2009 Domestic Scan of Accelerated Construction Practices.

Slides:



Advertisements
Similar presentations
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
Advertisements

Performance Contracting 2008 WASHTO – CMS Meeting April 8, 2008.
Work Zone Safety Using Accelerated Bridge Construction (ABC) Rukhsana Lindsey, UDOT Presented by Jim McMinimee Principal Engineer, Applied Research Associates.
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Utah’s Use of CMGC & Project Delivery
Connection Details for Prefabricated Bridge Elements and Systems
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Totally Precast Concrete Bridges
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
Presentation to Maxwell Place Homeowners Association 1.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
April 25–27, 2005 Phoenix Civic Plaza/Hyatt Regency Phoenix Phoenix, AZ NCMA World Congress 2005 “Prime Time: Contract Management at the Core of the Enterprise”
 Project Delivery  Design Considerations  Lessons Learned.
Construction Industry Efforts and Capabilities to Support PBES Deployment. William G. Duguay J.D. Abrams, L.P.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Overview of the Federal Aid Process for Transportation Projects.
Construction Engineering 221 Contracts & Contractor Procurement.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Construction Contractor Series #3: Experiences with ABC Projects in Massachusetts.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
NE Regional statistics and discussion guide report Summary
Managing Fast – Tracked Projects: A Review of ECI Report Dr
Cindy L. Menches, Ph.D., P.E., The University of Texas at Austin Electri’ International Annual Meeting, July 2007 Characteristics+ Planning Achieving Performance.
2009 Domestic Scan of Accelerated Construction Practices.
1 P H I L L I P S T O N Route 2 Over Route 2A SPMT Heavy Lift September 8, 2015| Leading the Nation in Transportation Excellence |
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
3D Utility Data – Reducing Project Delays, Managing Assets 3D Utility Data – Reducing Project Delays, Managing Assets WASHTO 2015WASHTO 2015.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
MARYLAND FREIGHT SUMMIT Freight in the Mid-Atlantic Region Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration September.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
September 26, East Side Access Status Report to CPOC September 26, 2011.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
AASHTO TIG Ananth Prasad Chief Engineer, Florida DOT.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
Office of Major Project Development (OMPD) Overview November 2015.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Project Stakeholder Integration in Off-Site Construction May 24, 2016 Partners in Progress.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Totally Precast Concrete Bridges
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
New Bridge Construction
Sandra Larson, P.E. Iowa Department of Transportation
Totally Precast Concrete Bridges
Presentation transcript:

2009 Domestic Scan of Accelerated Construction Practices

2 Agencies are seeking ways to accelerate project delivery. You hear about: “Get in, Get out, and Stay Out.” The scan focus was on how to accomplish that dictum rapidly. Objective

3 From actual construction experiences identify:  Construction practices that speed project delivery.  Management practices that minimize the duration of work zone occupation. Objective

4 SCAN TEAM Thomas Bohuslav Texas DOT Richard Sheffield Mississippi DOT Brian Blanchard Florida DOT Steven DeWitt NC Turnpike Authority George Raymond Oklahoma DOT Clifford Schexnayder Arizona State University Chris Schneider FHWA, HQ Stuart Anderson Texas A&M

5 Projects Visited Accelerated Bridge Construction, Utah I-10 Houston Escambia Bay Bridge, I-10 (Emergency & Rebuild), Pensacola I-65/59 Bridges, Birmingham I-880 MacArthur Bridge YBI Viaduct Bay Bridge Duval St. Bridge & SR9A/I-295, Jacksonville I-40 Mojave Desert I-15 Repave I -5 Tunnel Fire Repair Russian River Bridge Queen Isabella Causeway

6 Acceleration Focus Areas  Acceleration related to emergency projects – emergency situation response  Project/Program construction acceleration – a planned approach

7 Emergency Acceleration Acceleration is often in response to an accident or unexpected event. Projects accelerated under emergency situations have very compressed schedules yet they still have to be delivered following sound design, construction, and management processes. This is the challenge!

8 Hurricane Ivan, Pensacola, Florida Night of Sept. 15/16, 2004 Escambia Bay I-10 Bridge

Date 2004Event 17 Sept.9:00 a.m. Pre-proposal meeting, Chipley, FL 17 Sept.1:00 p.m. Questions and Answer meeting 17 Sept.4:00 p.m. Price Proposals 17 Sept.4:00 p.m. Public Price Proposal open 17 Sept.5:00 p.m. Anticipated Execution Date 17 Sept.5:00 p.m. Notice to Proceed 11 Nov.Phase 1 complete, Westbound Bridge 16 Dec.Contract Completion Hurricane Ivan, Night of Sept. 15/16

10 Escambia Bay Bridge Looking West Acrow prefabricated steel bridge system All designs had to conform to the available materials.

11 Keys to Success  Delegated Contract Award and Execution to Local FDOT Office – This fast tracked the signing of a contract.

12 Escambia Bay Bridge, contract

13 Keys to Success  Basic Scope Only – Contractors need latitude about means and methods on these types of projects.  Work Concurrent with Design – The design has to utilize available materials.

