Opticon FP6 status FP7 status Gerry Gilmore coordinator.

Slides:



Advertisements
Similar presentations
CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,
Advertisements

- Slide 1 OPTICON Optical-Infrared Astronomy for Europe EC Infrastructures press day 7 July 2005 EC Infrastructures press day 7 July 2005 Gerry Gilmore.
12 August 2004 Strategic Alignment By Maria Rojas.
FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
South Africa’s S&T partnership with the European Union From FP4 to Horizon 2020 Daan du Toit Senior S&T Representative to the EU.
Jean-Pierre BOURGUIGNON
LAPA Strategic Plan - our future direction. Background From humble beginnings LAPA is a huge achievement for those founding members Successful in terms.
09A_MBM41_EurAqua_powerpoint This is the (draft) default presentation of EurAqua. Question 1: Does it meet your demands? What should be changed? Question.
Digital public services and innovation
Philip Diamond RadioNet Co-ordinator University of Manchester Jodrell Bank Observatory.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
José Manuel Fresno EURoma meeting Budapest, 8 November 2011.
How to prepare a good Eurostars application IBRAHIM SıNAN AKMANDOR EUROSTARS-2 IEP CHAıRMAN, 17 NOVEMBER 2014, BRUSSELS 1.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
NA5: Interferometry Forum Andreas Quirrenbach (U Leiden / U Heidelberg)
Heriot-Watt University, Edinburgh, UK Learning and Teaching Board Background on the Board Processes (to give confidence in the results) Progress so far.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
WEFO’s Horizon 2020 Unit: supporting Welsh organisations Geraint Green Head of Horizon 2020 Unit Welsh European Funding Office.
OPTICON Board Meeting, Grenoble October Project Scientist Report John Davies UK Royal Observatory Edinburgh.
1 ASTRONET PROGRAM STATUS as of Preliminary Board 1 st Meeting Paris, 31 May 2005.
AN INVITATION TO LEAD: United Way Partnerships Discussion of a New Way to Work Together. October 2012.
There are a number of different ways of managing transboundary river systems, and different institutional responses to these challenges.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
1 Informing a Data Revolution Getting the right data, to the right people, at the right time, on the right format Johannes Jütting, PARIS21 Tunis, 8 Decemeber.
Coordinator’s Report OPTICON 2 nd Board Grenoble, October
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
Althea Wilkinson RadioNet Project Manager University of Manchester Jodrell Bank Observatory Mid-Term Review Management Aspects Grenoble April 2007.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
Towards the definition of an eIRGRoma, 10 December An e-Infrastructure in Europe: a strategy and policy driven approach for a policy eIRG A pink.
Dr. Margaretha Mazura (EMF) ICT Day Opportunities to participate in EU ICT research projects San José, 16 February 2010 Principles of EU Research Funding.
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
Key Technologies Network Colin Cunningham. 11th Oct 2004 OPTICON Key Technologies Network Grenoble2 Objectives WP5.1: Workshops & Roadmapping: WP5.1:
“Thematic Priority 3” Draft Evaluation of IP + NoE.
1 27-Apr-2004AstroGrid Consortium Meeting - PL talk Agenda Tuesday status review / goals / science Lunch + AGLI Itn-05 review Dinner at Coton (share.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
ATTRACT – From Open Science to Open Innovation Information Sharing Meeting Brussels, June 19, 2014 Markus Nordberg (CERN) Development and Innovation Unit.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
111 Synthesis of Questionnaires. Thematic concentration  Most of the new member states support the suggested principle while maintaining the element.
Status and achievements of Opticon FP6 (+FP5) Gerry Gilmore coordinator.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
Review and next steps Declan Baharini. What we will be doing today Understanding the context of the review Looking at the outcomes of the online survey.
Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory Overall Objectives MTR: 12 April 2007 Grenoble.
MEDIN Work Plan for By March 2011 MEDIN will be 3 years into the original 5 year development plan started in Would normally ask for continued.
ELT=European Large Telescope Realistic goal: ALMA-like world partnership Unrealistic goal: our own one Unacceptable outcome: the third one, even if ours….
1 ASTRONET Coordinating strategic planning for European Astronomy.
ASTRONET Board: WP 3.1 Infrastructure Roadmap Progress Report Mike Bode Astrophysics Research Institute, Liverpool JMU, UK.
Funded by the European Commission WHAT MAKES A GOOD PROPOSAL?
TOWARDS “CLEAN” MINING TECHNOLOGY THROUGH TECHNICAL SCIENTIFIC INNOVATION Nicolae Ilias, Romania.
Exec/Board Paris February 2008 WP3.1 Infrastructure Roadmap: Progress Report.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
OPTICON Board Meeting Porto 2008 The OPTICON I Million Euro EC grant over 5 years 47 partners, many involving several labs/telescopes under single.
1 Voluntary and Community Sector Review Voluntary & Community Sector Review Grants Strategy Working Party Participative Session 28 September 2006 Appendix.
Kathy Corbiere Service Delivery and Performance Commission
LISA News from ESA O. Jennrich LISA Project Scientist.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
The Role of an Access Programme: Lessons for FP7 Birgitta Nordström Niels Bohr Institute, Copenhagen University Denmark.
INFSO-RI Enabling Grids for E-sciencE EGEE Contributions to e-Infrastructure policy work Matti Heikkurinen, NA5 leader, CERN EGEE.
Army Directorate of Public Works Support Contractor of the Year Building a government contractor for the 21 st century By Carlos Garcia Owner and CEO KIRA.
REVIEW OF EARLY YEARS, CHILDREN’S CENTRES AND FAMILY SUPPORT PROPOSALS FOR CHANGE.
Torbay Council Partnerships Review August PricewaterhouseCoopers LLP Date Page 2 Torbay Council Partnerships Background The Audit Commission defines.
Outcomes, Values and Priorities Workshop 1 Redesign Board 10 th May 2016.
The CFP AND the role of science, innovation and advice Tallinn 28 th May 2013 SCAR-Fish report:
State of World’s Cash Report:
ASTRONET Coordinating strategic planning for European Astronomy
OPTICON The Optical Infrared Co-ordination Network for Astronomy.
Christine Kormann Eurostat Task Force Integrated Planning ESS RDG
Presentation transcript:

