Water Resources Advisory Commission Lake Okeechobee Committee January 25, 2006 Susan Gray, Ph.D.

Slides:



Advertisements
Similar presentations
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Advertisements

Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
What are TMDLs? and What Might They Mean to MS4 Permittees?
To response to litigation, thirty Minnesota Cities were directed to perform antidegradation reviews or Loading Assessments for two time periods: (1) (1)
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Paradise Preserved: Springs Protection In Wakulla County.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Plum Creek Reservoir Water for a Better Tomorrow Kickapoo Tribe in Kansas January 13, 2003.
Florida Water Forum Everglades Restoration June 3, 2011.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Washington State Department of Transportation Stormwater Discharge Permit January 2008.
The South Florida Watershed
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Introduction to TMDLs for Nutrients Presented by: Dr. Scott Emery January 15, 2009.
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Water Resources Advisory Commission January 5, 2006.
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
River of Grass Phase I Planning Water Resources Advisory Commission Issues Workshop February 3, 2009.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Florida’s Unified Stormwater Rule Status Lake Okeechobee WRAC November 2007 FDEP, Chad Kennedy Presenting for Eric Livingston and Michael Bateman.
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Chesapeake Bay Policy in Virginia - TMDL, Milestones and the Watershed Agreement Russ Baxter Deputy Secretary of Natural Resources for the Chesapeake Bay.
Wisconsin’s Nutrient Reduction Strategy for Water Quality Wisconsin Crop Management Conference January 16, 2014 Ken Genskow, PhD Associate Professor, Department.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Governing Board Meeting January 11, 2006 Susan Gray, Ph.D.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
The Lake Okeechobee Protection Plan Evaluation Update, 2007 The Lake Okeechobee Protection Plan Evaluation Update February 8, 2007.
Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013.
Caroline County Pilot Watershed Implementation Plan (WIP) Katheleen Freeman, AICP, Director Caroline County Department of Planning & Codes Leslie Grunden,
AN INTRODUCTION TO STORMWATER AND STORMWATER MANAGEMENT Eric H. Livingston Bureau of Watershed Management Florida Dept. of Env. Protection Tallahassee,
Lake Okeechobee Regulation Schedule
St. Johns River Water Management District Central Florida Water Initiative Water Supply Plan Mike Register, P.E., Director Division of Water Supply Planning.
SB 536 Study and Report WateReuse Florida November 9, 2015 Janet G. Llewellyn Office of Water Policy Florida Department of Environmental Protection.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
COMPREHENSIVE EVERGLADES RESTORATION PLAN …different cultures -- same Team.
EVALUATING WATERSHED MANAGEMENT PLANS NUTRIENT MANAGEMENT APPROACHES IN THE LAKE ERIE BASIN AND KEY LOCATIONS OUTSIDE OF THE LAKE ERIE WATERSHED Ohio Stormwater.
May 12, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
May 11, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Florida Water Forum Springs and Estuaries Drew Bartlett
Presentation transcript:

Water Resources Advisory Commission Lake Okeechobee Committee January 25, 2006 Susan Gray, Ph.D.

2 Lake Okeechobee and Estuary Recovery  A combination of capital projects and numerous interagency initiatives  Designed to provide measurable and meaningful improvements to water quality and water quantity in Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries

3 LOER Components and District Lead Responsibilities  Lake Okeechobee Fast Track Projects  Revise Lake Okeechobee Operating Schedule (will require significant District support)  Set TMDLs for tributaries  Mandatory fertilizer BMPs  ERP Revisions  Alternative storage/disposal of excess surface water  Innovative land use planning  Eliminate land application of wastewater treatment residuals  Lake Okeechobee Protection Program  CERP Lake Okeechobee Watershed Project

4 Lake Okeechobee Fast-Track Projects 5 construction projects north of Lake Okeechobee: Nubbin Slough STA Expansion Taylor Creek Reservoir Lakeside Ranch STA Rerouting Runoff from the S-133 Basin Rerouting Runoff from the S-154 Basin 5 construction projects north of Lake Okeechobee: Nubbin Slough STA Expansion Taylor Creek Reservoir Lakeside Ranch STA Rerouting Runoff from the S-133 Basin Rerouting Runoff from the S-154 Basin