14 Keys to Success  Availability of Materials – Hard to find materials during the early phase of the work.

Birmingham, Alabama Saturday morning January 5, 2002 I-65/I-59 Bridge after the fire

5 Jan.Saturday morning accident1 6 Jan.Decision a new bridge and select five contractors. 2 7 Jan.Monday Start design3 8 Jan.Tuesday, Prelim. Plans to Contractors 4 14 Jan.Monday 1:00 p.m., Pre-Bid10 16 Jan.Wednesday 10:00 a.m., bids12 18 Jan.Friday, Notice to Proceed14 21 Jan.Monday 12:01 a.m., Construction begins Feb.Opened to traffic54 Day I-65/I-59 Bridge

27 Feb Opened to traffic 54 Days after the accident

18 Keys to Success  Partnership – Decisions were made at the Project Level: verbal requests and approvals.  Mutual Trust – Contractor/ALDOT/Girder Fabricator

19 Keys to Success Cooperation – Rapid turn around of shop drawings. Planning – Very detailed planning and schedule.

I-580/880 MacArthur Maze, Oakland Sunday April 29, 2007

Day 29 Apr.Sunday, 3:41 a.m. tanker accident.1 30 Apr.Caltrans locating steel, begin design. 2 1 MayClean-up, inspection3 3 MayI-580 contract advertised.5 5 MayMandatory onsite bid conference.7 7 MayMonday, bid 10a.m., award 3:30 p.m.9 10 MayPenn. steel arrives fabricator in AZ12 11 MayBegin girder fabrication13 15 MayPrecast bent cap arrives at night17 24 MayThursday, opened at 8:40 p.m.26 MacArthur Maze

23 Keys to Success  Availability of Materials – Design to available materials.  Team Effort – Located people where needed.

24 Keys to Success  Incentive/Disincentive – The project was advertised with a $200,000 per day incentive/disincentive clause capped at $5,000,000.

25 Planned Acceleration Projects can be accelerated  by careful planning of preconstruction activities and  thoughtful staging of field operations

I-15 Devore Corridor, California Planned Construction Zone

28 Keys to Success  Contract – Incentive/Disincentive provisions  Design – Rapid-strength concrete and substituted AC base

29 Keys to Success  Public Outreach – Intensive outreach achieved a 20-percent reduction in peak-hour traffic demand

Duval Street Bridge, Jacksonville, Florida

31 Keys to Success  Partnering – Decisions and commitments were made and upheld  Demand services remediation contract – to handle site contamination

32 Keys to Success  Delayed construction start – A six month “procurement period.”  Up front planning – Level of detail in the contractor’s schedule.

33 Some agencies are beginning to institutionalize project acceleration through a program approach. A change in agency culture is required as well as a new paradigm Program Approach to Project Acceleration

34 Utah DOT Accelerated Bridge Construction (ABC) UDOT accelerated its program for the following reasons:  Reducing turn around times  Lessening the impact of their projects  Improving trust  Response to public desire

35 New UDOT Paradigm From “Lowest Construction Cost” to “Lowest Project Cost”

36 UDOT ABC Stats UDOT has 17 projects, including 80 bridges total, completed or under construction that utilized ABC –Self Propelled Modular Transports 4 projects/13 Bridges –Half Thickness Precast Deck Panels 2 Projects/47 Bridges –Prefab Bridges – “Lego Bridges” 2 Projects –Full Depth Precast Deck Panels 8 Projects/11 Bridges –Precast voided slabs 1 Project/2 Bridges –Segmental Bridges 1 Project/1 Bridge –Heavy Lift Cranes 1 Project/1 Bridge

37 UDOT ABC SPMT 1 st SPMT Project (I-215 at 45 th South) completed in 1 weekend during Additional SPMT Projects completed in ABC used as standard practice for future projects.

38 BENEFITS OF USING ABC Reduce TRAFFIC impacts Improve SAFETY to workers and public Improve QUALITY of constructed product

39 BENEFITS OF USING ABC COSTS savings Reduced ECONOMIC and Business impacts Reduced CONSTRUCTION SEASON Reduced ENVIRONMENTAL impacts

40 Success Fundamentals Partnering – People are the critical element in successfully accelerating a project.

41 Partnering Align goals Delegate Timely decisions

42 Success Fundamentals Design – Material Availability Logistics

43 The Fundamentals Planning – Detailed Backup plans Plan multiple fronts Look-ahead plans

44 The Fundamentals Contracting Strategy – Aligned with requirements Set an aggressive schedule with proper incentives

45 Conclusions Emergency Projects Contractor – Find a contractor that has the resources Experts – Ensure that experts are on the project

46 Conclusions Emergency Projects Agreement – Get an agreement Delegate – To the lowest possible level Scope – Expect changes

47 Conclusions DOT and contractor goals align when a partnering atmosphere is created and all team members view the accelerated work as an opportunity to demonstrate excellence.

Thank You!! We can Build Faster!