Opticon FP6 status FP7 status Gerry Gilmore coordinator

Coordinator? The coordinator doesn’t actually do much: just the EC-level contract, reporting and finance stuff. The real point of, and activity in, OPTICON are the JRAs, the Access program, and the Networks.

EC interface Our two day-to-day contacts are Maria (contract, and reports) and Sara (finances). Both leave very soon. New people for us to get to know. Thanks, Maria and Sara And best wishes for your futures

OPTICON FP6 I3 RII3-CT Gerry Gilmore; Coordinator

85 organisations, 47 partners, 17 countries, 3 INOs € 19.2M EC funds €27M total program Gerry Gilmore; Coordinator JRAs: 6 projects, totalling ~€10.5M Access: 17 observatories, 22 night-time and solar telescopes, total ~€5M Networks: various activities, totalling ~€3M Management: total ~€1M RII3-CT

OPTICON FP6 Contract Process Original proposal submitted April Approval of 50% support: July (Zeroth executive: , Crete) Contract `negotiation’: August 03-Mar 04 Consortium Agreement completed: Jan 2004 Contract start date: January First Board meeting: April (Gent) First Executive meeting: April Contract formalities complete: July 2004 Funding received and distributed: Sept 2004 Key point today: the very long times......

top-level Goal: develop the technologies and strengthen Europe for the future Gerry Gilmore; Coordinator JRA technology developments focussed on early proof of key future technologies: Adaptive Optics, fast detectors, new spectrographs, VLTI… to improve 4-8m’s now, and prepare for the next generation; NETWORKS to develop and expand user community, develop ELT science case; ACCESS to get best value from extent 4m telescopes, and lead the users beyond the historical small observatories to use the best available.