5 Lake Okeechobee Fast Track Projects Point of Contact: Harold Aiken/Mark Long/Denise Arrieta Steps to implementation/Schedule:  Initial design and data collectionNov ‘05 – Mar ’06 (Conceptual design being conducted by CDM)  Develop Basis of Design ReportApr ‘06 – Oct ‘06  Obtain Design Criteria Approval Nov ‘06  Obtain PermitsOct ‘06 – Sept ‘07  Nubbin Slough expansion permitsJan ‘06 – Aug ‘06  Nubbin Slough constructionSep ‘06 – Dec ‘07  Construct remaining Fast TrackMar ‘08 – Dec ‘09 projects Completion Date2009

6 Permanent Forward Pumps for Water Supply during Droughts Point of Contact: Larry Carter/Karen Counes Steps to implementation/Schedule:  Develop Basis of Design ReportJan ’06 – Aug ‘06 (SOW, preliminary operating criteria under development)  Obtain Design Criteria Approval Sept ‘06  Design Pumps/StructuresOct ’06 – Sept ‘07  Obtain PermitsOct ’06 – Sept ‘07  Construct Pumps/StructuresOct ’07 – Sept ‘09 Completion Date:2009

7 Revise Lake Okeechobee Regulation Schedule Revise the Lake Okeechobee Regulation Schedule  Work with U.S. Army Corps of Engineers to revise federal regulation schedule levels  Achieve a better balance among lake management objectives

8 SFWMD Support to ongoing revisions to the Lake Okeechobee Operating Schedule Phase I completion date:December 2006 Phase II completion date:2010 SFWMD Point of Contact:Kim O’Dell Steps to implementation/Schedule:  SSM & water shortage modeling Oct ’05 – Aug ‘06  Seed bank evaluationOct ’06 – Jan ‘07  Evaluate feasibility of spring recessionNov ‘06  Re-map lake sedimentsApr ’06 – Apr ‘07  Review in-lake dredging optionsJun ’06 – May ‘07  Ecological/hydrological modelingOct ’05 – Sep ‘07  Purchase temporary pumpsFeb ’06 – Aug ‘06  Electrical, installation platforms forAug ’06 – Jan ‘07 temporary pumps

9 Revise ERP Criteria  Revise the Environmental Resource Permit (ERP) criteria to better address the water quality impacts due to new development and land- use changes within the Kissimmee, Lake Okeechobee, Caloosahatchee Estuary and St. Lucie Estuary watersheds Supplement the Environmental Resource Permit (ERP) Criteria

10 Revise ERP Criteria Point of Contact:Damon Meiers Steps to implementation/Schedule:  Revise Lake O Protection ActJan ’06 - July ‘07  Develop guidelines to determineJan ’06 – Dec ‘07 P loading and BMP credits  ERP rule revisionsFeb ’06 – Dec ‘07  Coordination with State-wide ERPFeb ’06 – Dec ‘06 review Completion Date:2008

11 Alternative Storage/Disposal of Excess Surface Water  Identify alternative sites on public, private, and tribal lands for moving and storing excess water from the lake and its tributary basins to help reduce high discharge volumes to the estuaries  Assess feasibility of deep well disposal and ASR options for Taylor Creek and the Brighton Reservation Options for Storage and/or Disposal of Excess Surface Water

12 Water Storage Assessments: Study Areas Figure 2

13 Point of Contact:Benita Whalen, P.E. Steps to implementation, schedule:  Ongoing communication with public and ongoing private land owners on storage opportunities  Complete public lands assessmentsDec ‘05  Complete conceptual designs & cost estimatesMar ‘06 for public land storage  Evaluate cost-effectiveness of storage optionsApr ‘06  Initiate construction of 4 pilot facilities onApr ‘06 private lands  Complete private & tribal lands assessmentsJun ‘06  Enter into agreements on additional sitesDec ‘06  Design, construct, monitorJan ‘07 – Dec ‘09 Completion Date2009 Alternative Storage/Disposal of Excess Surface Water

