Wind Test Plan ●Test individual components, system in different conditions ●Calculate expected power under various conditions Wind block diagram.

Slides:



Advertisements
Similar presentations
Solar Array & Maximum Power Point Tracker Group Senior Design Project 2003 Stephanie Chin Jeanell Gadson Katie Nordstrom Advisor: Karen Panetta.
Advertisements

Chapter 7 Operational-Amplifier and its Applications
ECE Electric Drives Topic 6: Voltage-Fed Converters Spring 2004.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
Variable Frequency Drives VFD Basics
Rooftop Solar Systems Rooftop Solar System (Off-Grid) Reliance Solar Energy™, Ratnagiri.
Solar turbine. If the sun's rays fall on the photovoltaic cell, which is connected to the side of the windmill, it is converted into electricity able.
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
01/21/2004By: Strobridge & Sulkoski1 G.U.S.T.E.R. Status Report.
P07301 Summary Data Acquisition Module. Team Members.
Lesson 25: Solar Panels and Economics of Solar Power
DC bus for photovoltaic power supplying computing loads
ASPPRATECH.
Switch-Mode DC-AC Inverters
1 Institute of Mechatronics and Information Systems Control and Driving Systems.
Paper Title (use style: Paper Title) Authors Name/s Author/s affiliation: , department, name of organization, city, country I- Introduction  There.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
 Our energy efficient house is located in Los Angeles, California.  The 3 energy reducing features in our home are solar panels, Energy Star light bulbs,
Hybrid Wind and Solar Generation System MAY Team: Daoxi Sun, Riley O'Connor, Trevor Webb, Shihao Ni, Xiaokai Sun, Ben Ryan Advisor, Client: Venkataramana.
Hybrid Wind & Solar Generation Project
PV-DIESEL POWERED TRAINS
SMART SOLAR TRACKING SYSTEM FOR OPTIMAL POWER GENERATION
I. Background The increasing use of Renewable Energy Sources (RES) such as Solar Cell and Wind Turbine Power convertion from DC to AC The using of non.
AUTOMATIC VOLTAGE REGULATOR(AVR)
New Product Enhancements & VERSION 6.06 Firmware Enhancements GV3000/SEGV3000/SE.
AN INTERCONNECTION OF A PHOTOVOLTAIC GENERATOR (PVG) With THE POWER UTILITES GRID: Study Cases Dr. Maamar Taleb Electrical and Electronics Engineering.
Michael Ikerionwu 4 th year Electronic Engineering.
Conversion of Rural School to Alternative Green Energy.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Wind Turbine Simulation (Phase IV)
Chapter 9 Power Electronics and Clean Energy 1 “Introduction to Modern Power Electronics”, 2 nd Ed., John Wiley 2010 by Andrzej M. Trzynadlowski Chapter.
PRINCIPLES OF OPERATION
Procedures for managing workflow components Workflow components: A workflow can usually be described using formal or informal flow diagramming techniques,
Photovoltaic Systems – Residential Scale Part 2 April 2, 2014.
Balance of Systems (BOS)
Operational Amplifiers The operational amplifier, also know as an op amp, is essentially a voltage amplifier with an extremely high voltage gain. One of.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design I.
Development of Laboratory Module for a Small Wind Turbine System (Phase V) Slide 1 of 13 Team members: Adam Literski, Achila Jayasuriya, Eurydice Ulysses,
The wind is blowing on a turbine 10 feet in diameter at a velocity of 12 mph. What is the power developed by the turbine? Power = 0.5 x Swept Area x Air.
Simulink Simscape by Dr. Amin Danial Asham.
Water Flow GROUP A. Analogue input voltage results: Motor Input voltage( V) pin 12 Analogue input voltage (V) Display number
1 Analog versus Digital Information-bearing signals can be either analog or digital. Analog signal takes on a continuous range of amplitude values. Whereas.
INVERTERS REFERENCE 1. Power Electronics-(CH-8) M.S. Jamil Asghar
Tidal Barrage  Advantages  Renewable  No air pollution  No fuel costs  Produces lots of power  Disadvantages  Huge initial cost  Environmental.
2 TOUCH 2 ORDER ( T 2 O) Team # 13 Srichand Yella Anvesh Dasari Madhu Tummala Varun Vallabhaneni.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
DESIGN OF MONO-AXIS SOLAR TRACKING SYSTEM USING MICROCONTROLLER BASED STEPPER MOTOR KAMAL J K KOUSHIK VENKATRAMAN N PREM M PRASANTH K Guidance: Mrs.Kavitha.
Solar Patio Umbrella Final Presentation May 3 rd, 2016 Team #37 ECE 445 – Spring 2016.
AC Machines. BOOSTER Basic Function:- -Sometimes when we use electrical power we need different voltage level to main supply. It is provided by Booster.
IEEE CS 70 th Anniversary Student Challenge Project proposal entitled “Hybrid Power Generation System Using Wind Energy and Solar Energy” Submitted by:
Battery Box Project (Group #19) PRASH RAMANI MARCOS RIVED MARTIN.
Date of download: 6/26/2016 Copyright © ASME. All rights reserved. From: A Single Stage Photovoltaic Inverter With Common Power Factor Control and Maximum.
Date of download: 6/29/2016 Copyright © ASME. All rights reserved. From: Development of a Quick Dynamic Response Maximum Power Point Tracking Algorithm.
A NOVEL CONTROL STRATEGY FOR HYBRID AC/DC MICRO GRID SYSTEMS
Date of download: 7/6/2016 Copyright © ASME. All rights reserved. From: Fuel Cell-Based Powertrain System Modeling and Simulation for Small Aircraft Propulsion.
Family of devices. Important differences VC MC Technical data.
Ashan Perera Senior Design Project - Electronic System for Remote Water Quality Monitoring.
UOP ECT 246 All iLabs (Week 1 to Week 7) Check this A+ tutorial guideline at For more classes.
Power Electronics and Control in Wind Energy Conversion Systems
Rectifiers, Filters and Regulator
Date of download: 10/12/2017 Copyright © ASME. All rights reserved.
ANTI-COLLISON AND BRAKING SYSTEM
Date of download: 10/21/2017 Copyright © ASME. All rights reserved.
Example of PV System Design
DOUBLE INPUT Z-SOURCE DC-DC CONVERTER
What is MPPT and why it is needed? (Maximum power point tracking)
SELF-SUSTAINABLE SOLAR STREET LIGHT CHARGING
RV Solar Panel Installation
Presentation transcript:

Wind Test Plan ●Test individual components, system in different conditions ●Calculate expected power under various conditions Wind block diagram

Wind Design ●Anemometer ●Coupled motor and generator ●Rectifier ●Microcontrollers Generator/Motor and Drive Rectifier Anemometer

Current Wind Design ● Boost Converter ● Inverter ● Batteries/Load Boost Converter Wind System

Challenge: Identifying Solar Output ●Problems with measuring total output current of panels ●Difficulties with using previous measurement system Measurement system with analog inputs

Challenge: Finding Parameters of Components ●Powering the MPPT, power regulation ●Inverter installation and testing ●Modeling rectifier and boost converter ●Obtaining motor and generator parameters

Challenge: Coupling Motor and Generator ●Needed better fit, stability ●Designed in Inventor Inventor design Previous coupling mount New coupling mount

Challenge: Design of Wind Components and Enclosures ●Size constraints ●Reliable interconnections New Enclosures

Challenge: Combining Wind and Solar ●Connecting solar generation to inverter ●Unable to connect wind to inverter

Questions?