FP6 JRA Activities JRA1: MCAO Adaptive Optics JRA2: Fast wavefront sensors for MCAO JRA3: Fast sensors for astronomy JRA4: Optical/IR Interferometry JRA5: Smart Focal Plane Technologies JRA6: VPH gratings for spectroscopy

FP6 Access programme 17 observatories: ALL European-owned 3-4m telescopes worldwide; All Solar Telescopes at Teide/La Palma; Major coordination effort for instrument enhancements  cost-effective operations, release funding for other new developments; Major goal: to introduce central Europe to the best facilities, ready for the future; Related (MC) enhancement/schools programme

FP6 Networks N1 management N2 ENO activities (various) N3 Structuring: ELT Science, UV, HTRA, S/W environments, Technology Roadmap N4 FP7- research support, innovative fellowship schemes, ESA link… N5 Interferometry N6 Telescope Director’s Forum

OPTICON I Includes all the European major agencies and countries Supports open (European) access to all Europe’s 2-4m’s Supports networking to develop future projects Supports AVO, access etc to integrate Europe Mostly: supports technology developments (mostly) for ELT-related developments Budget is (only) €20+25M over 5 years Sponsors ELT science case development NOTE: ELT is a separate programme, with its own budget: ELT Design Study =€22/42M Reports at this meeting to show what has been achieved.

OPTICON Payments from the EC

General activities Four annual reports completed Each year careful financial review Funds received and distributed annually Successful mid-term review Development of FP7 proposal Now finalising FP7 contract

Specific admin status and activities Careful financial review implies planned 0.5% reserve We will work with partners to use this effectively Final FP6 report due early Work to start now. FP7 proposal written (huge effort), and supported at a depressingly small level. Horrible cutbacks required We hope many will be ``just`` delay, not termination Future FP7 CfP schedule and policy still unclear Active contract negotiations underway Money will no doubt be very late. Again.

I3 Coordinator’s Forum The (20+) I3s have similar challenges and difficulties, and so can benefit from a concerted view; The I3’s ``represent’’ most users of most European major Infrastructure at least as well as any other extant organisation does, so the EC needs our involvement; Our combined opinion was input to FP7 planning: didn’t seem to help much....

The good news: Opticon is a big success Marseilles 2003 Florence 2004 Florence 2005 The astronomers like what we have done, and want more: let’s be optimistic!

Admin Status summary From my perspective, all the activities are productive and worthwhile We do try to minimise the admin load on you... We are working to get the FP7 contract and funding available soon, but things in the EC are very slow, in spite of a lot of goodwill. This implies some uncertainty for 2009 activities Next board at JENAM 2009, Hatfield UK, April What are the strategic issues?

OPTICON FP7: top level requirements To build the European astronomical community (access, networks) –Many science- or methodology- based communities have thought clearly about their ambitions and needs, will benefit from and contribute to the whole community by being embedded in a larger structure, and so require an umbrella: Interferometry, Solar, UV, ELT science,(FASE?) –Some communities remain isolated, and need us to act proactively for the greater European good – eg central Europe: should we? –Are we doing all that is reasonable here???? To strengthen the community consistently with agreed strategic goals –E-ELT must be the priority, with significant enhancements of extant 4- 8m’s from their use as test-beds providing both shorter term and strategic value –The adaptive optics, detector development, instrument development, and focal planes work matches this: is the balance close to reasonable? To support promising longer-term technological developments which are potentially of very high European value –KTN planning work has identified several promising, relatively low-cost, post-FP7-maturity investments which need investment, subject to progress evaluation – eg photonics, new materials

What is next? Our initial challenge was focussed on helping build a single E-ELT project, with strong and wide community involvement, and helping strengthen European astronomy more generally. When the ELT becomes a fully-funded project – soon! – Opticon’s role will evolve. Strong EII/VLTI, innovative technologies and Solar/EAST activities have developed, in spite of limited funding Short term – using our wide bottom-up community links to implement the AstroNet strategy plan – medium telescopes review panel, and spectroscopic review. Longer term – you need to decide what you want, subject to available funding