14 Point of Contact:Scott Burns/Robert Verrastro Steps to implementation, schedule:  Assess feasibility of reactivating TaylorJan ’06 – Jun ‘07 Creek ASR well  Feasibility of deep well injectionJan ’06 – Jan ‘07  Conduct pilot ASR for Brighton ReservationJan ’06 – Apr ‘08  Design and permitting of 10 ASR wellsJan ’06 – Jun ‘07  Construct & begin operation 10 ASR wellsJul ’07 – Dec ‘09 Completion Date:2009 Alternative Storage/Disposal – Deep Well Injection and ASR

15 Continued Implementation of the LOPP & CERP LOWP  Comprehensive, phased approach already under way to reduce phosphorus loadings and provide water storage to the lake by 2015 Continued Implementation of the Lake Okeechobee Protection Program and CERP Lake Okeechobee Watershed Project

16 Point of Contact:Susan Gray / David Unsell Steps to implementation, schedule:  Ongoing water quality projects, lake2004 – 2015 and watershed assessments for LOPP  Flow ways feasibility studyJun ’06 – Sep ‘07  LOWP CERP PIR completionJan ’06 – 2008  LOWP CERP land acquisitionJun ’07 – 2012  LOWP CERP design and permitting  LOWP CERP Construction2010 – 2015 Completion Date:2015 Continued Implementation of LOPP and CERP LOWP

17 Set TMDLs for Lake Okeechobee Tributaries - FDEP  Speed up development of total maximum daily loads of phosphorus allowed for the Lake Okeechobee watershed tributaries to protect and restore downstream water bodies TMDLs = Total Maximum Daily Loads

18 Mandatory Fertilizer BMPs - FDACS  Revised application rates for agriculture; low phosphorus for urban use  Reassess fertilizer application rates for agriculture and encourage the development and use of low phosphorus fertilizer in urban settings Mandatory Fertilizer Best Management Practices (BMPs):

19 Innovative Land-Use Planning - FDCA  Innovative land-use planning techniques, including use of Florida’s Rural Land Stewardship Areas Program, to facilitate the acquisition of lands for public works Growth Management to Encourage Innovative Land-Use Planning

20 Eliminate Land Applications of Residuals - FDEP  End the practice of depositing domestic wastewater residuals on land, which can result in excess nutrients getting in tributaries and estuaries Residuals Contain Nutrients that are land applied in Phosphorus-Sensitive Basins

21 Progress  Between 1998 and 2005, more than 35 projects have been completed in the north watershed.  Approximately 20 additional projects are under way and expected to be complete in the next one to five years.  Will prevent an estimated 150 tons of phosphorus from entering the Lake each year.  Will add approximately 280,000 acre feet of additional water storage to reduce impacts from flood-control releases to the estuaries

22 Summary of FY06 Activities

23 Summary of Estimated Costs for FY06  Lake Okeechobee Fast Track Projects  Permanent Forward Pumps  Lake Schedule Revisions  ERP Revisions  Alternative Surface Water Storage  ASR/Deep Well Disposal  Lake Okeechobee Protection Program  CERP Lake Okeechobee Watershed Project  FY06 T0TAL  $13,232,500  $1,800,000  $4,009,300  $0  $1,000,000  $ 900,000  $5,000,000  $ 200,000  $26,141,800

24 Lake Okeechobee and Estuary Recovery  All LOER components are progressing  At the request of the Governing Board, additional efforts have been incorporated including:  In-lake nutrient removal options Marsh flow-ways Sediment removal  Implement ASR  Feasibility of deep well injection

25 Opportunities for Local Government Participation  Implement stormwater utilities and stormwater retrofits  Assist with BMP implementation for low P fertilizer in urban settings  Move forward to convert septic systems to central sewers  Land acquisition for preservation & Restoration

26 Other Agency Actions  Implement Modified Water Deliveries  Removal of sediments and bank stabilization of the C-44  Retrofit S-308 and S-77 for mid or top water releases