Schools Lighting Hours of Use Data Regional Technical Forum May 13, 2014.

Slides:



Advertisements
Similar presentations
Project Proposal: Multifamily Weatherization UES Scoping Study Regional Technical Forum June 1 st, 2011.
Advertisements

UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
T12 Replacements with HPT8s in Kitchens and Garages Regional Technical Forum October 15, 2013.
Residential LED UES Measure Update Regional Technical Forum August 20, 2013.
Lighting Hours of Use EnergyStar New Construction David Baylon.
The Saga Continues: Measure Interactions for Residential HVAC and Wx measures Regional Technical Forum April 23, 2014.
RTF Small / Rural Subcommittee Schools Lighting UES Discussion Wednesday, April 30 1pm – 2:30pm 1.
Residential Clothes Washers and Dryers Technical Subcommittee Ryan Firestone & Christian Douglass Regional Technical Forum March 10, PM.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Advanced Power Strips (APS) Planning UES Measure Proposal Regional Technical Forum August 20, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N DRAFT: Methods for Evaluating Residential Behavior-based Programs RTF Presentation February 2,
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Lighting Savings Calculations for Northwest Energy Star ® Homes David Baylon.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Scientific Irrigation Scheduling Provisional Standard Protocol Ryan Firestone Regional Technical Forum February 18, 2015.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Nonresidential Lighting Subcommittee November 6, 2014.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Residential Behavior Programs RTF Subcommittee Ryan Firestone September 17, 2015.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Standard Information Workbook (SIW) Update Proposal Regional Technical Forum May 13, 2014.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Commercial Showerhead UES Measure Update Regional Technical Forum April 16, 2013.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
Scientific Irrigation Scheduling Provisional Standard Protocol Regional Technical Forum November 19, 2013.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Staff Updates Regional Technical Forum March 20, 2013.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
SEEM Calibration for Manufactured Housing Regional Technical Forum December 13, 2011 Analysis Performed ByAdam Hadley Cursory Reviews ByTom Eckman, Ben.
T12 to HPT8 Change-outs Small/Rural request for development May 15, 2012.
Residential: Appliances Refrigerator/Freezer Decommissioning: Early Retirement and Recycling May 15, 2012 Measure Status Change Recommendation.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat Proven UES Measure Proposal Regional Technical Forum October 16, 2013.
BPA Impact Evaluation Policies QSSI. 2 Drivers: Industry Best practice, Power Act, RTF Guidelines, confidence savings.
Structure and Integration of RTF Guidelines: Savings, Lifetimes and Cost/Benefit July 17, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011.
Commercial Clothes Washer UES Measure Update Regional Technical Forum April 16, 2013.
Residential Showerheads UES Update Ryan Firestone Regional Technical Forum October 20, 2015.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
Residential Refrigerator UES Measure Update Regional Technical Forum April 16, 2013.
Non-Residential Network Computer Power Management Christian Douglass Regional Technical Forum January 21, 2016.
Wood Smoke: Monetizing Health Benefits Regional Technical Forum August 23, 2013.
Agriculture Irrigation Hardware UES Measure Update Regional Technical Forum April 16, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Exterior LED Area Lights
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
3/12/ Regional Conservation Resource Supply Assessment Who Wants It & Why How We Propose to Do It And Whose to Blame If We Fail.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
Guidelines Revisions Next Steps April 23, Process to Date Staff and others identified a number of “issues” since guidelines were last approved April.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Enhancing Small, Rural and Residential Utility Access to Efficiency Measures Small and Rural Utilities and the Regional Technical Forum.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Proven UES: Residential Dishwasher Proposal to Deactivate Jennifer Anziano Regional Technical Forum November 10, 2015.
Presentation transcript:

Schools Lighting Hours of Use Data Regional Technical Forum May 13, 2014

Overview In 2013, the Small Rural Subcommittee commissioned SBW to develop a Schools Lighting UES measure. The Subcommittee recently decided to drop the pursuit of this measure because of the large number of measure variants required. 2 During the analysis, SBW and RTF Staff concluded that sufficient metered hours-of-use (HOU) data, by room type, were not available for schools in the Northwest. SBW and RTF Staff identified a thorough metered study of schools in Connecticut and Massachusetts conducted by RLW (now DNV/GL) in Staff would like to ask the RTF if this data would be sufficient for proven measures. If so, Staff will recommend the use of this data to the Non-Residential Lighting Subcommittee.

Schools Hours of Use Data Regional data is not available – RTF Staff requested metered data on schools from NW organizations. – PacifiCorp provided metered data from their impact evaluations The sample size of usable data was too small to draw conclusions from 6 schools, ~70 rooms across 15 room types, 2 weeks per fixture Excellent data from the Northeast is available – A thorough investigation of schools lighting hours of use and room occupancy was conducted by RLW (now DNV/GL) in 2005.* – ~80 schools, ~650 rooms across 15 room types, ~5 months per fixture – Lighting and occupancy logging of rooms without lighting controls; estimated both HOU and the savings potential of controls. Additional analysis of the RLW data would be necessary to satisfy RTF quality standards – Unclear how final results of study were derived (e.g., how metered and self-reported data were combined). – Study funders have granted DNV/GL permission to release scrubbed data to the RTF – Data would be detailed enough to adjust to differences in NE and NW school calendars and summer usage. – Costs: DNV/GL to scrub data. RTF to analyze data. – Benefit: Cheaper for the region than collecting this data through metering *RLW Analytics, 2007 “CT & MA Utilities Lighting Hours of Use for School Buildings Baseline Study Final Report.” Prepared for: Connecticut Light & Power Company, Western Massachusetts Electric Company, and United Illuminating Company. 3

Does the RLW Data Meet our Quality Standards? Guidelines Roadmap, Diligent Review “The RTF uses estimates of parameters, e.g., average length of a residential shower or heat/cool interaction factors, from studies performed by other agencies in estimating measure savings. The RTF must diligently review a study before approving the use of these values in the estimation of measure savings. A diligent review will include, but is not limited to understanding the characteristics of the sample studied, the study’s data collection methods and analysis methods, and the variability of the parameter estimates across the study sample. A diligent review will consider whether the sample is applicable to measures delivered in this region and if not whether it is feasible to normalize the results for application to this region.” With the proposed acquisition and analysis of data, Staff think that this data source would be sufficient for a proven measure. Would the RTF be amendable to the use of the RLW CT/MA Schools Lighting Data – with further analysis and adjustment to NW school calendars and summer usage – for Proven measures? 4

Next Steps If RTF approves of this data source and approach, Staff will recommend it to the Non-residential Lighting Subcommittee. The Operations Committee would need to approve any expenditures to acquire or analyze this data. 5