What is OPTICON REALLY for? To help integrate and so strengthen European astronomy To help focus EC funds where astronomy needs them To `jump through the hoops’ to get new EC funds. for technology, for development, for ELT studies To set up a structure which will improve the chances of MAJOR EC funding in a few years (FP7/8/9) FP5=1Meuro FP6=20M+20M (opticon), plus 12M+ for radio and ALMA and 7M ILIAS astroparticles) plus design studies TBD FP7 = ????? linear or logarithmic?? This was an FP6 prediction slide....

FP7 OPTICON: top level implementation There is not all that much money available: –`real terms’ FP7 budget substantially cut from FP6 level –Notional 60% decrease per year, and ~10 years of inflation –Change in accounting model is NOT neutral: 75% EC support saves the agencies funds. It will produce more work only if the `saved’ resources are retained, but not matched by EC. Old 1:1 match requires a 3:1 match to retain agencies support – we do not have 300% more EC cash. Opticon future ambitions will have to be debated by the Board when we know more about likely future funding levels and timescales – next meeting? Jenam 2009 Some issues we can consider today

Opticon future – issues for the Board There are many organisations – some FP6 partners – who can contribute to, and benefit from, Opticon participation. They can’t all be partners (admin load): Should we, and if so, How, do we involve them? –Superboard? Invite to annual Board? Associates? –Invitation? CfP? Nomination? By whom- a WG? –Open session at Jenams didn’t work –Or is most interest at JRA level?  more network funds for open specialist meetings? –This we can do now – low cost –(maybe also improve gender representation?)

Opticon future – issues for the next Board –All strategic options depend on EC funding levels and stability. When we know that, it is time to reconsider the structure*. –More or less of JRA/Access/Network? –More or less risky innovation in JRA (depends on matched funding), to deliver uniqueness? –Are we affected by ERC? –How should Opticon be coordinated –By whom? –WG/Board chair to develop an options paper? –* change we can believe in...

The AstroNet Medium Telescopes Review- ETSRC AstroNet Board established, implementation utilises the Opticon community connection. Chair: Janet Drew; Co-Chair: Jacqueline Bergeron Members: Jerome Bouvier (Grenoble) Margarida Cunha (Porto) Angeles Diaz (Madrid) Geza Kovacs (Konkoly) Andreas Quirrenbach (Heidelberg) Clive Tadhunter (Sheffield) Massimo Turatto (Padova) Jose (Pepe) Vilchez (Granada)

ETSRC Remit: 1.adopt the strategic science plan for the future from the AstroNet community-based review relevant to 2-4m telescopes; 2.Identify a realistic balance of facilities, (new?) instruments and capabilities which will deliver that science roadmap; 3.Consider how to move from where we are today to a future where European-wide coordination, specialisation, and complementary planning, will lead to the most appropriate and cost-effective set of telescopes for future science delivery. 4.Consider the global situation where appropriate 5.Goal: report by September 2009.

ETSRC First meeting with agencies Dec Will get facility information through Opticon Telescope Directors’ Forum. Will get community views through an AstroNet-like web system Will hold open community meeting at Jenam 2009 Opticon will inform all astronomers through the access programme and observatory web sites of the opportunity to contribute EAS will also spread the word Other suggestions?

Other AstroNet strategy implementation Wide-field multiplexed spectroscopy WG AstroNet roadmap identifies a gap in future planning, for massive spectroscopic surveys (cosmology and Gaia- like science) Set up a WG to look at science cases (available), technical options (needs thought), and possible implementations (needs more thought...). Need to include all European (part-)owned large telescopes: ESO/VLT; LBT; Gemini; GranteCan; And wide-field telescopes: AAT, CAHA, CFHT,... Plan to start this soon.