know you need 'em, you know they're cheap,
How to make a paper airplane
Rowing Form Winning Ways. Catch Catch Position Vertical Shins Relaxed Shoulders Straight Back 35 o Body Angle (spine vs. vertical)
Click to Enter. Circuit 1Circuit 2Circuit 3 Circuit 4Circuit 5.
Weaving. Cup Weaving 1.Draw 11 equally spaced dots along the top of the cup. 2.Cut a small cut at each dot. 3.Pull down each small cut so it stretches.
Part C  Accordion load  Lay the first length of hose in the bed on edge against the partition with the coupling at the rear of the bed  At the front.
Ropes and Knots Skill Drills.
Job Performance Requirement 14-2 Shoulder Carry. JPR 14-2A A The shoulder carry is useful for operations when firefighters will carry a ladder a good.
HOSE ROLLS Straight roll ◦Lay the hose out straight and flat on a clean surface ◦Roll the male coupling over onto the hose to start the roll ◦Form a coil.
 The first step is to cut the top half of the shirt off.  The next step is to find the bottom of the shirt. You then will cut thin slits into the cut.
1) Roll up the puttees. Start the roll by rolling the cotton tape, gradually towards the wool strip and roll that up as well. Roll the puttees up in so.
Job Performance Requirement 14-7 Three-Person Raise.
Job Performance Requirement Tying a Rescue Knot.
Bumper Line of Engine/tanker ’ Pre-connect of 1-3/4”. 50’ flat racked with flaps and 50’ rolled. The nozzle is attached to the rolled section.
Zero Waste Garment Sewing Instructions
Making your Vitamin/Mineral Foldout. Write your name and period. Fold “hamburger” with lines on outside. Be exact!
Job Performance Requirement Horseshoe Load.
The Westampton Rolls How to Pack and Pull the Westampton Rolls Hose Load.
Western Tacking Certification written portion. Vocabulary-Western Cinch A piece of equipment that is used to hold the saddle on the horses back. Latigo.
Press the 3-4 inch piece of fabric in half lengthwise. After pressing the small trim in half lay it on top of the medium cuff piece with raw edges together.
Presentation created by T. Trimpe Presentation was developed for use with DNA Jewelry lesson at
Build A Motor You must follow the directions step-by-step!
Job Performance Requirement 7-1 Donning SCBA  Over the Head Method.
Job Performance Requirement 7-8
Lay two pieces of paper on top of each other. Fold paper “hotdog”.
FVCC Fire Rescue LADDERS PART B.
Rolled Pillowcase by Elizabeth Evans
Job Performance Requirement 10-16
Job Performance Requirement 16-12
Job Performance Requirement 10-11
Job Performance Requirement 20-2
Job Performance Requirement 10-19
High-rise Pack Loading
Fire Hose, Nozzles, Streams, and Foam
2. Engage trained observer 3. Disinfect outer gloves
Making.
Job Performance Requirement 15-11
Job Performance Requirement 20-1
Wildland Progressive Hose Packs
Job Performance Requirement 15-13
Job Performance Requirement 10-15
Job Performance Requirement 10-31
Job Performance Requirement 15-21
Planting Forest Trees.
Loading the SAC-METRO pack
Job Performance Requirement 10-14
Job Performance Requirement 10-9
Job Performance Requirement 20-5
Job Performance Requirement 10-27
Napkin Folding Techniques
Job Performance Requirement 16-8
Job Performance Requirement 16-8
Job Performance Requirement 10-33
Job Performance Requirement 15-14
Presentation transcript:

Job Performance Requirement Modified Gasner Bar Pack

A Start at the male end of the hose (100 feet [30m]) and form a roll 30 inches (.8m) in diameter on flat ground. JPR 10-25A

B Continue to roll the hose in the direction of the rows and make the rolls as tight as possible. JPR 10-25B

C The completed field roll, with the female coupling on the outside, is ready for packing. Grab the outside of the hose roll near the female coupling and pull toward the center of the roll. JPR 10-25C

D The fold should now protect the female end. The top layer of hose can now be tied to the bottom layer using a piece of rope 32 inches long (0.9 m). Two rolls of hose may be placed together and tied off with rope on the outside of the rolls with a shoulder strap to allow carrying. JPR 10-25D